Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.

Slides:



Advertisements
Similar presentations
Scheduling.
Advertisements

© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Production Planning & Execution (PP)
Consumption-based Planning
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Master Production Scheduling (MPS) – Basic Techniques pom
The Production Process
presented by Zümbül Bulut
Scheduling INTRODUCTION. 2 Definitions for Scheduling Some of the definitions presented in various literature can be given as follows; Some of the definitions.
Perencanaan Kapasitas Produksi
The Production Process
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Production Planning Processes Theories & Concepts
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Production Planning and Control Introduction
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Business Process Overview IE 450 Enterprise Perspective of Manufacturing System.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
Ardavan Asef-Vaziri Systems and Operations Management
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
Session 12 System Transactions
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
Production Activity Control
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
SAP Demand Management Order Management Customer Service EIN 5346, Logistics Engineering Spring 2010.
Hierarchy of Production Decisions
Materials Planning & Control. Introduction With the development of ‘integrated materials management’ and ‘supply chain management’, material managers.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Aggregate Planning and Resource Planning Chapters 13 and 14.
CAPACITY MANAGEMENT Nyoman Pujawan.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Activity Scheduling and Control
Scheduling.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
Basics of Supply Chain Management
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
Material Requirements Planning (MRP)
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
Material Requirements Planning
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Capacity Planning and Utilization
 Andersen Consulting IM01 - Organizational Structure & Master Data in IM November, 2000.
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Production Planning and control – ME 1009 Unit 1 Introduction.
Enterprise Resource Planning, 1st Edition by Mary Sumner
AXUG Partner Showcase – Introducing Preactor
Manufacturing Planning and Control
FDFPLSCP4A Manage and schedule production
Facility Inventory Old Facilities Modern Facilities Classroom Size
Introduction to Materials Management
The Production Process
Chapter 7 Capacity Planning and Management
Sales Order Process.
Manufacturing Planning and Control
Deployment & Available-to-promise (ATP) in SCM Theories & Concepts
Capacity Planning.
Introduction to Scheduling Chapter 1
Enterprise Resource Planning, 1st Edition by Mary Sumner
Chapter 14 Dependent Demand
Set Up For Success : Reviewing Manufacturing Best Practices
Manufacturing Planning and Control
Presentation transcript:

Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING

2 Scheduling as a Process is not “stand alone” Back to the operating MPC System... Back to the operating MPC System... Prep. for Prod. Schedule MPS Rq Sch Rp Sch S/o Schedules Final Assy Sch Job Shop Sch FRONT END ENGINE BACK END Inorder to perform the scheduling activity at any end of the MPC system, the schedular needs to be in contact with people from different areas of function.

3 Functional groups involved in front end MPC activities : Functional groups involved in front end MPC activities : Scheduling as a Process is not “stand alone”

4 Role of Master Schedular with respect to MPC front end activities : Role of Master Schedular with respect to MPC front end activities : Determination of all the resource requirements for the subject potential project under different alternatives. Determination of all the resource requirements for the subject potential project under different alternatives. REQUIREMENTS FOR THIS ACTIVITY Data Tools Estimated utilization of required shops Estimated delivery dates and quantities Master Scheduling software having the capability of Roughcut Capacity Planning. (Bills of Work Breakdown ) Contract Specialist Manufacturing Engineer Shop Responsibles Capacity planner Alternative Roughcut Capacity Plans Scheduling as a Process is not “stand alone”

5 Role of Master Schedular with respect to MPC front end activities : Role of Master Schedular with respect to MPC front end activities : Associating budgeted hours to each alternative. Associating budgeted hours to each alternative. PRICE = COST + PROFIT Determined by Customer Calculated by Vendor ( Reflects real life at vendor’s facility) If PRICE > COST No Problem! Budgeted hours will be in balance with associated COST. If PRICE < COST Problem! COST figure will be reduced to a “Should be COST”. Where PRICE ≥ “Should be COST” “Should be COST” becomes PERFORMANCE TARGET for direct hours (new budgeted hrs). HENCE, BUDGETED HOURS EFFECT THE ALLOCATION OF RESOURCES. Master Schedular and Contract Specialist are PARTNERS in this work. Scheduling as a Process is not “stand alone”

6 Role of Master Schedular with respect to MPC front end activities : Role of Master Schedular with respect to MPC front end activities : Schedule for “Production Preparation”. Schedule for “Production Preparation”. Master schedular (acts as team Leader) shop foremenmanufacturing engineerprocurement specialist contract specialist TEAM Determination of preparation activities Determination of time requirements Allocation of resources Schedule for “Production Preparation” Scheduling as a Process is not “stand alone”

7 Role of Master Schedular with respect to MPC front end activities : Role of Master Schedular with respect to MPC front end activities : Preparation of Master Schedule (the last step in front end activities). Preparation of Master Schedule (the last step in front end activities). Roughcut Capacity Plan A. (per company practice) Roughcut Capacity Plan B. (per budgeted hours and associated costs) TOP MNGMNT DECISION Negotiations & Contract Award Project included in SALES PLAN OK Resorce investment & aggregate production rate decisions for the period. MASTER PRODUCTION SCHEDULE for FARSCAPE Project. (volume) (constraints) Scheduling as a Process is not “stand alone”

