CHAPTER 17: System Implementation

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

Chapter 15 System Implementation
14-1 © Prentice Hall, 2004 Chapter 14: OOSAD Implementation and Operation (Adapted) Object-Oriented Systems Analysis and Design Joey F. George, Dinesh.
14-1 © Prentice Hall, 2004 Chapter 14: OOSAD Implementation and Operation Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph.
Software Quality Assurance Plan
Chapter 14 Maintaining Information Systems Modern Systems Analysis and Design Seventh Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
© Prentice Hall CHAPTER 9 Application Development by Information Systems Professionals.
© 2005 by Prentice Hall Chapter 4 System Testing & Implementation Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph.
© 2005 by Prentice Hall Chapter 5 Maintaining Information Systems Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 17 System.
Fundamentals of Information Systems, Second Edition
System Implementation and Maintenance
Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Chapter 13 System Implementation Modern Systems Analysis and Design Seventh Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
7.2 System Development Life Cycle (SDLC)
Chapter 15 System Implementation Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Chapter 16 Maintaining Information Systems
Chapter 14 Maintaining Information Systems
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 18 Maintaining.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 10.1.
System Testing There are several steps in testing the system: –Function testing –Performance testing –Acceptance testing –Installation testing.
The Database Development Process
System Implementation. System Implementation and Seven major activities Coding Testing Installation Documentation Training Support Purpose To convert.
Software Testing & Implementation
System Implementation Modern Systems Analysis and Design.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 3 Slide 1 Chapter 15 System Implementation.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 17 System.
CCSB223/SAD/CHAPTER141 Chapter 14 Implementing and Maintaining the System.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
System Analysis and Design
Maintaining Information Systems Modern Systems Analysis and Design.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter 10 Systems Implementation.
14-1 © Prentice Hall, 2004 Chapter 14: OOSAD Implementation and Operation Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph.
Chapter 13 System Implementation
14-1 © Prentice Hall, 2004 Chapter 14: OOSAD Implementation and Operation Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 3 Slide 1 Chapter 16 Maintaining Information Systems.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 10 Systems Implementation and Operation 10.1.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 18 Maintaining.
Chapter 12 System Implementation
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter 10 Systems Implementation.
Construction, Testing, Documentation, and Installation Chapters 15 and 16 Info 361: Systems Analysis and Design.
System Implementation. © 2011 Pearson Education, Inc. Publishing as Prentice Hall 2 Chapter 13 FIGURE 13-1 Systems development life cycle with the implementation.
© 2005 by Prentice Hall Chapter 15 System Implementation Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
12-1 © Prentice Hall, 2007 Topic 12: Implementation and Operation OOAD Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph.
Unit 10 Implementation and Operation. Key Concepts Implementation deliverables Documentation Coding Reuse Testing Installation Training Support Factors.
Chapter 13 System Implementation Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Information System Analysis Implementation & Security.
CIS 210 Systems Analysis and Development Week 9 Part I Maintaining Information Systems,
Chapter 16 Maintaining Information Systems. Objectives:  Explain and contrast four types of system maintenance.  Describe factors affecting maintenance.
CIS 210 Systems Analysis and Development Week 9 Part I System Implementation,
Chapter 13 System Implementation
Chapter 14 Maintaining Information Systems
Chapter 18 Maintaining Information Systems
Unit 17 System Implementation
Chapter 18 Maintaining Information Systems
Chapter 17 System Implementation
IS442 Information Systems Engineering
Chapter 10 Systems Implementation and Operation
Chapter 10 Systems Implementation and Operation
CHAPTER 10 METHODOLOGIES FOR CUSTOM SOFTWARE DEVELOPMENT
Maintaining Information Systems (SAD- 18)
Chapter 16 Maintaining Information Systems
Chapter 10 Systems Implementation and Operation
Chapter 17 System Implementation
Chapter 18 Maintaining Information Systems
Presentation transcript:

CHAPTER 17: System Implementation MSIS 5653 Advanced Systems Development Dursun Delen, Ph.D. Department of Management Oklahoma State University CHAPTER 17: System Implementation 14.1

Learning Objectives Describe the process of coding, testing, installation and converting an organizational information system Discuss four installation strategies Direct Parallel Single location Phased installation Discuss the deliverables and outcomes for coding, testing and installation Describe the process of Documentation Distinguish between system and user documentation and determine which types of documentation are necessary for a given information system 17.2

Learning Objectives Compare the many modes available for organizational system training, including self-training and electronic performance support systems Discuss the types and issues of providing support to end users Discuss system implementation failure Compare the factor models and political models for the success of implementation processes Show how implementation issues apply to Internet-based systems via PVF case Discuss the project close-down 17.3

System Implementation in SDLC

System Implementation Purpose To convert final physical system specifications into working and reliable software products To document work that has been done To provide help for current and future users 17.5

The Process of Coding, Testing and Installation Physical design specifications are turned into working computer code Testing Tests are performed using various strategies Testing can be performed in parallel with coding Installation Process during which the current system is replaced by the new system 17.6

