TOTAL QUALITY MANAGEMENT (Continuous Quality Improvement)

Slides:



Advertisements
Similar presentations
7 QC Tools.
Advertisements

Quality Improvement: Problem Solving
Quality control tools
Statistical Quality Control Basic Concepts Product Control Process Control Variations in Quality.
Process Control Charts VOCABULARY IMPORTANT TERMS: – Nominal: Data at expected value – Discrete: Data with only a finite number of values – Indiscrete:
Operations Management Statistical Process Control Supplement 6
17- 1 Chapter Seventeen McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Seventeen Statistical Quality Control GOALS When.
Eight Basic Quality Improvement Tools – Part 2 Quality Engineering and Quality Management 1 © University of Wisconsin-Madison.
Basic Seven Tools of Quality
Seven Quality Tools The Seven Tools
ISHIKAWA DIAGRAM – Tool for quality management Marit Laos IS Project Management
Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 4-20 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle.
Chapter 8: Quality Management Project Quality Management
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
MIM 558 Comparative Operations Management Dr. Alan Raedels, C.P.M.
Part Three TQM – The Tools and the Improvement Cycle
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
1 Continuous Improvement. 2 1.Overview of the PDCA Problem Solving Cycle. 2.Foundations of the PDCA Cycle 3.Plan Step 4.Do Step 5.Check Step 6.Act Step.
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
Quality Improvement: Problem Solving Quality Tools and Techniques.
Methods and Philosophy of Statistical Process Control
Property of School District of Holmen Bridging the Gap through Continuous Improvement.
IMPROVEMENT TOOLS Mahendrawathi ER, Ph.D. Outline  Classification of improvement tools  Purpose of the tools  Extent of change  Time and resource.
Statistical Process Control
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
Steps in Using the and R Chart
Quality Management Processes Plan Quality Management Perform Quality Assurance Control Quality.
1.Pareto Analysis 2.Fish Diagram 3.Gantt Chart 4.PERT Diagram 5.Job/Worksite Analysis Guide.
Operations Management For Competitive Advantage 1 Quality Management Operations Management For Competitive Advantage Chapter 7.
Problem Solving.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
Measure : SPC Dedy Sugiarto.
SEVEN QUALITY CONTROL TOOLS (or) OLD SEVEN TOOLS.
 What type of Inspection procedures are in use  Where in the process should inspection take place  How are variations in the process detected before.
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
Organize verbal information into a visual one, generally by writing down on separate pieces of paper AFFINITY DIAGRAM A sequenced plan.
Seven Old Tools of Quality Management
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
1 Project Quality Management QA and QC Tools & Techniques Lec#10 Ghazala Amin.
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
Data Collection & Analysis ETI 6134 Dr. Karla Moore.
TI 2111 Work System Design and Ergonomics 2. Problem Solving Tools.
Basic 7 Tools of Quality Presented by: Rajender Kumar, Asst. Prof.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Optimizing and controlling process through statistical process control Chapter 18 page 442 Doaa Abu Alwafa.
Tools for Problem Analysis. Outline  Cause-and-effect chart  Root cause analysis  Scatter chart.
8.1 Plan Quality Management
IMPROVEMENT TOOLS Mahendrawathi ER, Ph.D.
QUALITY CONTROL CHAPTER 8.
Quick Overview The Seven Tools
Total quality management
Statistical Process Control
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
Class 22: Quality Management
Operations Management
Fundamentals of Statistical Process Control
Quality Certification
Optimizing and controlling process through statistical process control
QUALITY MANAGEMENT (bpb 44002)
PROJECT QUALITY MANAGEMENT Teknik Elektro FT UNDIP
Quality Tools - 9/18/2018 Quality Tools -
Quality Improvement: Problem Solving
Seven Quality Tools The Seven Tools
Quality Tools - 2/19/2019 Quality Tools -
Run Charts Slide 1 of 3 Run Charts Defined
Steps in Using the and R Chart
Seven Quality Tools The Seven Tools
Tools For Quality Assessment
Scatter Diagrams Slide 1 of 4
Presentation transcript:

TOTAL QUALITY MANAGEMENT (Continuous Quality Improvement)

Who is customer? What Level of Quality do they need? Are they purchasing to Some Quality Specification? Any Safety Considerations? Future Litigation? Ethical Issues?

