P10229: Composites Autoclave Brian Cario: ME Matt Brady: ME Matt DiFrancesco: ME Brandon Allen: EE John Mink: EE.

Slides:



Advertisements
Similar presentations
Fired And Unfired Pressure Vessels
Advertisements

HVAC523 Heat Sources.
26/2704 Vacuum Feature What is vacuum Vacuum in industry
1 The Importance of Force and Displacement Resistance Welding Training Marty Mewborne Product Engineer.
LEarNeR© Kit 1- Core LENR Reactor Description of hardware, fittings and raw metal that can be purchased. Prices, part numbers & vendors, high pricing for.
Office: (903) Web: Advanced Technology for the Heat Treatment Industry.
P10229: Composites Autoclave Brian Cario: ME Matt Brady: ME Matt DiFrancesco: ME Brandon Allen: EE John Mink: EE.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Vacuum Vessel Production Readiness Review
Engineer Presentation
Introduction To Programmable Logic Controllers
Dakota Nickerson, Kyle Pflueger, Adam Leschber, Andrew Dahlke M.E. Undergrad 1.
Dakota Nickerson, Kyle Pflueger, Adam Leschber, Andrew Dahlke M.E. Undergrad 1.
04013 Micro Turbine Senior Design Micro Turbine Senior Design PDR – May 20 th, 2004 Project
Harnessing Free Heat. The Energy Harness provides hot water using multiple heat sources, making the best use of low grade heat. It improves the efficiency.
P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
Team Members: Bryan McCormick (ME) Andy Freedman (ME) John Kreuder (ME) Ken McLoud (ME) Jon Holdsworth (EE) Gabriela Santa Cruz (IE) Thermoelectric Module.
P10229: Composites Autoclave Brian Cario: ME Matt Brady: ME Matt DiFrancesco: ME Brandon Allen: EE John Mink: EE.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
Pressure Vessel Stress Calculations Brian. Stress calculations for a 5 foot Long 2 foot in diameter cylindrical pressure vessel during normal operation.
P10229: Composites Autoclave Brian Cario: ME Matt Brady: ME Matt DiFrancesco: ME Brandon Allen: EE John Mink: EE.
P /20093 Composites Autoclave Brandon Allen (EE) Matt Brady (ME) Brian Cario (ME) Matt DiFrancesco (ME) John Mink (EE) ‏ Chris DeMinco.
Team 12 Amelia House Paul Jaffa Johanna Miller Brian Ortega.
Thermopile Test Bench Detailed Design Review Team Thermopilers Adrian Aspinall, David Eld, Tyler Merritt, Paul Sowinski, Michael Sotolongo 1.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
© Copyright 2010 Dresser-Rand Gasket Cell Relocation [Revision: Feb 2011] Team Members: Cody Willmart, Aaron Marcotte, Jacky Li, Daniel Swol, Tyler Borden.
STEAM HEATING.
GARLOCK EXPANSION JOINT (MSDI-P13671) Systems Design Review January 11 th, 2013 Friday, January 11, 2013P Garlock Expansion Joint 1.
GARLOCK EXPANSION JOINT (MSDI-P1367) Systems Design Review January 11 th, 2013 Friday, January 11, 2013P Garlock Expansion Joint 1.
Power Generation for the Better Water Maker: Subsystems Design Review October 29, 2013.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
NCSX Autoclave FDR Steve Raftopoulos 6/03/03. Agenda Presentation: –Intro & Background –Requirements –Design Analysis Results –Review of PDR Chits –Calculations.
ME 414 : Project 1 Heating System for NASA North Pole Project Team Members Alan Benedict Jeffrey Jones Laura O’Hair Aaron Randall May 5, 2006.
Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4276 Fall 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor,
NSTX TF Bundle & Center Stack Curing Oven Mike Viola Joe Rushinski Frank Jones April 14, 2003.
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
Component Environmental Test Chamber Jeff Hughes 1, Peter Adam 1, Thong Vo 2 and Phong Ngo 2 1. Department of Mechanical and Material Engineering, 2. Department.
Hypothetical day with and without Grid Net Controller: Wind turbine generates 7.5kW for first ½ of day, and 1kW for second ½ of day Utility does not pay.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
NCSX Autoclave PDR Steve Raftopoulos Frank Jones 1/8/03.
Regulation Electrical pressure regulation provides  Accurate control  Quick response time  Additional Safety features Electrical temperature control.
High Temperature Waste Pasteurizer Brian Kilger Kyle Cohn Kyle Weston Stephanie Mauro Parabolic curve P13411.
P13411: High Temperature Waste Pasteurizer Kyle Weston – Team Lead Eng. Kyle Cohn – Lead Structural Eng. Brian Kilger – Lead Manufacturing Eng. Stephanie.
Thermoelectric Cooling Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu Client: Greenfield.
CUE – Make Any Pump an E-Pump
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
P16221 – FSAE Shock Dynamometer Problem Definition Review.
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
January 16, 2009Senior Design I - System Level Design Review System Level Design Review Senior Design I Low Energy Printing Project P09505.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Project: P08371 Portable Command Post Rick Chadwick ME Harith Wijetungage IE Scott Pudlewski EE Sponsors: Technet Global Services DiLorenzo Electronics.
S A Griffiths CM42 June 2015 Electrical & Control.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Pipe Integrity Check using Finite Element Analysis
Advisor: Dr. Shangchao Lin
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
CEDAR Detector Ventilation System Review
MSD P15280 RIT HOT WHEELZ TEST BENCH
P10229: Composites Autoclave
Team P08404: Solar Pasteurizer Concept / System Design Review
Detailed Design Review Solar Thermal Water Heater
Presentation transcript:

