Octopus F-MAN FM OPM OM Standards and Norms Environment MM Wagons F2 F1 F3 Contractual data Wagons owner F4 F5 F6 F9 F7 F8 F10 F11 F12.

Slides:



Advertisements
Similar presentations
Voice of the Customer ISR Danbury, CT Goodrich Corporation Internal Voice of the Customer - ISR v1 Objectives At the end of this discussion, you.
Advertisements

1 RXQ Customer Drop Submitted by Distribution Company Process Flow Diagram Customer Supplier Distribution Company 2 1 sends Drop Request to Supplier.
1 RXQ Customer Drop Submitted by Supplier Process Flow Diagram Customer Supplier Distribution Company Supplier sends Drop Request to Distribution.
1 RXQ Customer Drop Submitted by Distribution Company Process Flow Diagram Customer Supplier Distribution Company 2 1 sends Drop Request to Supplier.
1 Drop Submitted by Supplier Customer Supplier Distribution Company Supplier sends Drop Request to Distribution Company (??) Distribution Company receives.
UGDIE PROJECT MEETING Athens September WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered.
By: Hassan Waqar.  A PROTOCOL for securely transmitting data via the internet.  NETWORK LAYER application.  Developed by NETSCAPE.
United Nations Statistics Division Principles and concepts of classifications.
This program automatically books your Christmas Leave for 2006 Click Here Message from The Boss.
Chapter Chapter 13-2 Chapter 13 Data Modeling Introduction An Overview of Databases Steps in Creating a Database Using Rea Creating Database Tables.
Figure 6-1: Transport Request Data Entities: CS: Customer OM: Order manager OPM: Operational manager FM: Fleet Manager MM: Maintenance manager OBT: On.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
S A B D C T = 0 S gets message from above and sends messages to A, C and D S.
Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation.
ΑΝΝΕΧ 3 by SCIRO. Task 2.1 – Functional requirements definition Task 2.1 aims at drawing the functional analysis of F-MAN, starting from the users’ needs.
Kranjska Gora, Test plan - PI will test F-MAN tools on: - 2 types of wagons (Uacs, Himrrs) - 2 types of operation (timetable supervision.
1 SCIRO - Bled /09/02 WP2 Functional Requirements and Architecture External Functional Analysis (D4) & Internal Functional Analysis (contribution.
COMPARATIVE PRIVATE LAW FORMATION University of Oslo Prof. Giuditta Cordero Moss.
Construction Engineering 221 Contracts & Contractor Procurement.
Fiduciary Responsibilities How to handle difficult situations in your chapter? Marv Nelson SCTE SVP, Strategic Initiatives.
VAVLPVCTYMAUS PSABLADDERZSB EBSANTESHTICL RLDUDSKTTVSRA EDEARCENEAUOD CRFNORSASINTD TPEUUOCPTDATP UNRTMTRBEEXME MIEUSUULSNSNN USNMEMNISAIIT AESXSVPENNISI.
QPLNHTURBIOTS CADAIASOINCOS OSTPOSTLGVAGT AJRLFKLEROUEA CLARITYSOLSTB HTEAMVSRUVAHI INTERACTPELEL NAPKSOCIALIRI GSOCIOGRAMTST CONFORMITYYTY 14 WORDS ANSWERS.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Presentation by SNCF in 19/20 April 2004 Meeting in Kranjska.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Network Security Lecture 26 Presented by: Dr. Munam Ali Shah.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Fast Manager An Accounting application for sellers.
Type in the name of the disease Created by:. Description Type in your description of the disease here.
Transportation problems – The north-west corner method A manufacturer has 70 products at depot A, 30 at depot B and 40 at depot C. He has orders for 50.
Take 5 for Safety E. Lessard May 12, Arc Flash Event at INL Involving Situational Awareness Barrier  On April 15, 2015, Idaho National Lab workers.
Old Town Library Group Members Tatiana Ruiz Judith Webb Paul Salvo Phase two.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1. 2 One of the objectives of the CH was to eventually replace paper transmittals To do this we had to ensure that data going into the CH was of a high.
HIPAA Health Insurance Portability and Accountability Act.
Applicant sends request for username and password to; Applicant sends request for username and password.
1 Lecture 15: Chapter 19 Testing Object-Oriented Applications Slide Set to accompany Software Engineering: A Practitioner’s Approach, 7/e by Roger S. Pressman.
February 12, 2013 Alachua County Board of County Commissioners.
OPM-FIS Systems Access Support Team x4600.
WMTA MONTHLY MEETING MEXICAN CUSTOMS UPDATE APRIL 2012.
F-MAN Kranjska Gora, 19th - 20th April RIV CHANGES Most probably that with 1st of January 2005 the “old” RIV expires.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.
IT Brazil Application Architecture GI3 – Suggested SMS Architecture Overview V1.
The reading is 7.38 mm. The reading is 7.72 mm.
PLWG Review 6.9 and the Interconnection process
Requirements Engineering Process
Occupational Radiation Protection during High Exposure Operations
CB: #31_EN-DC_Data_VolRep
Topic - DATA PROVIDERS TRAINING COURSE Monitoring procedure
Treatment List: Case # { } {List treatment and tooth numbers}
INVOICE SUBMISSION PROCESS
INVOICE SUBMISSION PROCESS
Tips Need to Consider When Organizing a College Event
How to Update your Company’s Legal Name
How to register? Tutorial on HVDC-VSC Systems
Commitment & Social Norms
2012 סיכום מפגש 2 שלב המשכי תהליך חזוני-אסטרטגי של המועצה העליונה של הפיזיותרפיה בישראל.
Go to link above Create account Create a sign up
ماجستير إدارة المعارض من بريطانيا
Porting Process : Ireland
CREATING DISTRIBUTION IDS IN details Online
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Cost Difference Mechanically Harvesting Material 7500 per acre
Overview of Compliance, Surveillance, and Integrated Baseline Reviews
Communication as culture
12 Safe Maintenance Rules
Notice Production Desk Aid
Byzantine Generals Problem
Adding a Care Class (Categories are the second level of your organization’s offerings hierarchy: Program > Category > Class > Session) 1.) Enrichment tab.
Presentation transcript:

Octopus F-MAN FM OPM OM Standards and Norms Environment MM Wagons F2 F1 F3 Contractual data Wagons owner F4 F5 F6 F9 F7 F8 F10 F11 F12

Functions Description (1) F1: To provide the OM request of empty wagons to the FM. F2: To provide to the FM the wagons location, which satisfies the OM request considering information provided by the OPM and by the OBT. F3: To provide to the FM the OPM validation of transport feasibility of the empty wagons. F4: To transmit to the OM the FM confirmation concerning the request feasibility.

Functions Description (2) F5: To permit the FM to establish a hierarchy among empty wagons orders considering contractual data for a best treatment. F6: To transmit an order for sending of empty wagons from the FM toward the OPM. F7: To provide request modifications by the OM to the FM. F8: To take into account and inform the FM about event messages on rerouting data provided by the OPM and by the OBT.

Functions Description (3) F9: To transmit to the FM the consequences of the mismatch between the first request and the OM modifications. F10: To provide to the wagons owner and the MM with hints for preventive maintenance actions.F10: To provide to the wagons owner and the MM with hints for preventive maintenance actions. F11: To allow the FM and the MM to agree on wagon preventive maintenance planning. F12: To inform the FM, the OM, the wagons owner, the MM of the damage on wagons.F12: To inform the FM, the OM, the wagons owner, the MM of the damage on wagons.