GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.

Slides:



Advertisements
Similar presentations
ISIM Integration & Test Mike Drury JWST-PRES
Advertisements

GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 1 GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Michael.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
Collaboration Meeting at UCI, April 7-9, 2005 EMI Control System Design Kurt Liewer.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review TVAC at NRL? Status July 12, 2007 Neil Johnson.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005.
GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 IDPU Mechanical / Thermal Preliminary Design Review Heath Bersch University of California - Berkeley.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
LAT Environmental Test PDR1 GLAST LAT Project 3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 EMI/EMC LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
SPP Fluxgate MAG input to FIELDS Quarterly Review – 7/18/2013 Bob MacDowall, Ron Oliversen, Dave Sheppard, Scott Murphy, Jim Odom, Jack Connerney.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
GLAST LAT ProjectEnv Test Planning,15 March 2005 LAT System Engineering 1 LAT Thermal Vac EGSE Cabling.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
FIELDS MEP Thermal Vacuum Cycling iPER
Gayle K. Martin November 14, 2016
Bill Donakowski Mechanical Engineer UCB/SSL
VELO Thermal Control System
Environmental Test Planning
FIELDS SCM Thermal iPER
GLAST Large Area Telescope:
LAT Requirements Verification in TVAC
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
GLAST LAT System Engineering
Thermal Vacuum Test: Plans and Procedures
GLAST LAT System Engineering
Integration and Test Organization Chart
Environmental Test Planning Meeting
GLAST Large Area Telescope:
Design Integration and Analysis
SNS PPU Cryomodule Instrumentation
Presentation transcript:

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and Cable Layouts LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and Cable Layouts Rich Bielawski

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 2 Outline LAT EGSE –LAT Power and Monitoring LAT Power Rack LAT Control Rack –VSC Test Cable Layouts –High Bay Ops –Vibe –Acoustic –EMI –TVAC

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 3 Power and Monitoring EGSE for LAT

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 4 Regulated Feeds Bus-Protection Unit

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 5 Unregulated Feeds Bus-Protection Unit

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 6 VSC Cable adapter and signal conditioning To LAT shield Science interfaces Primary 1553 interface GPS receiver SIU/discrete interface MVE 2304

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 7 LAT Environmental Test Planning and Design Review 3-4 May 2005 Cable Layouts LAT Environmental Test Planning and Design Review 3-4 May 2005 Cable Layouts Rich Bielawski

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 8 High Bay Cable Layout

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 9 Cable Layout - High Bay Operations (1/2) Configuration –EGSE may be located inside clean tent if there is room otherwise it will be located just outside the clean tent –All are point-to-point cables from LAT connector saver to EGSE –No unregulated power cables Thermostatically controlled survival heaters will not activate at ambient temperatures Unique Cable Requirements –Design cables so that same cable set can be used in Dynamics and EMI testing Interfaces –SC-LAT interface connectors are per the SC-LAT ICD –JL-39 and JL-69 (test ports) are per LAT-DS –BPU interface is per the SC-LAT ICD –VSC, external test point interface, external crate interfaces are SCSI except for the 1553 interface which is per the SC-LAT ICD

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 10 Cable Layout - High Bay Operations (2/2) Statistics –Cable Count: 26 –Drawings Required: 11 Taking advantage of similar cable designs Near-Term Tasks –Create wirelist –Determine cable lengths as these cables will also be used in other test phases –Begin cable drawings –Procure cable parts i.e. wire, connectors, backshells, etc

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 11 Vibration Test – LAT LPT Cable Layout

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 12 Vibration Test – Accel Cable Layout

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 13 Cable Layout - Vibration Testing (1/2) Configuration –LAT EGSE and test cables are located inside vibe room –During the actual vibe test, all LAT EGSE cables are demated except for connector savers and accel cables. –LAT is cabled up for LPT’s, i.e. between vibe axes. Uses same cables as High Bay Ops. Unique Cable Requirements –None

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 14 Cable Layout - Vibration Testing (2/2) Interfaces –Accels NRL accel boom interface is BNC EMI shield interface defined in LAT-DS Accel cable connectors are defined –Adaptors are needed in some cases –LAT EGSE test cables See High Bay Ops slide Statistics –Accels cables Cable count: 37 Drawings required: 0 (cables are purchased off-the-shelf) –LAT EGSE test cables See High Bay Ops slide Near-Term Tasks –Accel cables Most cables have been procured already –Need to verify quantity Need to procure interface adaptors –LAT test cables Same as in High Bay Ops slide