P10229: Composites Autoclave Brian Cario: ME Matt Brady: ME Matt DiFrancesco: ME Brandon Allen: EE John Mink: EE

2 Preliminary Design Review Agenda Project Background Project Objectives Benchmark Potential Users Customer Requirements Engineering Specifications Project Schedule Work Breakdown Concept Screening and Selection System Function Risk Mitigation Design Feasibility Studies Preliminary Project Budget Next Steps

3 Background: Purpose of an Autoclave Device for Curing Components Made of Composite Materials Under Heat and Pressure High-Strength, Low Mass Very Low Void Ratio 10x Wet Layup Image Courtesy directindustry.com

4 Project Objectives Senior Design 1Senior Design 2 TasksConcept Generation and Selection Complete Pressure Vessel Construction Detailed Design, Ready for Construction Test Pressure Vessel Spec Stock PartsFinal Assembly Test Autoclave DeliverablesComplete Autoclave DesignComplete, Operable Autoclave Partially Built Pressure VesselManual for Operation Some Parts Obtained

5 Benchmark: ASC Process Systems Econoclave 22” Dia x 48” Long Working Volume 200psig Max Pressure 500 o F Max Temperature 5 o F Temp Uniformity PC User Interface Electric Heat Extensive Safety Systems Fast-Closing Door Priced from $85k-$120k plus delivery and setup

6 Potential Users of an Autoclave at RIT MET Department--Student Projects Proposed location: Composites Lab Student Teams: Baja, Formula, Aero ME Department for Research CIMS Future Senior Design Groups Anyone Needing a super lightweight structure Possible Outside Users Future, Unforeseen Uses

7 Why Have an Autoclave at RIT? Strong lightweight components are becoming increasingly important Rented Autoclave Time is Rare and Expensive Production-Scale Utility Bills can reach $750/run On-Site Option Offers Convenience Could be Customized for Other Future Uses Learning Tool Enables Ongoing, Long-Term Research Renting Time Could Generate Funding

8 Customer Requirements Customer Need # ImportanceDescriptionComments/Status CN11The pressure vessel can safely hold F Pressure vessel will by hydrostatically tested to 300 psi CN21 Heating system can reach and maintain a temperature of 400F CN31The autoclave operates on 440 VAC or 220 VAC CN41 The autoclave is protected from over pressurization and over heating CN51The autoclave is accompanied by an operations manual CN61The pressure vessel has fittings for an external vacuum pump CN71The autoclave has safety signage CN82 The pressure vessel has a door sized the entire cross sectional area of the chamber CN92 The user interface directly controls pressure, temperature (ramp rates, cooling) CN102 The user interface displays pressure and temperature in real time CN112The pressure vessel is capable of holding a vacuum CN122The pressure vessel is thermally insulated CN132The autoclave has a uniform internal temperatureThis will be done with a blower CN143The pressure vessel interior is 3' in diameter and 4' deepThis is very budget depending CN153The autoclave is portable Pressure vessels are usually very heavy so portability is not feasible CN163The autoclave has plumbing for integrated cooling system

9 Engineering Specifications MetricNeedSpecification or MetricImp.UnitsMarginal ValueIdeal Value 11,6Emergency Pressure Relief1psiMAOP +60MAOP Max Operating Temperature1Deg F Emergency Shut off Temperature1Deg FMAOT +100MAOT Delta Chamber Cut off Temperature1Deg F+/- 75+/- 50 5ASME,1Certification Pressure1psi1.5 * MAOP2 * MAOP 61Max Operating Pressure2psi Temperature Ramp Rates2Deg F/min510 82Temperature Resolution2Deg F101 91Pressure Resolution2psi101 3Interior Diameter3ft13 113Interior Length3ft14 124Supply Voltage3VAC Autoclave Weight3lbs Max External Operating Temp3Deg F300100

