March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.

Slides:



Advertisements
Similar presentations
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Advertisements

April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
CFD and Thermal Stress Analysis of Helium-Cooled Divertor Concepts Presented by: X.R. Wang Contributors: R. Raffray and S. Malang University of California,
September 24-25, 2003 HAPL meeting, UW, Madison 1 Armor Configuration & Thermal Analysis 1.Parametric analysis in support of system studies 2.Preliminary.
Thermo Fluid Design Analysis of TBM cooling schemes M. Narula with A. Ying, R. Hunt, S. Park ITER-TBM Meeting UCLA Feb 14-15, 2007.
October 16-19, 2000 A. R. Raffray, et al., ARIES-AT Blanket and Divertor, ANS Top. Meet. On TOFE ARIES-AT Blanket and Divertor A. R. Raffray 1,
March 21-22, 2006 HAPL meeting, ORNL 1 Status of Chamber and Blanket Effort A. René Raffray UCSD With contributions from: M. Sawan B. Robson G. Sviatoslavsky.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
P ROGRESS ON THE O VERALL P OWER C ORE C ONFIGURATION OF THE ARIES-ACT X.R. Wang 1, M. S. Tillack 1, S. Malang 2 1 University of California, San Diego,
Progress on the Configuration Design of the Fusion Power Core for the ACT (Draft) X.R. Wang M.S. Tillack S. Malang Sept. 29, 2011.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.
September 11, 2000 A. R. Raffray, et al., High Performance Blanket for ARIES-AT Power Plant, SOFT 2000 High Performance Blanket for Aries-AT Power Plant.
June 14-15, 2006/ARR 1 ARIES-CS Power Core Engineering: Updating Power Flow, Blanket and Divertor Parameters for New Reference Case (R = 7.75 m, P fusion.
Status of the Modular and Field- Period Replacement Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and L. El-Guebaly ARIES Meeting.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
March 16-17, 2000ARIES-AT Blanket Design and Power Conversion, US/Japan Workshop/ARR ARIES-AT Blanket Design and Power Conversion The ARIES Team Presented.
Thermal Analysis of Helium- Cooled T-tube Divertor S. Shin, S. I. Abdel-Khalik, and M. Yoda ARIES Meeting, Madison (June 14-15, 2005) G. W. Woodruff School.
August 17, 2000 ARIES: Fusion Power Core and Power Cycle Engineering/ARR 1 ARIES: Fusion Power Core and Power Cycle Engineering The ARIES Team Presented.
June 16, 2004/ARR 1 Thermal-Hydraulic Study of ARIES-CS Ceramic Breeder Blanket Coupled with a Brayton Cycle Presented by A. R. Raffray With contributions.
Characteristics of Commercial Fusion Power Plants Results from ARIES-AT Study Farrokh Najmabadi Fusion Power Associates Annual Meeting & Symposium July.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
Ceramic Breeder Blanket Conceptual Design for ARIES-CS Contributors: S. Malang, A.R. Raffray, and L. El-Guebaly ARIES Meeting University of Wisconsin,
January 23, 2006/ARR 1 Status of Engineering Effort on ARIES-CS Power Core Presented by A. René Raffray University of California, San Diego With contributions.
Scoping Study of He-cooled Porous Media for ARIES-CS Divertor Presented by John Pulsifer Major contributor: René Raffray University of California, San.
Highlights of ARIES-AT Study Farrokh Najmabadi For the ARIES Team VLT Conference call July 12, 2000 ARIES Web Site:
May 6-7, 2003/ARR 1 ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach Presented by A. R. Raffray University of California, San Diego.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
July 4, 2001 A. R. Raffray, et al., ARIES-AT Blanket and Divertor Design, SNECMA, Bordeaux, France 1 ARIES-AT Blanket and Divertor Design Presented by.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Extrapolating Experimental Results for Model Divertor.
Development of the FW Mobile Tiles Concept Mohamed Sawan, Edward Marriott, Carol Aplin University of Wisconsin-Madison Lance Snead Oak Ridge National Laboratory.