QUALITY CONTROL Inspection  Destructive  Non-destructive  Sampling Process Control  Monitoring Process (relates to inspection)  Feedback Control  Statistical Process Control (knowing when the process is out of control) Correction  Knowing what to correct when process is out of control

Tools for Quality Control Check Sheets Pareto Charts Why-Why Diagrams Cause & Effect Diagrams Flowcharts Histograms Scatter Diagram Control Charts

Problem Solving Steps Plan Do Study Act Link these Two in Quality Circle

CHECK SHEETS Used to keep a record of the number and type of discontinuities over a specified period of time or within a certain batch of product. PARETO CHART A graphical representation ranking discontinuities from the most to least significant. Used to help brainstorm what discontinuities, if worked upon first, would be the most likely to produce the greatest improvement in quality. Class Example Our manufacturing procedure is composed of several steps. Several of these procedures have lead to discontinuities noticed upon inspection. The steps causing defectives are as follows:  Caulking 198 defectives  Fitting 25 defectives  Connections103 defectives  Torque 18 defectives  Gapping 72 defective A Pareto Diagram will be developed.

WHY-WHY DIAGRAMS A systematic representation of causes of why some occurrence happens. Used to guide brainstorming sessions.

FLOW CHARTS Flow charts are graphical representations of the steps involved in a process. Constructing a flow chart helps give a better understanding of the systems involved.

CAUSE AND EFFECT DIAGRAMS (Fishbone Diagram) Used in brainstorming session to help identify the causes of quality losses. This diagram is particularly useful after the flow chart and the Pareto diagrams have been developed. Step 1:Decide on the quality characteristic {e.g. Reduction of wobble during machine rotation} Step 2:Set up the fish bone backbone Step 3:Identify main factors causing effect {e.g. Workers, Materials, Inspection, Tools} Step 4: Add Cause to each branch

Benefits of Cause and Effect Diagram  Making diagram is educational in itself  Outline relationship  Note what samples need to be taken  Guide for discussion  Causes are actively sought and results written on diagram  Appropriate data collected - no time wasted  Shows level of technology

Problem Solving Steps Plan Do Study Act Link these Two in Quality Circle

CONTROL CHARTS  Used to test if the process is in control  Used to see if significant changes have occurred in the process over time “Indiscreet” or “Continuous Data Chart” or “X- R Chart” Measurement at time intervals Measurements compared - control over time. Examples: Length (mm) Volume (cc) Weight (gm) Power (kwh) Time (sec) Pressure (psi) Voltage (v) “Discrete Data Charts” or “pn-p charts” Inspection on lot or batch Note # good/defective # of parts inspected in the lot = n Fraction of defective in lot = p Number of defectives = pn

- R CHART CONSTRUCTION In the manufacturing process for this example parts are being machined with a nominal diameter of 13 mm. Samples are taken at the following times of day: 6:00, 10:00, 14:00, 18:00 and 22:00, for 25 consecutive days. The diameter measurements from these samples are presented on the table in the next slide. Class Example

Step 8:Plot Chart

P CONTROL CHART CONSTRUCTION An inspector at the end of the manufacturing line for the production of car wheel rims, at the end of each shift, inspects the lot of wheel rims made during that shift. On good days when the welder is running properly, over 400 wheels are made per batch. On poor days, as low as 50 to 60 wheels are made per batch. The inspector marks on his/her “check sheet” for each batch the total number of wheels inspected and the number of defects returned for rework in each lot. Class Example

Step 6:Draw P Control Chart

PN CONTROL CHART CONSTRUCTION Class Example On an assembly line of windshield wiper motors, the inspector selects randomly 100 motors per hour to examine. The inspector notes on the “check sheet” the number of defective motors in each 100 selected.

ISO 9000