National Road Pricing Conference June 4, 2010 Ginger Goodin, Texas Transportation Institute Greg Jones, Federal Highway Administration.

Slides:



Advertisements
Similar presentations
Minnesotas Congestion Pricing Program Road User Charging Conference January, 2009 By Bernie Arseneau Minnesota (USA) Department of Transportation.
Advertisements

General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Expanding the Potential of Tolling: A 21 st Century Look AASHTO November 18, Brian Peters Florida DOT, Assistant Secretary of Finance and Administration.
Getting Started with Congestion Pricing A Workshop for Local Partners Federal Highway Administration Office of Operations.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
Kenneth R. Buckeye, AICP Minnesota Department of Transportation.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
1. 2 VIA Long Range Plan  Vision for High-Capacity Transit across VIA service area by 2035  From extensive public and stakeholder input  Prioritization.
Urban Transport in the Developing World. Elements of Urban Transport Sector Urban public transport: Urban public transport: On-street systems (for buses,
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Presentation to the Subcommittee on Highways and Transit and the House Committee on Transportation and Infrastructure Peggy Catlin, Deputy Executive Director.
Joint I-680 Sunol JPA & I-580 Policy Committee Workshop – September 9, 2013 A Presentation for the I-580 Express Lane Policy Advisory Committee April 9,
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
National Road Pricing Conference June 4, 2010 Jennifer Tsien, PBS&J Angela Jacobs, Federal Highway Administration.
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Transit Alliance 4 Founded in Coalition of 39 groups 4 Local governments 4 Business organizations 4 Community groups.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
Urban Road Pricing: US DOT Congestion Initiative and Urban Partnerships 14 th World Congress on ITS IBEC Special Session October 10, 2007 Beijing Exhibition.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
MARYLAND FREIGHT SUMMIT Freight in the Mid-Atlantic Region Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration September.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Tolling and Pricing Opportunities Under the Federal-aid Highway Program January 2006.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Interstate 95 Corridor Improvement Program June 20, 2012.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Engaging State DOT’s Engaging State DOT’s 2008 ITS America State Chapters Council Annual Meeting and State Chapters Strengthening Workshop Bernie Arseneau,
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
US DOT Congestion Initiative Urban Partnership Agreements I-95 Corridor Coalition EPS Summit September 19, 2007 Boston, Massachusetts Jeffrey F. Paniati.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
US DOT Congestion Initiative Urban Partnership Agreements NTOC Summer Meeting September 7, 2007 Washington, DC Jeffrey F. Paniati Associate Administrator,
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Analysis of the IH 35 Corridor Through the Austin Metropolitan Area TRB Planning Applications Conference Jeff Shelton Karen Lorenzini Alex Valdez Tom Williams.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
Transit Pricing Programs Value Pricing for Transportation in the Washington Region June 4, 2003 Richard F. Stevens Washington Metropolitan Area Transit.
Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration US Department of Transportation Congestion Initiative Update I-95.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
I-680 Value Pricing: A HOT Lane Demonstration Project of “Smart Carpool Lanes” Sponsor: Alameda County Congestion Management Agency 2003 Sponsor: Alameda.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
Geometric Design: General Concept CE331 Transportation Engineering.
1 National Governors Association Roundtable Presentation April 2, 2001 Dr. Christine Johnson Director, ITS Joint Program Office Program Manager, FHWA Operations.
The 2006 Constrained Long-Range Transportation Plan: Plan Performance Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item #7.
1 USDOT Congestion Initiative Baltimore – Washington Regional Traffic Signal Forum Maritime Institute Linthicum, MD March 14, 2007 Regina McElroy Director,
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Integrating Transit and Highway Solutions In High Volume Corridors
MODULE 2: TSMO Strategies
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
MODULE 2: TSMO Strategies
Presentation transcript:

National Road Pricing Conference June 4, 2010 Ginger Goodin, Texas Transportation Institute Greg Jones, Federal Highway Administration

Workshop Purpose Provide hands-on practice in applying lessons learned and best practices from implemented projects across the country Understand the challenges in implementing pricing projects Move pricing forward in your area