P ROGRESS ON THE O VERALL P OWER C ORE C ONFIGURATION OF THE ARIES-ACT X.R. Wang 1, M. S. Tillack 1, S. Malang 2 1 University of California, San Diego,
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Update on Thermal Performance of the Gas- Cooled.
Neutronics Parameters for Preferred Chamber Configuration with Magnetic Intervention Mohamed Sawan Ed Marriott, Carol Aplin UW Fusion Technology Inst.
Progress in ARIES-ACT Study Farrokh Najmabadi UC San Diego Japan/US Workshop on Power Plant Studies and Related Advanced Technologies 8-9 March 2012 US.
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
Engineering Overview of ARIES-ACT1 M. S. Tillack, X. R. Wang and the ARIES Team Japan/US Workshop on Power Plant Studies and Advanced Technologies
Neutronics Analysis for K-DEMO Blanket Module with Helium coolant June 26, 2013 Presented by Kihak IM Prepared by Y.S. Lee Fusion Engineering Center DEMO.
MHD/Heat Transfer considerations for SiC FCI in DEMO and ITER Sergey Smolentsev DCLL Special Meeting at UCLA April 23-24, 2007.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
U PDATED ARIES-ACT P OWER C ORE D EFINITION AND S I C B LANKET X.R. Wang, M. S. Tillack, S. Malang F. Najmabadi and L.A. El-Guebaly ARIES-Pathways Project.
1 Parametric Thermal-Hydraulic Analysis of TBM Primary Helium Loop Greg Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI.
August 9, 2006 Design, Fabrication and Maintenance Considerations of Blanket Options for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M.
Forschungszentrum Karlsruhe FZK - EURATOM ASSOCIATION 05/14/2005 Thomas Ihli 1 Status of He-cooled Divertor Design Contributors: A.R. Raffray, and The.
March 29-31, 2001 A. R. Raffray, et al., ARIES-AT Blanket and Divertor, Japan-US Workshop, Tokyo 1 ARIES-AT Blanket and Divertor Design Presented by A.
R EFINEMENT OF THE P OWER C ORE C ONFIGURATION OF THE ARIES-ACT SA X.R. Wang 1, M. S. Tillack 1, S. Malang 2 and F. Najmabadi 1 1 University of California,
Helium-Cooled Divertor Options and Analysis
Update on ARIES ACT2 Power Core Design and Engineering X. R. Wang, M. S. Tillack, C. Koehly ARIES Project Meeting 18 September2013 ARIES UC San Diego UW.
Systems Analysis Development for ARIES Next Step C. E. Kessel 1, Z. Dragojlovic 2, and R. Raffrey 2 1 Princeton Plasma Physics Laboratory 2 University.
DCLL ½ port Test Blanket Module thermal-hydraulic analysis Presented by P. Calderoni March 3, 2004 UCLA.
Progress on coolant routing and MHD ARIES Project Meeting January 2012 M. S. Tillack UC San Diego.
March 3-4, 2005 HAPL meeting, NRL 1 Assessment of Blanket Options for Magnetic Diversion Concept A. René Raffray UCSD With contributions from M. Sawan.
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
November 15, 2000 A. R. Raffray, and the ARIES Team., ARIES-ST and ARIES-AT Blanket Designs, APEX Meeting Summary of Major Features of ARIES-ST and ARIES-AT.
Page 1 of 12 Design of a low pressure drop liquid metal cooling system M. S. Tillack with advice and assistance from X. R. Wang, S. Malang and others ARIES.
ARIES ACT1 Power Core Engineering M. S. Tillack, X. R. Wang, F. Najmabadi, S. Malang and the ARIES Team ANS 20 th Topical Meeting on the Technology of.
Engineering models in the ARIES system code, Part II M. S. Tillack, X. R. Wang, et al. ARIES Project Meeting January 2011.
DCLL TBM Reference Design
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Improvements to power flow modeling in the ARIES system code
Integrated Design: APEX-Solid Wall FW-Blanket
DCLL Blanket Analysis and Power Core Layout for ARIES-DB
Can We achieve the TBR Needed in FNF?
Trade-Off Studies and Engineering Input to System Code
Modified Design of Aries T-Tube Divertor Concept
University of California, San Diego
Manifolding and MHD issues
Status of ARIES-CS Power Core Engineering
ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach
Presentation transcript:

