The Matera Laser Ranging Observatory FSP-06, Frascati, Italy, 21-23 March 2006 Giuseppe Bianco Centro di Geodesia Spaziale, ASI – Matera, Italy.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

2 Casa 15m Perspectiva Lateral Izquierda.
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
SI UNITS & METRIC CONVERSIONS
1
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
ALGEBRA Number Walls
Unit 3 - Investing: Making Money Work for You.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 15 second questions Calculation Addition.
Multi Beamlett Extraction Experiments and Sector Magnet Field Investigation.
Identifying money correctly 1
The 5S numbers game..
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
What is the relationship between the planets and the sun?
1 Heating and Cooling of Structure Observations by Thermo Imaging Camera during the Cardington Fire Test, January 16, 2003 Pašek J., Svoboda J., Wald.
PP Test Review Sections 6-1 to 6-6
Mental Math Math Team Skills Test 20-Question Sample.
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Squares and Square Root WALK. Solve each problem REVIEW:
We are learning how to read the 24 hour clock
1..
Various SLR Observation Errors Detected in Daily Multi-Satellite Analysis Toshimichi Otsubo Kashima Space Research Center National Institute of Information.
Area under curves Consider the curve y = f(x) for x  [a, b] The actual area under the curve is units 2 The approximate area is the sum of areas.
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
Centre-of-mass correction issues: Toward mm-ranging accuracy Toshimichi OTSUBO National Institute of Information and Communications Technology.
25 seconds left…...
How to round a number with two decimal places to the nearest tenth
: 3 00.
5 minutes.
Metric Conversions: Ladder Method
Precision and Accuracy
Week 1.
We will resume in: 25 Minutes.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Select a time to count down from the clock above
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
High Repetition Rate Systems (1) Number of kHz Systems is now increasing exponentially:  Graz2 kHz400 µJ5 years of continuous kHz operation completed;
Presentation transcript:

The Matera Laser Ranging Observatory FSP-06, Frascati, Italy, March 2006 Giuseppe Bianco Centro di Geodesia Spaziale, ASI – Matera, Italy

SLR concept

LAGEOS

Starlette Stella LAGEOS-I LAGEOS-II Etalon-I & -II GFZ-1 Ajisai Inclination Perigee (km) diameter (cm) mass (kg) 98.6° ° ° 5, ° 5, ° 1, ° ° 19, Geodetic satellites

Lunar targets

Lunar reflectors

Centro di Geodesia Spaziale Giuseppe Colombo Matera, Italy

u Day & night, 1- and 2-color ranging capability to satellites from 400 km orbit to the Moon u Single-shot RMS jitter 5 mm on LAGEOS ( 1 mm NP) 5 mm on Starlette, ERS ( 1 mm NP) 15 mm on Etalon, Glonass ( 3 mm NP) 15 mm on Moon ( 10 mm NP) MLRO specifications u Astronomical quality telescope, 1 pointing accuracy, 1.5 m aperture

TX-RX table

LAGEOS II observations from MLRO Residuals (cm) Number of observations Lageos 2 pass on 98/10/15 pass length = 46 min. number of obs. = return rate = 80% rms= 5.08 mm skewness = 0.17 kurtosis = Lageos 2 pass on 98/10/15 pass length = 46 min. number of obs. = return rate = 80% rms= 5.08 mm skewness = 0.17 kurtosis = -0.13

Ajisai residual analysis

LAGEOS I residual analysis

Time (sec) from the pass start Lageos 2 pass on 29/05/2000 number of obs. = mean = 0.00 mm rms= 5.67 mm Shot-by-shot residuals (mm) LAGEOS II MLRO observations

LAGEOS II residual analysis (October 15, 1998)

LAGEOS II residual analysis (May 29, 2000)

Observed LAGEOS-2 down-spinning rate (exponential fit) Year Rotation Period (s) post-fit RMS 88.5 ms Down-spinning rate: factor of 2 every 1.5 years factor of 10 every 4.9 years Period (s) = 11.1 * e (Year )/ 2.1

MLRO lunar observations

MLRO MM C-MENDES MLRO MM C-MENDES Two color SLR

Differences wrt MLRO DD C-MENDES MM MENDES

Quantum telecommunications

Conclusions u Two-color capable (355 & 532 nm), Moon capable u Ready for other experiments (transponders, quantum, active optics) u Severe funding problems u Millimeter-level single shot precision