10 Project Schedule and Gantt Chart

Summarized MSD 1 Timeline Week 1 Background and research autoclave functionality. Team Organization Week 2 Interview potential customers Develop engineering specifications Week 3 Concept generation and selection Risk management Future Scheduling Week 4 Determine design feasibility Prepare for Preliminary Design Review Week 5 Prepare preliminary design review Weeks 6-8  Detail design generation  Spec stock components  Finalize Budget Week 8  Begin Pressure vessel construction Week 9  Generate Bill of Materials  Begin preparation for Final Design Review Week 10  Prepare for Final Design Review

12 Concept Screening Matrix: Pressure Vessel ABCDEF (Reference) Selection Criteria Fabricated Non-Certified Vessel Cast Iron Pipe and Flanges High- Pressure Water Tank ASME Certified (Econoclave) Used Certified Vessel Square Vessel Instead of Cylindrical Cost Ease of Manufacture Ease of Integration of I/O Ports Ease of Adding Door Pressure Capability Safety Certification Needs Weight Portability Ease of Heating Sum + 's Sum 0's Sum -'s Net Score RankT26T4T21T4 Continue?YesNo YesNo

13 Weighted Concept Selection Matrix ABC D EE (Reference) Fabricated Non-Certified Vessel Cast Iron Pipe and Flanges High Pressure Water Tank ASME Certified (Econoclave) Used Certified Vessel Square Instead of Cylindrical Selection CriteriaWeightRatingWtdRatingWtdRatingWtdRatingWtdRatingWtdRatingWtd Cost20% Ease of Manufacture10% Ease of Integration of I/O Ports 7% Ease of Adding Door10% Pressure Capability8% Safety15% Certification Needs15% Weight3% Portability2% Ease of Heating10% Total Score Rank Continue? YesNo YesNo

14 System Function

15 System-Level Risk Mitigation

16 Pressure Vessel Feasibility Based on a 24” Diameter, 5-foot long Pressure Vessel Constructed of 0.250” Wall Grade-B Pipe, Caps, and Flanges Yield Pressure is Limited by Hoop Stress in the Cylindrical Portion of the Vessel to psi This is 3.86 times out maximum operating pressure of 150psi

17 Insulation Feasibility 0.4m Outer Radius Corresponds to a 3.5” Thick Layer of Insulation Using Common R13 Fiberglass this gives an Outer Surface Temp of 80F

18 Heating System Feasibility Total power to maintain max. temp: ~470W Total power to heat up air at 15F/min (total 27 min): ~1.5kW Allowing for thermal mass of parts/molds/pipe, ~4-5 kW needed Can easily be run on available 240V power Elements of this size commonly available Blower inside vessel will help maintain uniform temp.

19 Pressurization Feasibility Assumes Use of Standard AL-size (9”x53” nom.) Gas Cylinder Filled with Gaseous Nitrogen One Bottle good for one full pressure run of 124psi or several runs at reduced pressure. Run NumberInitial Cyl Pressure (psi)Run Pressure (psi)Final Cyl Pressure (psi) 12000MAX Run NumberInitial Cyl Pressure (psi)Run Pressure (psi)Final Cyl Pressure (psi) Run NumberInitial Cyl Pressure (psi)Run Pressure (psi)Final Cyl Pressure (psi)

20 Preliminary Electrical Design 240VAC Supply Stepped down to 120VAC and 12VDC as needed Electrical Pressure Control for Good Precision, Added Safety Electrical (PID) Heating Control including control of Ramp Rates External Electrical Layout

Bulkhead Connector Pressure tested to 2000psi Available with multiple wire combinations 9-wire, 22awg connector will work for our application Image ©

Electrical Load Heater ~ 220V, approximately 23A Blower ~ ½ hp = 220V, approximately 1.7A Computer ~ 110V, approximately 3A DC Power supply ~ 1kW about 10A Pressure Regulator ~ 50mA at 12V 220V – 110V Transformer ~ 1kW, approximately 5A

23 Control System Feasibility

24 Preliminary Safety System Plan MSDS for potential resin systems External Signage Extensive Operations Manual Door Proximity Switch Over-pressure Blow-Off Valve Exhaust Routed into existing Fume Hood Thermal Fuse All Relays and Solenoid Valves Default to Safe Software Able to Detect Unsafe Conditions Emergency Stop Button

