NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.

Slides:



Advertisements
Similar presentations
Subaru AO in future. Outline Overview of AO systems at Mauna Kea and in the world. Ongoing plan of AOS at Subaru and Mauna Kea. What’s in future.
Advertisements

LBT AO Progress Meeting, Arcetri Walter Seifert (ZAH, LSW) The LBT AO System and LUCIFER 1.Requirements for the commissioning of LUCIFER:
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
AO Controls: Status and Issues Erik Johansson, Jimmy Johnson, Doug Morrison and Ed Wetherell NGAO PD Team Meeting #6 Thursday, March 19, 2009.
NGAO Controls Team Meeting August 29, 2008 Erik Johansson.
W. M. Keck Observatory’s Next Generation Adaptive Optics Preliminary Design & Path Forward Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
Low order wavefront sensor trade study Richard Clare NGAO meeting #4 January
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
LGS WFS Design Status & Issues Dekany, Delacroix, & Velur Caltech Optical Observatories.
NGAO Control Systems Group Status, Plans & Issues NGAO Team Meeting August 19, 2008 Erik Johansson Jimmy Johnson, Doug Morrison, Ed Wetherell.
1 Laser Guide Star Wavefront Sensor Mini-Review 6/15/2015Richard Dekany 12/07/2009.
A Short Introduction to Adaptive Optics Presentation for NGAO Controls Team Erik Johansson August 28, 2008.
Keck Next Generation Adaptive Optics Team Meeting 6 1 Optical Relay and Field Rotation (WBS , ) Brian Bauman April 26, 2007.
NGAO Wavefront sensors: conceptual design report WBS V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #12) Dec. 13 th, 2007.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
Don Gavel: Keck NGAO meeting April 25, Some Comments on NGAO System Design and Specification Donald Gavel NGAO Team Meeting 6 April 25, 2007.
LO WFS Summit 6/19/2015Richard Dekany A Joint Meeting of the NGAO, IRIS, and K1 LO WFS Teams 12/15/2009.
AO opto-mechanical design architectures Cost Impact Don Gavel NGAO Team Meeting #5 February 5, 2009.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
2-Tier Layout (RK 11/20/07). 1-Tier Layout (RK 11/26/07)
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
NGAO Instrumentation Cost Drivers and Cost Savings September 2008 Sean Adkins.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Laser Architecture Meeting Oct 1 st, 2007.
NGAO NGS WFS design review Caltech Optical Observatories 31 st March 2010.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/3/07.
Real Time Controller Functional Requirements Don Gavel & Marc Reinig UCO Lick, laboratory for Adaptive Optics. Keck NGAO Team Meeting December 13, 2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
PSWG March Adaptive Optics Systems Engineering on GMT Peter McGregor.
Agenda (Fri., June 7) 8:00AO UI Demonstration 9:00Introductions to AO team 9:05AOWG Chair Selection 9:15Review Agenda (make changes?) 9:20Review Planned.
Don Gavel: Keck NGAO meeting April 25, LAO Activities Relevant To Keck NGAO Donald Gavel NGAO Team Meeting 6 April 26, 2007.
NGAO operations thoughts D. Le Mignant, E. Johansson, C. Neyman.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Design Meeting (Team meeting #10) Sept 17 th, 2007.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
NGAO Instrumentation WBS Replan By Sean Adkins April 25, 2007.
Keck Laser Guide Star Adaptive Optics System: 1 st & 2 nd Milestones AOWG Telecon Oct. 17, 2003 A. Bouchez, J. Chin, A. Contos, S. Hartman, E. Johansson,
W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team:
P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002 Keck AO Overview to support summit tour.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
WMKO Next Generation Adaptive Optics: AO System Design Impact of Cost Savings Ideas Don Gavel December 19, 2008.
NGAO NGS WFS design review Caltech Optical Observatories 1 st April NGAO WFS design, Caltech Optical Observatories.
Throughput and Emissivity for Alternatives to the Baseline AO Layout Don Gavel NGAO Telecon January 28, 2009.
WBS Non-RTC Controls Erik Johansson, Jason Chin, Don Gavel, Marc Reinig Oct 31 th, 2007.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Trying to connect WBSs with people and phases Relevant questions to my work: How the re 8 -planning will affect the work in progress? Priorities to capture.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
Build to Cost Meeting: Major NGAO system cost savings ideas Don Gavel NGAO Team Meeting September 11-12, 2008.
The Gemini MCAO System (EPICS Meeting, SLAC, April 2005) 1 The Gemini MCAO System Andy Foster Observatory Sciences Ltd.
MCAO Adaptive Optics Module Mechanical Design Eric James.
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
Some Thoughts on Ground Layer Adaptive Optics & Adaptive Secondary Mirrors for Keck P. Wizinowich 9/15/14 1.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Overview Science drivers AO Infrastructure at WHT GLAS technicalities Current status of development GLAS: Ground-layer Laser Adaptive optics System.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Introduction of RAVEN Subaru Future Instrument Workshop Shin Oya (Subaru Telescope) Mitaka Adaptive Optics Lab Subaru Telescope Astronomical.
Science Priorities and Implications of Potential Cost Savings Ideas
NGAO System Design Project Plans and Schedule
Presentation transcript:

NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson

2 Controls Team Erik Johansson (Lead) Jimmy Johnson (Technologist) Ed Wetherell (Electronics) Doug Morrison (Software)

3 NGAO Block Diagram

4 Narrow field (left) and wide field (right) LGS asterisms.

5 AO system optical layout perspective view

6

7 AO system optical layout (Zemax)

8 The image rotator and low order “wide” field relay.

9 Laser Guide Star Wavefront Sensor and Interferometer Pickoffs.

10 Narrow Field Relay.

11 The LOWFS assembly

12 LOWFS OSM probe arm.

13 Four configurations of the LOWFS OSM arms.

14 (a)Zemax model of LOWFS probe arm. (b) Probe arm patrol field.

15 Plan view of the LGS object selection  /φ pickoff scheme

16 LGS WFS assembly enclosure

17 Laser facility optical schematic

18 Secondary mirror module and Keck I laser launch telescope.

19 A distributed controls system block diagram of the NGAO system

20 AO controls infrastructure block diagram

21 Motion Control Vibration sensor (3 DOF) Calibration source (4 DOF) Rotator (1 DOF) LGS WFS assembly (61 DOF) Dichroic changer (2 DOF) Interferometer pickoff, pointing and centering (5 DOF) Acquisition camera pickoff, focus (2 DOF) LOWFS assembly (22 DOF) NGS WFS and truth sensor (14 DOF) Visible imager (5 DOF) NIR imager (3 DOF) OSIRIS pickoff (1 DOF) Laser pointing and centering (36 DOF) Laser constellation generator (19 DOF) Other laser motion control (11 DOF)

22 Device Control Detectors –Vibration sensor –LGS WFS cameras (9) –NGS acquisition camera –LOWFS tip-tilt sensors (2) –LOWFS TWFS camera –LOWFS TTFA camera –NGS WFS camera –NGS TWFS camera Mirrors –Woofer DM/TT –Tweeter DM/TT –LOWFS DM/TT (3) –d-IFS DM/TT (6) –UTT mirror (1 or 9) RTC control Environmental control –Power –Temperature –Humidity –Particulates –Instrument glycol or other cooling Laser system control –Diagnostics cameras –Power and environmental control

23 AO systems control hierarchy block diagram

24 Motion control software architecture block diagram

25 Generic device control paradigm block diagram

26 Laser system controls hierarchy block diagram

27 Laser motion control software architecture block diagram

28 Acquisition, guiding and pointing control software architecture block diagram

29 Data server architecture block diagram

30 Science operations tools block diagram

31 Controls WBS Items Systems Engineering –SW Architecture (EJ, JJ, DM) –Controls Systems Architecture (EJ, EW) AO System Design (EW) AO Controls (EJ, EW, DM) Laser (EJ, EW, DM) MCS (EJ, JJ, DLM)

32 Controls Assignments EJ – Overall Lead, Architecture, AO Sequencer JJ – Technologist, Architecture EW – Electronics, Motion Control HW DM – Software, Motion Control SW, AO Sequencer, Device Control DM – Work started 7/1/08 (What’s your status?) JJ – Work started 7/1/08 EW – Work starts 12/08