Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Proposed Button Design for a Series of High Power Button Tests Arash Zarrebini-Esfahani 22 nd August 2007.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
201-MHz NCRF Cavity Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at Fermilab March 16, 2006.
RF Cavity / Coupling Coil Module
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, MHz Cavity Fabrication Plan.
MICE RFCC Module and 201 MHz Cavity Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 15, 2009.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
IMP Visit July 10, 2013 Matt Hoff LBNL July 18, 2013.
1.3GHz Input Coupler for ILC
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
RF R&D (Issues) for Muon Ionization Cooling Channels
Completion of the MICE-US construction project
Overview of the RFCC Module and 201-MHz Cavity Design
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005

RF Module Fabrication Steve Virostek - LBNLPage 2 Progress Since Last Year Leak check of all e-beam welds was performed Cooling tubes were TIG brazed to cavity exterior A final mechanical buff of the interior was completed Cavity interior surfaces were electropolished RF couplers were fabricated and conditioned First 201 MHz beryllium window delivered to LBNL Cavity manual tuner and support stand were fabricated Final assembly and leak check performed at J-Lab Cavity was shipped to the MTA, assembled and leak checked

RF Module Fabrication Steve Virostek - LBNLPage 3 RF Cavity Overview Two 6 mm thick copper shells are e-beam welded together at equator to form cavity Cavity half-shells are formed from annealed, flat plate using a spinning technique Separate copper nose piece rings are e-beam welded to cavity aperture RF and vacuum ports are formed by pulling a die through a hole cut across the equator weld Externally brazed tubes provide cooling Two thin, pre-curved beryllium windows are to be mounted on cavity aperature Cavity inside surfaces are finished by mechanically buffing and electropolishing

RF Module Fabrication Steve Virostek - LBNLPage 4 Shell Spinning & Measurement A 6.35 mm OFHC copper sheet is spun against a pre-machined form to generate half-shells Shell outer edges are trimmed as specified after spinning Half-shell profiles at various cross-sections are measured using a portable CMM Half-shell is placed on a copper sheet and frequency is determined using low level RF Comparisons are made between RF analysis of measured shape and frequency check

RF Module Fabrication Steve Virostek - LBNLPage 5 Cavity Stiffener Ring Hard copper stiffener ring is e-beam welded on inside and outside edges to the outside of the cavity shell Rings initially provide for safe handling the half-shells Rings are turned on a lathe after being welded on to provide an accurate reference for subsequent operations Rings provide an interface for tuner mechanisms and for mounting the finished cavity to the support structure Load tests on sample welds indicate the e-beam weld strength is much higher than required for tuning

RF Module Fabrication Steve Virostek - LBNLPage 6 Nose Hole & Equator Joint Machining Nose hole is cut with a numerically controlled horizontal mill using the stiffener ring for reference Special aluminum fixturing was designed to hold the half shells Hole detail includes a 1 mm lip to register the nose piece ring Shell lip is cut using a numerically controlled horizontal mill with a right angle head adaptor A close fitting aluminum disc supported the lip during machining Lip includes a chamfered step that mates with the opposing shell to prevent slipping prior to and during e-beam welding

RF Module Fabrication Steve Virostek - LBNLPage 7 Shell Cleaning and Buffing Shells are cleaned prior to welding operations by rotating them through a chemical bath Some scratches and dents created on the inside surfaces of the shells during spinning Cavity surfaces smoothed out mechanically with an abrasive buffing wheel

RF Module Fabrication Steve Virostek - LBNLPage 8 Cavity Equator Weld Cavity and fixture system is mounted and assembled on a plate and placed on the welder sliding table External structural weld is near full penetration and is achieved in three offset passes A final cosmetic/vacuum weld is performed on the inside of the joint with the cavity mounted on a horizontal rotary table Inside equator weld is smoothed using an abrasive wheel