8 Functional influence to the Engine Section of MPC System with respect to preparation of Rq and Rp Schedules CORE OF THE MPC SYSTEM Scheduling as a Process is not “stand alone”

9 Functional influence to the Engine Section of MPC System with respect to preparation of Rq and Rp Schedules Majority of daily activities of MRP Specialists force the MRP Module to recalculate the Rq & Rp schedules ; Quantity change on a planned or released order Date change and firming of a planned or released order, Splitting a released order, Cancelling a shop order, Performing a total or partial scrap on a shop order, Order bill maintenance of a specific planned or released order, Changing ordering codes and parameters of a specific part number. Creating independent requirements (for manual release of an unplanned order), Credit transfer of materials from one project to another, Stock receipt, etc. Scheduling as a Process is not “stand alone”

10 Functional influence to the Engine Section of MPC System with respect to preparation of Rq and Rp Schedules Procurement Specialists perform the similar activities with respect to the “buy” part numbers (hence, purchase orders) except credit transfers, creating independent requirements, and stock receipt. Master Schedulars deal with end “item part numbers”. Their most important interference with the engine section is the modification of MPS and its transfer from MPS module to MRP module. Rest of their interference is limited to the maintenance of codes and parameters for the manipulation of end items. Capacity Planner’s interference with the operation of MRP side is an indirect one in nature. Activity of a capacity planner may result in management decisions which yield to structural changes and/or effect to efficiency of a specific operation. Result of such a situation will automatically influence the available schedules. Scheduling as a Process is not “stand alone”

11 Functionals who effect the Work Center Schedules within the Back End Section of MPC System EXECUTION Scheduling as a Process is not “stand alone”

12 Functionals who effect the Work Center Schedules within the Back End Section of MPC System Primary responsibility of Manufacturing Control Specialist is enabling the flow of parts to their completion within the assigned period of time. To this end basic activities are; Providing material for the released shop orders, determining and following up of shortage cases, Loading jobs to work centers per applicable sequencing rules, Providing for transport of shop orders (and materials) to next work center in routing, Forwarding scrap cases to MRP planner, Assigning manual priorities to shop orders if the acceptable conditions occur, Studying the flow efficiency realized at shop floor and taking necessary precautions (overtime or shift requests). Scheduling as a Process is not “stand alone”

13 Functionals who effect the Work Center Schedules within the Back End Section of MPC System It is not easy to provide an efficient flow all the time... It is not easy to provide an efficient flow all the time... Possible Problems Machine or Equipment Breakdowns Unavailabity of Procured Materials Lost Shop Orders Changes in Costomer Expectations Lost Parts at Shop Floor Management Decisions Workmanship Energy Failure Unjustified Requests from Assembly Shops Version Differences in tech documents Absenteesim Scheduling as a Process is not “stand alone”

14 Functionals who effect the Work Center Schedules within the Back End Section of MPC System A real life Example... A real life Example... Scheduling as a Process is not “stand alone”

15 Basic Inputs to a Scheduling Process

16 System Modules Related with Scheduling Process

17 Primary Objectives (Goals) of Scheduling What is “Effective Scheduling”? Operation 1 Station 1 Operation 2 Station 2 Operation n Station n Job completions should not be late. (about “due dates”) Production resources should not remain idle. (about “W/c utilization”) Time spent in the system should be minimum. (about Flow [throughput] time) These objectives apply to all scheduling problems. Issue date of a shop order (job)

18 Conflicts of goals with each other What is “Effective Scheduling”? Possibility of meeting “due date” increases, if more capacity is provided. More capacity creates a condition for reducing the “flow times” resulting in less “work center utilization”. When extra jobs are inserted into the system, “flow time” tends to increase resulting in more “work center utilization”.

19 Which performance measure is to be used? What is “Effective Scheduling”? Due Date Performance  “Lateness” on simple yes/no basis ? “Avarage Lateness”? “Variance of actual completion dates against scheduled completions dates”? Utilization Performance  Should it cover all work centers? Only for selected work centers? Flow Time Performance  “Average Flow Time”? “Variance in Flow Time”? “Maximum Flow Time”?

20 Summary of prerequisites for effective scheduling Summary of prerequisites for effective scheduling Knowledge of respective product structure : Knowledge of respective product structure : What is “Effective Scheduling”?

21 Summary of prerequisites for effective scheduling Summary of prerequisites for effective scheduling Knowledge of shop structure and operation characteristics Knowledge of shop structure and operation characteristics Understanding the available shop performance measures with respect to scheduling and how they are measured. Understanding the available shop performance measures with respect to scheduling and how they are measured. Understanding other functionals’ roles and how they can effect the schedules when performing their tasks. Understanding other functionals’ roles and how they can effect the schedules when performing their tasks. Easy access to data which is required for scheduling activity. Easy access to data which is required for scheduling activity. Understanding the operating principles and procedures of computerized system modules that are associated with scheduling tasks. Understanding the operating principles and procedures of computerized system modules that are associated with scheduling tasks. Knowledge of scheduling techniques which are appropriate for the respective area of the company. Knowledge of scheduling techniques which are appropriate for the respective area of the company. What is “Effective Scheduling”?