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented by A. René Raffray and Xueren Wang ARIES Project Meeting University of California, San Diego March 20-21, 2000

ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Presentation Outline Blanket –Geometry and coolant routing –Analysis MHD flow considerations Temperature and thermal stress Pressure stress Divertor –Configuration with LiPb as coolant –Preliminary flow analysis Future Work

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR ARIES-AT Machine and Power Parameters Used for Analysis Power and Neutronics Parameters Fusion Power 1737 MW Neutron Power 1390 MW Alpha Power 347 MW Current Drive Power41 MW Transport Power to Divertor 289 MW Fraction of Divertor Power Radiated Back to FW0.2 Overall Energy Multiplication1.1 Total Thermal Power1927 MW Average FW Surface Heat Flux0.5 MW/m 2 Max. FW Surface Heat Flux0.7 MW/m 2 Max. Divertor Surf. Heat Flux5 MW/m 2 Average Wall Load4.3 MW/m 2 Maximum O/B Wall Load 6.1 MW/m 2 Maximum I/B Wall Load 4.0 MW/m 2 Machine Geometry Major Radius4.8 m Minor Radius1.2 m FW Location at O/B Midplane 6 m FW Location at Lower O/B 4.8 I/B FW Location3.6 m Toroidal Magnetic Field On-axis Magnetic Field7.5 T Magnetic Field at I/B FW 10 T Magnetic Field at O/B FW 6 T

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR SiC/SiC Properties Used for Design Analysis (Consistent with SiC/SiC Town Meeting Suggestion) Density ~3200 kg/m 3 Density Factor0.95 Young's Modulus ~ GPa Poisson's ratio Thermal Expansion Coefficient4 ppm/°C Thermal Conductivity in Plane ~20 W/m-K Therm. Conductivity through Thickness ~20 W/m-K Maximum Allowable Combined Stress~190 MPa Maximum Allowable Operating Temperature ~1000 °C Max. Allowable SiC/LiPb Interface Temperature ~1000°C Maximum Allowable SiC Burnup ~ 3%

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Cross-Section of ARIES-AT Showing Power Core Components and Coolant Routing (Preliminary) LiPb Coolant –Inlet/Outlet Temperatures653/1100 °C –Inlet Pressure ~2.5 MPa (Divertor- dependent) Circuit 1 - Lower Divertor + I/B Blkt Region –Thermal Power535 MW –Mass Flow Rate 6500 kg/s Circuit 2 - Upper Divertor + 1st O/B Blkt Region –Thermal Power1040 MW –Mass Flow Rate 12,700 kg/s Circuit 3 - Hot Shield + 2nd O/B Blkt Region –Thermal Power352 MW –Mass Flow Rate 4270 kg/s

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Cross-Section of ARIES-AT Showing Power Core Components and Alternate Coolant Routing

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Plan View of ARIES-AT Power Core (Preliminary) Circuit 1 - Lower Divertor + I/B Blkt Region –Thermal Power535 MW –Mass Flow Rate 6500 kg/s Circuit 2A - Upper Divertor + 1st O/B Blkt Region –Thermal Power587 MW –Mass Flow Rate 7168 kg/s Circuit 2B - 1st O/B Blkt Region –Thermal Power453 MW –Mass Flow Rate 5532 kg/s Circuit 3A - I/B Hot Shield + 2nd O/B Blkt Region –Thermal Power188 MW –Mass Flow Rate 2282 kg/s Circuit 3B - O/B Hot Shield + 2nd O/B Blkt Region –Thermal Power164 MW –Mass Flow Rate 1988 kg/s

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Example Coolant Manifold for ARIES-AT Power Core

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR ARIES-AT Outboard Blanket Segment Configuration

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Cross-Section of ARIES-AT Outboard Blanket

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR LiPb Temperature Distribution in FW Poloidal Channel under MHD-Laminarization Effect

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR 2-D Moving Coordinate Analysis of FW Transient analysis of 2-D FW geometry over LiPb residence time to simulate 3-D situation under the assumption of conduction only in LiPb Heat flux and heat generation varied over time to reflect poloidal variation Toroidal-Radial Plan View of Blanket Outboard Region 1