25 Estimated Initial Budget Pressure Vessel 2' Diameter x 5' Long Pipe1N/ADonated 24" Outer Diameter Tank End Cap " Outer Diameter 1.88" Thick Flange " x 2" x.25 " Angle Steel40'9.00 per 4'90 24" x 48" x 3/16 Sheet Steel145 5" Diameter Swivel Caster "-14 x 5" Grade 5 Bolts for "-14 Grade 5 Nuts for ' x 2' x 3/4" Steel Plate for Hinge Fabrication Miscellaneous Other Tank HardwareN/A 20 Labor for Tank Machining and Welding10 Hours100/hr1000 Subsystem Total Pressurization Nitrogen Regulator1150 Input Solenoid Valve175 Dump Solenoid Valve185 Pipe/Hose/Fittingsmisc.75 Subsystem Total385 Heating, Insulation, Circulation R13 Insulation63 ft^220 5kW Incoloy Heating Element1250 Sheetmetal Shell1125 Blower Motor1100 Squirrel Cage Blower115 Hi Temp Hi Pressure Shaft Seal23060 Subsystem Total570 Electrical 250C Rated Wire100ft30/50ft60 Standard THHN Wire100ft15/50ft30 1/2" Sealtite Conduit50ft50/100ft50 PaveTechnologies Bulkhead Connector Subsystem Total410 Controls Thermocouple5525 Pressure Transducer190 Control Board1250 Subsystem Total365 Total$

26 Commitments to Date $2000 from KGCOE Multidisciplinary Senior Design Pipe and Potential Labor Donated by Rochester Gas and Electric – estimated value = $ hr/week x 5 team members x 22 weeks = 1650 hours x $85/hr = $140k+ in Free Design Time from the P10229 Team

27 Next Steps Procure Funding – by Complete Detailed Design Failure Mode Analysis FEA on Pressure Vessel, Stand Begin Pressure Vessel Fabrication Spec Stock Parts Simulate Controls and Software Solidify exact heating requirements

Heating Concept Screening Matrix ABCD (Reference) Selection Criteria Static Incoloy Heating Elements (no circulation) Nichrome Wire External Gas Burner/Heat Exchanger Convection Incoloy Tubular Heating Elements Manufacturing Cost++-0 Ease of Manufacture+0-0 Response Time--00 Ease of Control-0-0 Pressure Capability00-0 Safety-0-0 Infastructure Needs00-0 Operating Cost00+0 Portability00-0 Temperature Uniformity--00 Sum + 's2110 Sum 0's47210 Sum -'s4270 Net Score Rank3241 Continue?NoYesNoYes

Heating Weighted Concept Selection A B C D Static Incoloy Heating Elements (no circulation)Nichrome Wire External Gas Burner/Heat Exchanger (Reference) Convection Incoloy Tubular Heating Elements Segment Selection CriteriaWeightRatingNotesWtdRatingNotesWtdRatingNotesWtdRatingNotesWtd Manufacturing Cost15% Ease of Manufacture15% Response Time15% Ease of Control8% Pressure Capability10% Safety10% Infastructure Needs10% Operating Cost5% Portability2% Temperature Uniformity10% Total Score Rank Continue? No Yes

Pressurization Concept Screening Matrix ABCD (Reference) Selection Criteria Shop Air with AccumulatorShop Air Bottled Gaseous Nitrogen On-board Compressor Manufacturing Cost-++0 Ease of Manufacture-++0 Temperature Stability00+0 Operating Cost00-0 Pressure Capability--+0 Safety0000 Certification Needs-000 Weight-++0 Portability--00 Strain on Infastructure0-00 Pressurization Rate+0+0 Sum + 's1360 Sum 0's45411 Sum -'s6310 Net Score Rank4T21 Continue?No YesNo

Pressurization Weighted Concept Selection A B C D Shop Air with AccumulatorShop Air Bottled Gaseous Nitrogen (Reference) On-board Compressor Segment Selection CriteriaWeightRatingNotesWtdRatingNotesWtdRatingNotesWtdRatingNotesWtd Manufacturing Cost9% Ease of Manufacture9% Temperature Stability15% Operating Cost9% Pressure Capability15% Safety10% Certification Needs9% Weight3% Portability2% Strain on Infastructure10% Pressurization Rate9% Total Score Rank Continue? No Yes No

Controls Concept Selection Matrix ABCD (Reference) Selection Criteria On/Off (no adjustability)Knobs and DialsPID Control Computer Interfaced Manufacturing Cost+++0 Ease of Manufacture+++0 Ease of Operation+0-0 Temperature Control--00 Feedback--00 Programmability---0 Safety Controls--00 Weight+++0 Portability+++0 Sum + 's5440 Sum 0's0139 Sum -'s4420 Net Score Rank2T31 Continue?Yes

Controls Weighted Concept Selection A B C D On/Off (no adjustability)Knobs and DialsPID Control (Reference) Computer Interfaced Segment Selection CriteriaWeightRatingNotesWtdRatingNotesWtdRatingNotesWtdRatingNotesWtd Manufacturing Cost5% Ease of Manufacture10% Ease of Operation18% Temperature Control 18% Feedback15% Programmability15% Safety Controls15% Weight2% Portability2% Total Score Rank Continue? No Yes

Resin System MSDS