Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID1 Cryogenic Amplifiers for the Band 7 and Band 9 Cartridges Juan Daniel.

Slides:



Advertisements
Similar presentations
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Advertisements

The ALMA Front End John C. Webber National Radio Astronomy Observatory, Charlottesville VA 22903, USA.
Chapter 3 Project Initiation
Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)1 First Stage Cryogenic IF Amplifier Carmen Diez.
Distributed Voltage Controlled Oscillator Team Members: Dane StiversTodd Beyer Tim MacShaneMonica Studnicki Advisor: Dr. Prasad N. Shastry Funded By: Electrical.
Development of the IF2 Chain for the FPU of the HIFI Instrument Alexander Megej July 1 st, 2003, Groningen.
IF1 CDR 9/12/031 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) IF-1 high (4-8 GHz) design and DM results Carmen Diez, Isaac López-Fernández,
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
CDL Band 2 Design Study Kickoff Meeting Goals of this meeting – Finish in one hour – Everyone upon leaving knows their role and responsibility and how.
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
AAAC Meeting: October 12, 2005 ALMA Update: October 2004-October 2005 Bob Dickman ALMA Staff Associate Division of Astronomical Sciences.
Astronomical Telescopes and Instrumentation (SPIE) 8/28/021 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) Wide band, ultra low noise.
March ‘08G. Ruggiero Totem Collaboration Meeting Roman Pot Detectors 1 st RP Detector Assembly RP vs DCS and DB CERN Open day.
TNT SHOWCASE AUTOMOTIVE MANUFACTURER A multinational, American automotive manufacturer operating twelve manufacturing plants that service the European.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
Observatorio Astronómico Nacional Instituto Geográfico Nacional ALMA CAY 05/03/2003IGN (Madrid)1 Development of IF Amplifiers for ALMA Isaac López-Fernández.
Eloy de Lera Acedo 2 nd SKADS Workshop October 2007 DS4T4 Differential Dual Polarized Antenna Array Design - Eloy de Lera Acedo - Research Associate.
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
Situation with industry
Proposed Versatile 1.2 to 14 GHz Radio Telescope Receiver S. Weinreb, JPL/Caltech, Draft July 5, 2005 Contents 1.Introduction and intended applications.
Fluctuations and Noise (SPIE) 5/28/041 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) Experimental results of gain fluctuations and.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
5th Engineering Forum Workshop (Cagliari 13/05/ 11)1 Centro Astronómico de Yebes, Obs. Astronómico Nacional, IGN (Spain) Gain Fluctuations of Cryogenic.
Status Report #2 Food DIP Team 11 Device that detects irregularities in perishable goods before distribution Brandy Alger Travis Ayers Josue Figueroa Joaquin.
ABSTRACT The purpose of this project is to develop an amplifier for Teradyne Corporation. The amplifier will take the input signal and amplify it without.
Construction of a Heterodyne Receiver for Band 1 of ALMA N. Reyes 1, P. Zorzi 1, F. P. Mena 1, C.Granet 2, E. Michael 1, C. Jarufe, F. Colleoni, Francisco.
Groningen, 1-2 February 2001 FPU Preliminary Design Review1 First Stage Cryogenic IF Amplifier Centro Astronómico de Yebes Observatorio Astronómico Nacional.
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
Leiden, 3 June 2002Consortium Meeting1 First Stage Cryogenic Amplifier IF1 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Status Report #3 Food DIP Team 11 Device that detects irregularities in perishable goods before distribution Brandy Alger Travis Ayers Josue Figueroa Joaquin.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
Abstract The purpose of this project is to design a high-performance FPGA-controlled amplifier for Teradyne Corporation. This will constitute Phase IV.
Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 24/02/2003SRON (Groningen)1 Development of IF Amplifiers for ALMA Isaac López-Fernández.
High Speed Digitizers EVLA Advisory Committee Meeting March 19-20, 2009 Steven Durand & Mike Revnell.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
Dr Danielle Kettle1 LNA progress 4 th SKADS Workshop, Lisbon, 2-3 October 2008 LNA progress.
SchedulingProducingControllingSchedulingProducingControlling.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
CSP 25th November 2010 Technical agreement number 3: overview
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
RFI measurements with Yebes VGOS broad-band receiver
Common Learning Blocks
Terry Cotter LO/IF Group Leader
Atacama Large Millimeter Array
The 40m YEBES RT and the HSA
First Stage Cryogenic IF Amplifier
First Stage Cryogenic IF Amplifier
Performance vs input power Performance vs frecuency
HL-LHC upgrade at IPHC news
PANDA Cryostat and Yoke
Low-Noise Wide-Band Cooled amplifiers with InP Transistors
Progress on cryostat design and production
Presentation transcript:

Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID1 Cryogenic Amplifiers for the Band 7 and Band 9 Cartridges Juan Daniel Gallego

Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID2 Work Package(s) Description DEVELOPMENT: design and development of cryogenic amplifiers for the Band 7 and Band 9 Cartridges. including laboratory testing, manufacture of prototypes, and support of design reviews. Deliverables: (10) Band 7 and (2) Band 9 cryogenic amplifier prototype units PRE-PRODUCTION: fabrication, assembly, testing, delivery and support of (32) Band 7 and (16) Band 9 cryogenic amplifier pre-production units (8 antennas). BAND 7 IF: 4-8 GHz BAND 9 IF: 4-12 GHz

Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID3 Goals Provide Cryogenic IF amplifiers to ESO for the two European Cartridges. Band 7 (IRAM) and Band 9 (NOVA) Obtain State of the Art performance (InP HEMT devices): –Wide instantaneous band (4-8 and 4-12 GHz) –Low noise –Limited power dissipation –Low gain fluctuations –High reliability Produce and Test the amplifiers within schedule

Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID4 Problems InP HEMTs procurement  ESO responsibility. Needed soon (June 2004!) –Founding for development in Europe (ETH, Franhofer) needed. –HRL? –TRW? Amplifier Specifications under discussion –Highly dependant on InP HEMTs Complexity of contracts similar to space projects Development done with OAN-IGN founds (contract for development and pre-production in preparation)

Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID5 Problems: COST Initially (agreement): 1382 Keuro for both work packages. Present Draft Contract: 340 Keuro (covers development and pre-production units for 8 antennas) Estimated cost for production units: 4 Keuro/unit Total cost (pre-production + production):  6  4=1684 Keuro Extra cost: 22% Estimation assumes: –No spares –No changes in receiver configuration (number of amplifiers)

Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID6 Present Status Band 7 amplifiers (4-8 GHz): –Design done (TRW+ETH InP HEMTs) –10 prototype units built and delivered to IRAM, NOVA –No payment received yet. Band 9 amplifiers (4-12 GHz) –Design not finished yet –2 prototype units to be delivered (May 2004?)

Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID7 Present Status Lab equipment: –Dedicated Noise Figure Meter received –Dedicated Cryostat in construction (to be received in March 2004) –Dedicated Vector Network Analyzer to be bought in 2004 –Wire bonding machine to be bought in 2004 Industrial production –TTI (Santander), (other companies already contacted) –Contract to be signed with IRAM for production of 56 amplifiers –Experience with this contract could be used for ALMA

Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID8 YCA 2000 (4-8 GHz)

Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID9 YCA 2000 (4-8 GHz)

Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID10 Results expected by end 2004 Contract for Development and Pre-production signed with ESO Specifications for band 7 and band 9 clarified InP devices for contract (300) acquired by ESO and delivered to OAN Band 9 amplifiers (4-12 GHz) design done, 2 prototypes delivered Measurement Cryostat finished and tested Dedicated Vector Network Analyzer acquired Dedicated Wire Bonding Machine acquired