The Process of Coding, Testing and Installation 17.7

The Process of Documenting the System, Training and Supporting the Users Two audiences for documentation The information systems personnel who will maintain the system throughout its productive life The people who will use the system as part of their daily lives Deliverables Documentation System documentation User documentation User training plan Classes Tutorials User training modules Training materials Computer-based training aids User support plan Help desk On-line help Bulletin boards and other support mechanisms 17.8

Software Application Testing A test plan is developed during the analysis phase During the design phase, a unit test plan and a system test plan are developed The actual testing is done during implementation Test plans provide improved communication among all parties involved in testing Serve as checklists 17.9

Software Application Testing Types of Testing Inspection/Syntax Checking A testing technique in which participants examine program code for predictable language-specific errors Walkthrough A peer group review of any product created during the systems development process; also called a structured walkthrough 17.1010

Steps in Walkthrough

Software Application Testing Types of Testing Desk Checking A testing technique in which the program code is sequentially executed manually by the reviewer Unit Testing Each module is tested alone in an attempt to discover any errors in its code, also called module testing Integration Testing The process of bringing together all of the modules that a program comprises for testing purposes. Modules are typically integrated in a top-down, incremental fashion System Testing The bringing together of all the programs that a system comprises for testing purposes. Programs are typically integrated in a top-down, incremental fashion 17.12

Software Application Testing Types of Testing Stub Testing A technique used in testing, especially where modules are written and tested in a top-down fashion, where a few lines of code are used to substituted for subordinate modules 17.13

Software Application Testing The Testing Process The purpose of the testing is to confirm that the system satisfies requirements Testing must be planned Test Case A specific scenario of transactions, queries or navigation paths that represent a typical, critical or abnormal use of the system Test cases and results should be thoroughly documented so they can be repeated for each revision of an application Automated testing 17.14

Software Application Testing Combining Coding and Testing eXtreme Programming Coding and testing are intimately related parts of the same process Code is written, integrated into system and then tested Iterative process of testing, fixing bugs and re-testing Pair Programming “All coding is done by two people working together” Better communication between developers Higher level of productivity Higher quality of code 17.15

Software Application Testing Acceptance Testing by Users The process whereby actual users test a completed information system Alpha Testing User testing of a completed information system using simulated data Recovery testing Forces the software (or environment) to fail in order to verify that recovery is properly performed Security testing Verifies that protection mechanisms built into the system will protect it from improper penetration Stress testing Tries to break the system Performance testing Determines how the system performs on the range of possible environments in which it may be used 17.16

Software Application Testing Acceptance Testing by Users Beta Testing User testing of a completed information system using real data in the real user environment Intend is to determine whether the software, documentation, technical support, etc. work as intended Who does the beta testing? Why? 17.17

Installation The organizational process of changing over from the current information system to a new one Four approaches Direct Installation Changing over from the old information system to a new one by turning off the old system when the new one is turned on 17.18

Installation Four approaches (continued) Parallel Installation Running the old information system and the new one at the same time until management decides the old system can be turned off

Installation Four approaches (continued) Single location installation Trying out an information system at one site and using the experience to decide if and how the new system should be deployed throughout the organization 17.20

Installation Four approaches (continued) Phased Installation Changing from the old information system to the new one incrementally, starting with one or a few functional components and then gradually extending the installation to cover the whole new system 17.21

Planning Installation Considerations Data conversion Error correction Loading from current system Planned system shutdown Off hours Business cycle of organization Hardware and facility related activities should be planned, executed and completed before the software installation 17.22

Documenting The System Documentation System documentation User documentation Detailed information about a system’s design specifications, its internal workings and its functionality Internal documentation System documentation that is part of the program source code or is generated at compile time External documentation System documentation that includes the outcome of structured diagramming techniques such as data flow and entity-relationship diagrams 17.23

Documenting The System User Documentation Written or visual information about an application system, how it works, and how to use it Type of documentation Reference guide User’s guide Release description Systems admin’s guide Preparing documentation Traditional source has been IS department personnel 17.24

Documenting The System Traditional IS environment and its focus on documentation New IS environment and its focus on documentation 17.25

Training Information System Users $54 billion spent on training in 2000 in US Potential training topics Use of the specific information system General computer concepts (files, folders, etc.) Information system concepts (batch processing) Organizational concepts (inventory logic) System management (change request) System installation 17.26

Training Information System Users Training methods Resident expert Computer-aided instruction Formal courses Software help components Tutorials Interactive training manuals External sources: vendors Electronic performance support system (EPSS) Component of a software package or application in which training and educational information is embedded 17.27

Supporting Information System Users Support is extremely important to users J.D. Power and Associates survey found user support to be number one criterion contributing to user satisfaction with personal computing Most organizations provide support by two means Information center Help desk 17.28

Supporting Information System Users: Information Center An organizational unit whose mission is to support users in exploiting information technology Staff might perform the following tasks Install new hardware or software and set up user accounts Consult with users writing programs in fourth-generation languages Extract data from organizational databases onto personal computers Answer basic on-demand questions Provide a demonstration site for viewing hardware and software Work with users to submit system change requests 17.29

