© 2007 Pearson Education Process Strategy Chapter 4.

Slides:



Advertisements
Similar presentations
3 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Strategy 3.
Advertisements

Process Choice and Layout Decisions in Manufacturing and Services Chapter 3.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
3 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Strategy 3 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Operations Management Process Strategy Chapter 7
Process Strategy Chapter 4
Competitive Priorities Cost1. Low-cost operations Quality2. Top quality 3. Consistent quality Time4. Delivery speed 5. On-time delivery 6. Development.
Facility Layout 1. General Observations Facility Planning includes planning for: (1) the number of facilities and general facility type, (2) facility.
©2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Operations Management
S. Chopra/Operations/Strategy1 Operations Management: Introduction & Strategy Module u Introduction & Administrative u Key Principles of Course »Strategic.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Selection and Facility Layout
Process Strategy & Analysis
OPSM 301 Operations Management Class 3: Process selection Koç University Zeynep Aksin
Chapter 2 Supply Chain Strategy Copyright 2011 John Wiley & Sons, Inc.
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
Job Shop, Flow Shop, and Batch Processing. 2 Ardavan Asef-Vaziri Aug.-2013Product-Process Matrix Facility Layout : Job Shop A C B D Product 1 Output Input.
II. Operations Strategy and Process Choice
Process Selection and Capacity Planning
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall 1 Operations D30 Managing Business Process Flows: Ch Processes and Strategy Module.
Operations Management Business Processes Chapter 3 - Hanfield
5.1 Production Methods IBBM.
Designing Goods and Services and Process Selection
MBA 8452 Systems and Operations Management MBA 8452 Systems and Operations Management Product Design & Process Selection —Service.
Chapter 10 – Facility Layout
Process Choice and Layout Decisions in Manufacturing and Services
McGraw-Hill/Irwin  The McGraw-Hill Companies, Inc. 2007, All Rights Reserved PROCESS SELECTION Chapter 4.
© 2007 Pearson Education Process Strategy Chapter 4.
Chapter 6 Production Processes.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 7: Process Strategy.
ALL MCQS
This lecture will cover the following topic: Major Process Design Decisions Process Structure Process Structure in Services Process Structure in Manufacturing.
Process Selection Chapter 3, Part 2. Intermittent Operations Intermittent operations: processes used to produce a variety of products with different processing.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
Ch. 20: Operation systems Learning Objectives Distinguish among various types of production and manufacturing processes. Describe product innovation.
McGraw-Hill/Irwin.
Process Selection Chapter 3, Part 2.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
CHAPTER 3 PROCESS MANAGEMENT. WHAT IS PROCESS MANAGEMENT ? The selection of the inputs, operations, work flows and methods that transform inputs into.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Operations Strategy Process Design Chapters 1-3 Week 2 Nov 17,
Designing Goods and Services and Process Selection Chapter 3.
1/20 Operations Management Lecture 2 – Shouldice Hospital (Chapter 2 & 3) Dr. Ursula G. Kraus.
Operational and Production Aspects of Contemporary Business Chapter Course: BUS 101 Lecturer: NNA.
Designing Goods and Services and Process Selection
UNIT – III DESIGN OF PRODUCT, SERVICE AND WORK SYSTEMS.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 14 Operations Management: Managing Vital Operations.
9-1 © 2006 The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin Value Chain Management Development of a set of functional-level strategies.
Chap 4 - Facility Layout: Manufacturing and Services.
Process Strategy This presentation covers the graphical material in Chapter 4 - Managing Process. There is very little quantitative material so the presentation.
Manufacturing and Service Processes
Building Competitive Advantage Through Functional-Level Strategies
Process Strategy Chapter Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
3 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Strategy 3 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
MANUFACTURING PROCESSES Chapter Seven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 1 Competing with Operations Instructor: David Weltman Website:
OPSM 301 Operations Management Spring 2012 Class 3:Process Types
PROCESS DESIGN.
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
PRODUCTION SYSTEMS Terminology Concept: Production: Performance:
FACILITY LAYOUT Facility layout means:
Process Design and Technology
Building Competitive advantage through functional level strategies
Capacity Planning For Products and Services
Capacity Planning For Products and Services
CHAPTER 3 PROCESS STRATEGY
Building Competitive advantage through functional level strategies
Process Strategy Chapter 4
Capacity Planning For Products and Services
Building Competitive Advantage Through Functional-Level Strategies
Presentation transcript:

© 2007 Pearson Education Process Strategy Chapter 4

© 2007 Pearson Education How Process Strategy fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process Strategy Process Analysis Process Performance and Quality Constraint Management Process Layout Lean Systems Supply Chain Strategy Location Inventory Management Forecasting Sales and Operations Planning Resource Planning Scheduling

© 2007 Pearson Education Process Strategy  Process strategy is the pattern of decisions made in managing processes so that they will achieve their competitive priorities.  A process involves the use of an organization’s resources to provide something of value.  Major process decisions include:  Process Structure  Customer Involvement  Resource Flexibility  Capital Intensity

© 2007 Pearson Education Major Process Decisions  Process Structure determines how processes are designed relative to the kinds of resources needed, how resources are partitioned between them, and their key characteristics.  Customer Involvement refers to the ways in which customers become part of the process and the extent of their participation.  Resource flexibility is the ease with which employees and equipment can handle a wide variety of products, output levels, duties, and functions.  Capital intensity is the mix of equipment and human skills in a process.