Workshop Agenda Review of Project Break into groups for exercises Five subject areas covered 5-10 minute overview of subject area minutes to complete exercise Break for lunch after second round of exercises Group reports

Subject Areas Planning Operations Design Funding and Finance Outreach  No specific order, all have overlapping elements

Our Project Length: 15 miles 6 lanes with 10’ shoulders on both sides 165,000 AADT and growing Peak period speeds consistently reach 30mph Drainage inlets every 0.5 mile with 4” depression in left shoulder Additional 20’ of ROW periodically available beyond right shoulder Rumble strips on outside edgelines Four bridge abutments exist along the facility Existing ITS components include cameras, loop detection in all lanes at half mile spacing and on freeway ramps, DMS, & ramp meters.

Downtown Employment Suburban Community Population 40,000 $40k median income 40% minorities 1.3 autos per household Suburban Community Population 20,000 $75k median income 20% minorities 1.9 autos per household Park and Ride Competing ArterialLength: 20 milesPeak TT: min CompetingRadialFreewayCurrently 4 lanes,very congested, tobe expanded to6 lanes in thefuture Radial Freeway6 lanesLength: 15 miles165,000 AADT Total Travelshed Population: 200,000 $50k median income 30% minorities 1.5 autos per household 8 miles Transit Service Peak TT: min Peak TT: min Freeway Travel Time to Downtown GPL Peak: min Freeway Travel Time to Downtown GPL Peak: min

Project Characteristics Corridor History Congestion worsening Downtown businesses seeking alternatives to bring more commuters downtown Opposition to capacity improvements on adjacent radial corridor from environmental interests Corridor demographics Varies by sub-area Total travelshed population = 200,000 $50,000 median income 30% minorities 1.5 autos per household

Project Characteristics General Purpose Lanes 6 lanes with 10’ shoulders 165,000 AADT and growing

Project Characteristics Project Partners State DOT Owner of lanes and ROW Operator of freeway Transit authority Operator of express bus service and park-and-ride facilities Regional toll authority Operates one toll road in region Cash and transponder-based electronic tolling Metropolitan Planning Organization State Police Enforces traffic laws on state highways

Project Characteristics Legal authority – HOT and shoulder running allowed by state statute Regional policies – none for shoulder conversion Project partners – state DOT (owner of ROW), transit authority, regional toll authority, state police Toll authority currently operating one toll road in region with ETC (transponder) Environmental clearance – FONSI expected Design exceptions – submit request to FHWA prior to implementation

Project Characteristics Cross section Access Location and method of access undetermined Enforcement Subject to design and location

Project Characteristics Estimated project costs Capital costs: $ 10,000,000 Annual operating costs: $ 1,000,000 Bus volumes Available funding State is committed to contributing $ 8,000,000 Traffic and revenue studies - none Revenue sharing potential – Regional toll authority Possible funding partners - Regional toll authority and transit agency

Planning Establish goals and objectives and clearly communicate a vision Take advantage of opportunities Maintain flexibility Engage project partners and encourage agency cooperation

Planning Exercise

Operations Develop a Concept of Operations to guide the process Establish a minimum operating speed threshold of 45 mph for HOT operation Select the appropriate user group to best optimize the added capacity and achieve stated objectives Ensure that temporary use of the shoulder as a HOT lane is only deployed when needed

Operations Establish operational procedures that ensure the safety of users and help maximize the potential benefits of using the shoulder during congested periods Ensure operations integrate with existing systems Determine if existing incident management protocol will be applicable to shoulder operations European applications of shoulder use have typically been accompanied by one or more ATM strategies

Operations Exercise

Design Ensure the safest design possible that provides adequate space for identified users and necessary maneuvers Provide adequate space for emergency refuge and/or enforcement whenever possible Provide clear information to users to ensure their comprehension of the facility and the specifics of operation

Design Exercise

Funding and Finance Consider any and all funding and/or financing mechanisms Available assistance through federal programs Stakeholders Revenue sharing

Finance Exercise

Outreach Identify project champions Conduct market research and identify issues Develop clear and concise messages Communicate project goals Continue from project development through operations Create brand awareness

Outreach Exercise

Breakout Group Reports