© C.Hicks, University of Newcastle WAR/1 Knowledge Management in Capital Goods Companies Dr. Christian Hicks University of Newcastle upon Tyne.

Slides:



Advertisements
Similar presentations
MMM341/1 © Dr. C.Hicks, MMM Engineering University of Newcastle upon Tyne Supply Chain Management.
Advertisements

Introduction Project Management.
Technology Management Activities and Tools
By: MSMZ. Objective After completing this chapter, you will be able to: Explain 2 contract review stage List the objective of each stage of the contract.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
Project V Line Management
Improving health and social care outcomes for over 65s in Croydon: A new approach to commissioning integrated provision Governing Body 7 October 2014.
DPS 304 : Purchasing /Procurement Activities
Virtual University - Human Computer Interaction 1 © Imran Hussain | UMT Imran Hussain University of Management and Technology (UMT) Lecture 16 HCI PROCESS.
© C.Hicks, University of Newcastle IGLS04/1 Stochastic simulation of dispatching rules in the capital goods industry Dr Christian Hicks University of Newcastle.
Outsourcing – Managing for Success Stuart Payne, Morgan Chambers Copyright © 1999 Morgan Chambers plc Copyright © 1999 Morgan.
Chapter 5 Buying business services. Program The increasing importance of services Differences between goods and services A classification of services.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
The Outsourcing Process
CH/1 © Dr. Christian Hicks and Dr Tom McGovern An analysis of the impact of the restructuring of the UK civil nuclear industry on tier 1 and tier 2 suppliers.
© C.Hicks, University of Newcastle HIC288/1 A TOOL FOR OPTIMISING FACILITIES DESIGN FOR CAPITAL GOODS COMPANIES Christian Hicks
© C.Hicks, University of Newcastle IGLS02/1 A Genetic Algorithm Tool for Designing Manufacturing Facilities in the Capital Goods Industry Dr Christian.
IGLS04/1 Dr Tom McGovern and Dr Chris Hicks Specifications and Supplier Development in the UK Electrical Transmission and Distribution Equipment Industry.
© Chris Hicks, Tom McGovern and Paul Braiden, 29/3/2001 SPECS/1 The Management of Specifications in Engineer- to-Order Capital Goods Companies
E-commerce COM380 E-commerce Lecture 9 Change management.
© C.Hicks, University of Newcastle KNOW99/1 Knowledge Management in Capital Goods Companies Dr. Christian Hicks University of Newcastle upon Tyne.
© C.Hicks, University of Newcastle Manufacturing Systems Research Chris Hicks.
© C.Hicks, University of Newcastle HICKS/1 Research Overview Christian Hicks.
© C.Hicks / P.M.Braiden EDIN/1 Knowledge Management: An Engineering Perspective Dr. Christian Hicks Professor Paul Braiden University of Newcastle upon.
Stochastic Models in Planning Complex Engineer-To-Order Products
PG Conf /1 © F.A. Hossen, M&S Engineering University of Newcastle upon Tyne Managing Project Planning Risk Fouzi A. Hossen.
© C.Hicks, University of Newcastle IGLS06/1 Laissez-faire or full control? An evaluation of various control strategies for companies that produce complex.
ENBIS/1 © Chris Hicks University of Newcastle upon Tyne Stochastic simulation studies of dispatching rules for production scheduling in the capital goods.
© C.Hicks, University of Newcastle HICKS/1 Research Overview Christian Hicks
© C.Hicks, University of Newcastle C.F.Earl, Open University IDMME02/1 A Genetic Algorithm Tool for Designing Manufacturing Facilities in the Capital Goods.
Components of software quality assurance system overview
© C.Hicks, University of Newcastle ASAC06/1 Establishing the relationship between mean tardiness and the number of resources under close control for companies.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Integrated Process Model - v2
ERP Benefits.
Supplier Selection & Evaluation
Project Management An Overview John Mulhall MIICM; LIB International Credit & Process Management Professional.
Measles Partnership Meeting Yalda Momeni September 23 rd - WDC.
What is Business Analysis Planning & Monitoring?
SE513 Software Quality Assurance Lecture04: Contract Review Galin, SQA from Theory to Education Limited 2004.
SQA Architecture Software Quality By: MSMZ.
Slide 1 Outsourcing Part 2 - Evaluation & Management Section 1 – A Framework for Evaluation & Management A Framework for Evaluation & Management - An Introduction.
SCMN/Relationships Text: Supply Chain Management
Topic (1)Software Engineering (601321)1 Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution.
CHAPTER 3 Pre-Project Components. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser Learning Objectives: To discuss: Contract Review Development and Quality.
1 Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 7 Slide 1 Requirements Engineering Processes.
Object-Oriented Software Engineering Practical Software Development using UML and Java Chapter 1: Software and Software Engineering.
OBJECT ORIENTED SYSTEM ANALYSIS AND DESIGN. COURSE OUTLINE The world of the Information Systems Analyst Approaches to System Development The Analyst as.
© 2008 IBM Corporation Challenges for Infrastructure Outsourcing July 29, 2011 Atul Gupta Vice President, Strategic Outsourcing, IBM.
The views expressed in this presentation do not necessarily reflect those of the Federal Reserve Bank of New York or the Federal Reserve System Association.
Copyright  2007 McGraw-Hill Pty Ltd PPTs t/a Marketing Research 2e by Hair, Lukas, Bush and Ortinau Slides prepared by Judy Rex 1-1 Chapter One Overview.
Slide 1 of 24 Week 1: Lecture Structure Title: Managing IT –Business importance of IT –Role of CIO –Review the IS Pyramid –Top Business IT Issues –Discuss.
Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
21-22 May 2004IMPROQ 2004 / Impact of SW Processes on Quality Workshop 1 Quality for Components: Component and Component- Based Software Quality Issues.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Succession Planning Based loosely on “Effective Succession Planning in the Public Sector,” 2007, Watson Wyatt Worldwide Based loosely on “Effective Succession.
Chapter 16 Managing costs and quality
DEVELOPING NEW PRODUCTS AND SERVICES C HAPTER 10.
Multitude of source of errors - various style of source of errors will affect the SQA components * The environment in which software development & maintenance.
Dolly Dhamodiwala CEO, Business Beacon Management Consultants
MODELS OF STRATEGIC RESTRUCTURING OF COMPANIES AFTER GLOBALIZATION.
Chapter 1 Why Project Management? Chapter 1 Learning Objectives After completing this chapter, students will be able to: Understand why project.
Software Quality Assurance
Components of software quality assurance system overview
Components of software quality assurance system overview
Introduction Project Management.
In Information Management
Introduction Project Management.
Presentation transcript:

© C.Hicks, University of Newcastle WAR/1 Knowledge Management in Capital Goods Companies Dr. Christian Hicks University of Newcastle upon Tyne

© C.Hicks, University of Newcastle WAR/2 Capital Goods Companies Products and processes usually complex Customised to meet individual customer requirements Engineered-to-order Low volume, “lumpy”, erratic demand

© C.Hicks, University of Newcastle WAR/3 Classification of ETO Companies Product / project focus “Normal” / “Radical” design Established / ad-hoc business processes

© C.Hicks, University of Newcastle WAR/4 ETO Processes Physical / non-physical. Multistage - tendering, contract execution, operations, maintenance. All processes complex, interrelated and knowledge based. Processes dynamic and often reconfigured. General shift towards the outsourcing of physical activities.

© C.Hicks, University of Newcastle WAR/5 Methodology Analysis of business processes using Structured Systems Analysis and Design Methodology. Classification of knowledge Identification of KM issues

© C.Hicks, University of Newcastle WAR/6 Knowledge Classification Knowledge processing - generation, transfer, utilisation, identification, capture / retrieval, format, codification, assurance Domains - internal/ external, technical area, focus The part of the organisation’s performance affected by the knowledge management activity Formality - time and location dependency, MIS

© C.Hicks, University of Newcastle WAR/7 Case Study Design and contract company - no physical processes Product orientated company Mainly “normal” designs but some “radical” design activities Established processes

© C.Hicks, University of Newcastle WAR/8 Tendering Key process that had a large impact on project success / failure 75-80% of costs and delivery commitments made at the tendering stage Involves conceptual design and definition of major components and systems and suppliers. Includes performance and technical specifications, delivery schedules, price and commercial terms. Tendering normally carried out within severe time constraints with sparse knowledge and high uncertainty.

© C.Hicks, University of Newcastle WAR/9 Tendering Requires a detailed knowledge of –Customers / market / operations –Design / manufacturing / suppliers –Product / systems / subsystems –Costs / lead-times / capabilities / capacities Tacit knowledge, previous experience and company culture are key.

© C.Hicks, University of Newcastle WAR/10 Specific Conclusions Poor sharing of knowledge and information between multistage processes. No system for selecting ITTs worthy of response. Key knowledge of manufacture and operations gained prior to D&C strategy. Problem as older staff leave. Significant risk associated with supplier selection at the tendering stage. Poor reuse of knowledge across contracts.

© C.Hicks, University of Newcastle WAR/11 General Conclusions ETO companies are complex and dynamic organisations Interactions between wide range of processes that may be separated by a time lag. Formal processes have been modelled. Current research is focused upon identifying, classifying and documenting routines Objective is to identify improved KMA’s. The performance of the associated business processes will be compared.