© 2007 Pearson Education Major Decisions for Effective Process Design

© 2007 Pearson Education Process Structuring The Key Trade-off  Variety vs. Volume  Flexibility vs. efficiency Variety Volume Flexibility Efficiency

© 2007 Pearson Education Process choice: A way of structuring the process by organizing resources around the process or organizing them around the products.  Job Process: A process with the flexibility needed to produce a wide variety of products in significant quantities, with considerable complexity and divergence in the steps performed.  Batch process: A process that differs from the job process with respect to volume, variety and quantity. Process Structuring in Manufacturing

© 2007 Pearson Education  Line process: A process that lies between the batch and continuous processes on the continuum; volumes are high and products are standardized, which allows resources to be organized around particular products.  Continuous flow: The extreme end of high- volume, standardized production and rigid line flows, with production not starting and stopping for long time intervals. Process Structuring in Manufacturing

© 2007 Pearson Education Product-Process Matrix for Processes (1)(2)(3)(4) Low-volumeMultiple products with low Few majorHigh volume, high products, madeto moderate volume productsstandardization, to customer higher Continuous Flow ordervolume ProcessCharacteristics (1) Complex and highly customized process, unique sequence of tasks (2) Disconnected line flows, moderately complex work (3) Connected line,, highly repetitive work (4) Continuous flows Less Complexity, Less Divergence, More Line Flows Less Customization and Higher Volume Product Design Continuous process Job process Line process Large batch process Small batch process Batch Processes

© 2007 Pearson Education Process Characteristics CharacteristicsJobLine Volume/varietyL/HH/L Process standardizationLHLH Workers’ specializationLHLH AutomationLHLH EfficiencyLHLH Throughput timeHLHL WIPHLHL SupervisionHLHL SkillsHLHL EquipmentGPSP FlexibilityHLHL

© 2007 Pearson Education Production and Inventory Strategies  Make-to-order strategy: A strategy used by manufactures that make products to customer specifications in low volume.  Assemble-to-order strategy: A strategy for producing a wide variety of products from relatively few assemblies and components after the customer orders are received.  Make-to-stock strategy: A strategy that involves holding items in stock for immediate delivery, thereby minimizing customer delivery times.  Mass production: A term sometimes used in the popular press for a line process that uses the make- to-stock strategy.

© 2007 Pearson Education Automobile Assembly Process A:Front-end body-to-chassis assembly H:Hood attachment F:Fluid filling S:Start-up and testing ASHF Midsized 6-cylinder Midsized 6-cylinder Compact 4-cylinder Compact 4-cylinder

© 2007 Pearson Education The Big Picture King Soopers Bakery

© 2007 Pearson Education Links of Competitive Priorities with Manufacturing Strategy

© 2007 Pearson Education  A good process strategy for a service process depends first and foremost on the type and amount of customer contact.  Customer contact is the extent to which the customer is present, is actively involved, and receives personal attention during the process. People What is processed Possessions Active, visible Contact intensity Passive, out of sight Personal Personal attention Impersonal Face-to-face Method of delivery Regular mail Present Physical presence Absent High Contact Dimension Low Contact Process Structures in Services

© 2007 Pearson Education Customer Contact and Process Elements  Active Contact: The customer is very much part of the creation of the service and affects the service process itself.  Passive Contact: The customer is not involved in tailoring the process to meet special needs or in how the process is performed.  Process Complexity: The number and intricacy of the steps required to perform the process.  Process Divergence: The extent to which the process is highly customized with considerable latitude as to how it is performed.

© 2007 Pearson Education Customer-Contact Matrix for Service Processes Less Customer Contact and Customization Service Package Front office Hybrid office Back office (1)(2)(3) High interaction withSome interaction withLow interaction with customers, highlycustomers, standardcustomers, standardized customized serviceservices with some optionsservices Process Characteristics (1) Flexible flows, complex work with many exceptions (2) Flexible flows with some dominant paths, moderate job complexity with some exceptions (3) Line flows, routine work easily understood by employees Less Complexity, Less Divergence, More Line Flows

© 2007 Pearson Education Process Flows  Flexible flow: The customers, materials, or information move in diverse ways, with the path of one customer or job often crisscrossing the path that the next one will take.  Line Flow: The customers, materials or information move linearly from one operation to the next, according to a fixed sequence.