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 15 Acoustic Test - LAT LPT Cable Layout

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 16 Acoustic Test - Accel Cable Layout

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 17 Cable Layout – Acoustic (1/2) Configuration –LAT EGSE and test cables are located just outside of main chamber door. –During the actual acoustic test, all LAT test cables are demated except for connector savers and accel cables. –LAT is cabled up for LPT’s, i.e. pre- and post-test. Main chamber door is opened and test cables are routed through doorway to the LAT Use same cables as High Bay Ops Unique Cable Requirements –None

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 18 Cable Layout – Acoustic (2/2) Interfaces –Same interfaces as in Vibration Testing slide Statistics –Accels cables Cable count: 47 Drawings required: 0 (cables are purchased off-the-shelf) –LAT test cables See High Bay Ops slide Near-Term Tasks –Same as in Vibration Testing slide –Accel cables Most cables have been procured already –Need to verify quantity Need to procure interface adaptors –LAT test cables Same as in High Bay Ops slide

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 19 EMI Radiated – LAT Cable Layout

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 20 Cable Layout – EMI (Radiated) Configuration –LAT EGSE located in control room –LAT cables mated during test Cables fed through opening in chamber wall Uses same cables as High Bay Ops Unique Cable Requirements –EMI shielded cables and connector savers are required. Interfaces –Same interfaces as in High Bay Ops slide Statistics –Same status as in High Bay Ops slide Near-Term Tasks –Same status as in High Bay Ops slide

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 21 EMI Conducted – LAT Cable Layout

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 22 DAQ Feed Terminal Block (TB 1& 2)

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 23 SIU Feed Terminal Block (TB 3 & 4)

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 24 Cable Layout – EMI (Conducted) Configuration –LAT EGSE located in control room –LAT cables mated during test Cables fed through opening in chamber wall Uses same cables as High Bay Ops except for DAQ and SIU power cables Unique Cable Requirements –EMI shielded cables and connector savers are required –Need to break-out power leads for DAQ and SIU feeds Interfaces –Same interfaces as in High Bay Ops slide except for the DAQ and SIU power cables –DAQ and SIU power cables have an additional intermediate interface to terminal blocks Statistics –Cables required: 22 high bay cables + 8 breakout power cables –Cable drawings required: 4 Only for unique power cables Taking advantage of similar cables Near-Term Tasks –Work out details of the terminal block interface –Begin cable drawings –Procure cable and terminal block interface parts

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 25 LAT TVAC Electrical Layout

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 26 Cable Layout – TVAC (1/3) Configuration –EGSE is located near port plates used by LAT –Cables are P2P or breakout into two connectors –Includes unregulated feed cables Unique Cable Requirements –Inside chamber cables and connector savers must be TVAC compatible –Inside chamber cables must be baked out prior to LAT TVAC

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 27 Cable Layout – TVAC (2/3) Interfaces –LAT interface SC-LAT interface connectors are per the SC-LAT ICD JL-39, JL-69, JL-264, JL-266 (test ports) are per LAT-DS ACD flyaway thermistor connector is TBD –TC terminal block interface is TBD –Chamber interface Copper paths –Feed thru’s: Glenair (61-pin circular) –Mating connector on cables: Amphenol MS3475L2461S Thermocouples –Feed thru’s: Deutsch DM PP (37-pin circular) –Mating connector on cables »Deutsch S-5020 (inside chamber) »Deutsch DS07-37S-081 (outside chamber) –BPU interface is per the SC-LAT ICD –VSC, external test point interface, external crate interfaces are SCSI except for the 1553 interface which is per the SC-LAT ICD –NRL Thermal Data Acquisition System interface is defined NRL is responsible for the thermocouple cables

GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 28 Cable Layout – TVAC (3/3) Statistics –Cable count: 72 –Drawings required: 36 Taking advantage of similar cables Near-Term Tasks –Finalize GSE heater power requirements –Procure long-lead items ASAP, i.e. chamber feed thru’s –Close loop with ACD thermistor interface and terminal block interface –Create wirelist –Determine cable lengths –Begin cable drawings –Procure cable parts i.e. wire, connectors, backshells, etc