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Flow and Thermal Parameters for LiPb-Cooled FW of Outboard Region 1 as a Function of FW Channel Thickness

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR 3-D Thermal Analysis of Toroidal Half of Outboard Blanket Region 1 Thermal StressTemperature

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Pressure Stress Analysis of Outer Shell of Blanket Module at Segment End

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Pressure Stress Analysis of Inner Shell of Blanket Module Maximum Differential Pressure Stress on Blanket Module Inner Shell ~ 0.5 MPa Thermal stress is too high for original thickness of 5mm Solution –Increase thickness –Add rib for same thickness

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Increasing Inner Shell Thickness to Accommodate Pressure Stress Maximum pressure stress is 122 MPa for 1.5-cm thickness Thermal Stress probably small Effect on TBR Thickness can be poloidally tapered to account for local pressure differential value

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Adding Rib to Inner Shell as an Alternative Option Increasing to Accommodate Pressure Stress Maximum pressure stress is low, 86 MPa Minimal Effect on TBR Add complexity to manufacturing Rib must be cooled Familiar look!

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Divertor Design Considerations Compatibility with Blanket Configuration and Coolant Structural Material SiC/SiC thickness < 1mm (  th ~ 235 MPa and  T SiC = 250°C for q’’= 5 MW/m 2 ) W with thin SiC insert with or without structural function Possible Concepts Dry Wall –LiPb as coolant (Preferable to avoid in-reactor high pressure He but needs innovative scheme because of poor heat transfer removal capabilities) –Porous W HX concept with He coolant as in ARIES-ST –Phase-change liquid metal (Li) Liquid Wall (Sn-Li)

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR LiPb Cooling Scheme for ARIES-AT Divertor

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Flow and Thermal Parameters for LiPb-Cooled Divertor PFC as a Function of PFC Channel Thickness

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Velocity,  P, Re, and Interaction Parameter as a Function of Divertor Channel Inlet/Outlet Slot Dimension High inertia regime (low interaction parameter) to overcome MHD-induced slanted velocity profile

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Typical Blanket and Divertor Parameters for Example Design Point Blanket Outboard Region 1 No. of Segments32 No. of Modules per Segment6 Module Poloidal Dimension6 m Avg. Module Toroidal Dimen.0.18 m FW SiC/SiC Thickness 4 mm FW CVD SiC Thickness 1 mm FW Annular Channel Thickness5 mm Avg. LiPb Velocity in FW 5.8 m/s FW Channel Re6.2 x 10 5 FW Channel Transverse Ha3540 MHD Turbulent Transition Re1.8x10 6 FW MHD Pressure Drop 0.49 MPa Maximum SiC/SiC Temp. 997°C Maximum CVD SiC Temp. (°C)1030 °C Lower Outer/Inner Divertor Poloidal Dimension1.5/1.0 m Divertor Channel Toroidal Dimension3.8 cm Divertor Channel Radial Dimension3.75 cm Number of Divertor Channels 744/595 SiC Insert Thickness 0.5 mm W Thickness 3 mm PFC Channel Thickness 2 mm Number of Toroidal Passes3/2 Velocity in PFC Channel 1/ 1.2 m/s Maximum SiC Temperature 1000/1040°C Maximum W Temperature 1150/1180°C W (1-D) Thermal Stress 162 MPa Toroidal Dimension of Inlet and Outlet Slot1 mm Vel. in Inlet & Outlet Slot to PFC Channel 2.5/3.1 m/s Interaction Parameter in Inlet/Outlet Slot0.34/0.42 Pressure Drop 0.47/0.5 MPa

March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Future Work Includes: Converge on coolant routing scheme Converge of maintenance scheme Tabulated list of parameters (LiPb volume and mass in different components, etc..) Blanket fabrication flow diagram Power cycle: Better characterization of heat exchanger Divertor –Recommend using LiPb as reference coolant and He as back-up option -Inlet and toroidal flow in PFC channel under low interaction parameter must be verifiedby detailed MHD analysis and testing –Detailed thermal and stress analysis