© 2007 Pearson Education Service Process Structuring  Front office: A process with high customer contact where the service provider interacts directly with the internal or external customer.  Hybrid office: A process with moderate levels of customer contact and standard services with some options available.  Back office: A process with low customer contact and little service customization.

© 2007 Pearson Education Service Process Structures in the Financial Services Industry Hybrid Office Creation of quarterly performance report Data obtained electronically Report calculated using standardized process Report reviewed using standardized diagnostic systems Manager provides written analysis and recommendations in response to individual employee performance Manager meets with employee to discuss performance Back Office Production of monthly client fund balance reports Data obtained electronically Report run using standardized process Results checked for “reasonableness” using well-established policies Hard copies and electronic files forwarded to analysts Process repeated monthly with little variation Front Office Sale of financial services Research customer finances Work with customer to understand customer needs Make customized presentation to customer addressing specific customer needs Involve specialized staff offering variety of services Continuing relationship with customer, reaction to changing customer needs

© 2007 Pearson Education Customer Involvement Good or Bad?  Improved Competitive Capabilities: More customer involvement can mean better quality, faster delivery, greater flexibility, and even lower cost.  Customers can come face-to-face with the service providers, where they can ask questions, make special requests on the spot and provide additional information.  Self-service is the choice of many retailers.  However customer involvement can be disruptive and make the process less efficient.  Greater interpersonal skills are required.  Quality measurement becomes more difficult.  Emerging Technologies: Companies can now engage in an active dialogue with customers and make them partners in creating value.

© 2007 Pearson Education Resource Flexibility  Flexible workforce: A workforce whose members are capable of doing many tasks, either at their own workstations or as they move from one workstation to another.  Worker flexibility can be one of the best ways to achieve reliable customer service and alleviate capacity bottlenecks.  This comes at a cost, requiring greater skills and thus more training and education.  Flexible equipment: Low volumes mean that process designers should select flexible, general- purpose equipment.

© 2007 Pearson Education Capital Intensity Capital Intensity is the mix of equipment and human skills in the process; the greater the relative cost of equipment, the greater is the capital intensity.  Automation is a system, process, or piece of equipment that is self-acting and self-regulating.  Fixed automation is a manufacturing process that produces one type of part or product in a fixed sequence of simple operations.  Flexible (or programmable) automation is a manufacturing process that can be changed easily to handle various products.

© 2007 Pearson Education Flexible Automation at R.R. Donnelley  R.R. Donnelley is the largest commercial printer in the United States.  Uses a make-to-order strategy  Orders often were as high as 100,000 books.  High “make-ready” times for new orders and time- consuming change over of the presses was costly.  Flexible automation allowed them to reduce this time to 12 minutes.  Throughput increased 20% without having to purchase any additional presses.  Productivity also increased 20%.

© 2007 Pearson Education Economies of Scope  In certain types of manufacturing, such as machining and assembly, programmable automation breaks the inverse relationship between resource flexibility and capital intensity.  Economies of scope are economies that reflect the ability to produce multiple products more cheaply in combination than separately.  With economies of scope, the often conflicting competitive priorities of customization and low price become more compatible.  Taking advantage of economies of scope requires that a family of parts or products have enough collective volume to fully utilize equipment.

© 2007 Pearson Education Decision Patterns for Service Processes Front office Hybrid office Back office Low High Low customer-contact process Less complexity, less divergence, more line flows Less customer involvement Less resource flexibility Capital intensity varies with volume.. High customer-contact process More complexity, more divergence, more flexible flows More customer involvement More resource flexibility Capital intensity varies with volume. Major process decisions

© 2007 Pearson Education Decision Patterns for Manufacturing Processes Major process decisions Continuous process Job process Line process Large batch process Small batch process Batch Processes High-Volume, make-to-stock process Less complexity, less divergence, more line flows Less customer involvement Less resource flexibility More capital intensity Low-Volume, make-to-order process More complexity, more divergence, more flexible flows More customer involvement More resource flexibility Less capital intensity Low High

© 2007 Pearson Education Focus by Process Segment  A facility’s process often can neither be characterized nor actually designed for one set of competitive priorities and one process choice.  At a services facility, some parts of the process might seem like a front office and other parts like a back office.  Plants within plants (PWPs) are different operations within a facility with individualized competitive priorities, processes, and workforces under the same roof.  Focused factories are the result of a firm’s splitting large plants that produce all the company’s products into several specialized smaller plants.

© 2007 Pearson Education Strategies for Change  Process Reengineering is a fundamental rethinking and radical redesign of processes to improve performance dramatically in terms of cost, quality, service, and speed.  The primary enabler—information technology.  Clean-slate philosophy.

© 2007 Pearson Education Strategies for Change  Process improvement is the systematic study of the activities and flows of each process to improve it.  Streamline the existing process.  It relies on employees involvement.