RF Module Fabrication Steve Virostek - LBNLPage 9 Nose Fabrication & Welding Nose piece ring is OFHC copper with a stainless steel support ring brazed to the roughed out copper ring SS ring bolt circles allow attaching Be window and cover plate After brazing, copper is machined to final shape Cavity is placed in welder chamber horizontally on a rotary table with fixturing holding nose piece ring Similar to the equator weld, nose piece weld consists of 3 offset external welds and an inside cosmetic/vacuum pass Inside nose weld are smoothed and weld blow through is removed using an abrasive wheel

RF Module Fabrication Steve Virostek - LBNLPage 10 Cavity Port Forming & Welding Local annealing only (to preserve cavity overall strength is) achieved by repeatedly passing a diffuse e-beam around port Port pulling tool is used in a horizontal orientation, and a weld prep is machined into the port lip using an NC mill Cavity is held vertically in welder chamber on a fixture that facilitates 90 degree rotations Structural and vacuum weld is made with a single inside pass Prototype cavity uses a stainless flange with a TIG welded copper insert (flange must hold vacuum) MICE cavity will use an all copper flange for RF sealing only

RF Module Fabrication Steve Virostek - LBNLPage 11 Vacuum Leak Check After ports are attached, a vacuum leak check of all welds (equator, nose pieces [2], stiffener rings [2], ports [4], port flange inserts [4]) is performed Conflat flanges on ports allow easy blank-off and leak detector attachment Nose openings are covered by a plate with an O-ring An internal support is required to prevent the external atmospheric pressure from collapsing cavity

RF Module Fabrication Steve Virostek - LBNLPage 12 Cooling Tube Weld Cavity cooling is achieved by TIG brazing a 9.5 mm diameter copper tube to the exterior in an alternating skip pattern Four turns (1 circuit) per cavity side step inward near to the stiffener ring OD and then step back out to the equator Cooling tube spacing is approximately 10 cm Fittings are brazed to the tube ends and tacked to the cavity Nominal flow rate is expected to be 3 gpm per circuit

RF Module Fabrication Steve Virostek - LBNLPage 13 Final Interior Buffing Final interior buffing of cavity is performed to ensure the surfaces are ready for electropolishing Less buffing needed near equator where fields are lower An automated process of buffing was developed using a rotary buffing wheel and a cavity rotation fixture Some local hand work required to clean up some areas A series of pads with graduated coarseness was used Goal was scratch depth shallow enough for EP removal

RF Module Fabrication Steve Virostek - LBNLPage 14 Interior Surface Electropolish After buffing, cavity underwent a chemical cleaning process Test bars with various degrees of buffing were run through an electropolish process Cavity was rotated with a U-shaped electrode fixed in place Initial polish failed due to depletion of the solution, and rebuffing was required 2nd EP successfully removed scratches in high field regions Final process is a high pressure water rinse of cavity surface

RF Module Fabrication Steve Virostek - LBNLPage 15 Cavity RF Couplers Coupling loops were fabricated using standard copper co-ax Most coupler parts were joined by torch brazing – vacuum leaks were found in two of the outer conductor joints Coupling loop contains an integrated cooling tube The coupler was designed to mate with an SNS style RF window manufactured by Toshiba High power conditioning performed at SNS (ORNL) The MICE coupler will require a bellows connection interface with the outer vacuum vessel ports

RF Module Fabrication Steve Virostek - LBNLPage MHz Beryllium Windows Each cavity will require a pair of 0.38 mm thick pre- curved beryllium windows with TiN coating Double-curved shape prevents buckling caused by thermal expansion due to RF heating Thermally induced deflections are predictable A die is applied at high temperature to form window Copper frames are brazed to beryllium windows in a subsequent process

RF Module Fabrication Steve Virostek - LBNLPage 17 Shipment to the MTA at FNAL System assembly included: tuner plates, port blank-offs, diagnostic spool, window cover plates, gate valve and window pumpout tubes Final leak check conducted prior to shipping Cavity was back-filled with nitrogen in its assembled state and packaged in a custom made crate for shipping to the MTA

RF Module Fabrication Steve Virostek - LBNLPage 18 Final Assembly at the MTA Cavity assembly was mounted on the support and couplers were installed in a portable clean room Dummy copper windows (flat) are used initially Couplers were set and frequency was measured Bakeout system hardware was installed System is now leak tight and ready for bake