Supporting Information System Users Automating Support To cut the cost Types of automated support by vendors Knowledge bases and FAQ On-line support forums Bulletin board systems On-demand fax Voice-response systems Providing support via a help desk A single point of contact for all user inquiries and problems about a particular information system or for all users in a particular department 17.30

Why Implementation Sometimes Fails Conventional Wisdom: Two conditions necessary for a successful implementation Management support of the system under development Involvement of users in the development process 17.31

Why Implementation Sometimes Fails Factor Models: Ginzberg (1981)’s factor model Commitment to the project Commitment to change Extent of project definition and planning Realistic user expectations Lucas (1997)’s Model Extent to which system is used User’s satisfaction with actually using the system 17.32

Why Implementation Sometimes Fails Lucas model of implementation success Political models implementation success

Electronic Commerce Application: Pine Valley Furniture System implementation and operation of an Internet-based electronic commerce project is no different than other projects Develop test cases Simple functionality Multiple functionality Function chains Elective function Emergency/crisis Bug tracking and system evolution Alpha and beta testing the WebStore WebStore installation 17.34

Project Close Down Evaluate team Reassign members to other projects Notify all affected parties that the development project is ending and that you are switching to operation and maintenance mode Conduct post-project reviews Close out customer contract Formal signoff 17.35

Summary Process of coding, testing and converting an organizational information system Four installation strategies Direct, Parallel, Single location, and Phased installation Documentation (system and user) User training Providing support for end users Systems implementation failures Internet development Project Closedown 17.36

CHAPTER 18: Maintaining Information Systems

Learning Objectives Explain and contrast four types of maintenance Describe several factors that influence the cost of maintaining an information system Describe maintenance management issues including alternative organizational structures, quality measurement, processes for handling change requests and configuration management Explain the role of CASE when maintaining information systems 18.38

IS Maintenance in SDLC

IS Maintenance in SDLC

IS Maintenance in SDLC

The Process of Maintaining Information Systems Deliverables and Outcomes Development of a new version of the software and new versions of all design documents created or modified during the maintenance effort Maintenance? Changes made to a system to fix problems or enhance its functionality 18.42

Types of Maintenance Corrective maintenance Adaptive maintenance Changes made to a system to repair flaws in its design, coding, or implementation Adaptive maintenance Changes made to a system to evolve its functionality to changing business needs or technologies Perfective maintenance Changes made to a system to add new features or to improve performance Preventive maintenance Changes made to a system to avoid possible future problems 18.43

Types of Maintenance 18.44

The Cost of Maintenance Many organizations allocate as much as eighty percent of information systems budget to maintenance 18.45

The Cost of Maintenance Factors that influence system maintainability Number of defects Number of customers Quality documentation Maintenance personnel Tools Well-structured programs 18.46

Conducting System Maintenance Managing Maintenance Number of people working in maintenance has surpassed the number working in development: Three possible maintenance organizational structures Separate Maintenance group consists of different personnel than development group Combined Developers also maintain systems Functional Maintenance personnel work within the functional unit 18.47

Conducting System Maintenance Managing Maintenance What are the advantages and disadvantages of different maintenance organizational structures Separate / Combined / Functional Assignment of personnel Maintenance work is often viewed negatively by IS personnel Organizations have historically have rewarded people involved in new development better than maintenance personnel Organizations often rotate personnel in and out of maintenance roles in order to lessen negative feelings about maintenance 18.48

Conducting System Maintenance Measures of Effectiveness Number of failures Time between each failure Type of failure Mean time between failures (MTBF) A measurement of error occurrences that can be tracked over time to indicate the quality of a system 18.49

Controlling Maintenance Requests 18.50

Configuration Management The process of assuring that only authorized changes are made to the system Baseline modules Software modules that have been tested, documented, and approved to be included in the most recently created version of a system System librarian A person responsible for controlling the checking out and checking in of baseline modules when a system is being developed or maintained Build routines Guidelines that list the instructions to construct an executable system from the baseline source code 18.51

Movement of a maintenance request through an organization

Role of CASE and Automated Development Tools in Maintenance Development with CASE Emphasis is on design documents Changes are implemented in design documents. Code is regenerated using code generators Documentation is updated during maintenance Traditional systems development Emphasis on coding and testing Changes are implemented by coding and testing first Documentation is done after maintenance is performed Keeping documentation current is often neglected due to time-consuming nature of task 18.53

Website Maintenance Special considerations 24 X 7 X 365 Check for broken links HTML Validation Pages should be processed by a code validation routine before publication Re-registration When content significantly changes, site may need to be re-registered with search engines Future Editions Consistency is important to users Post indications of future changes to the site Batch changes 18.54

Summary Maintenance Cost of maintenance Managing Maintenance Corrective / Adaptive / Perfective / Preventive Cost of maintenance Managing Maintenance Measuring effectiveness of maintenance Controlling maintenance requests Configuration management Role of CASE and Automated Development Tools in Maintenance Website Maintenance 18.55