September 9, 2002David Rubin/ Cornell 1 UCLC Briefing UCLC Briefing to the US LC SG Accelerator Review Committee September 9, 2002 David Rubin Cornell.

Slides:



Advertisements
Similar presentations
10/23/07RTML EDR Oct GDE1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
What’s up at SLAC Linear Collider R&D organization Tom Himel SLAC Linear Collider Consortium Organizational Meeting Cornell April 19, 2002.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
Jim Alexander - April 19th - UCLC First Meeting of the University Consortium for the Linear Collider... “UCLC” Goals of this Meeting April 19th, 2002 Cornell.
UCLC Meeting UCLC Raison d’etre Steps to proposal (Oct 15 submission) Plans for Today Ritchie Patterson June 30, 2002.
Office of Science U.S. Department of Energy Presentation to the American Linear Collider Workshop Cornell University July 13 – 16, 2003 Jim Reidy July.
R&D Perspectives, Jim Brau, Santa Cruz, June 28, Jim Brau Univ. of Oregon Santa Cruz Linear Collider Retreat June 28, 2002 R&D Perspectives R&D.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
June 29, 2002David Finley to LC Retreat / Santa Cruz CASlide 1 Summary of Accelerator R&D David Finley / Fermilab Linear Collider Retreat / Santa Cruz.
NLC - The Next Linear Collider Project Sheppard/Pitthan June 26, 2015 Towards an Undulator Based NLC Positron Source Towards an Undulator Based NLC Positron.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
NLC - The Next Linear Collider Project Sheppard/Pitthan July 14, 2015 POWER Meeting June 8=9,2002 Durham, England POWER Meeting June 8=9,2002 Durham, England.
Technology Breakthroughs and International Linear Collider Barry Barish AAAS Annual Meeting Washington DC 19-Feb-05.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
ALCW at SLAC, January 7, 2004J. Rogers, A Damping Ring Primer1 A Damping Ring Primer J. Rogers Cornell University Linear collider emittance requirements.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Fermilab User’s Meeting June 11, 2002 University Accelerator Research and Fermilab (Ongoing Projects and Opportunities for getting started)
Damping Rings and Sources Summary- Cornell ALCPG meeting, July George Gollin, Univ. Illinois, 7/16/03 1 Damping Rings and Sources Summary Cornell.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
CARE Governing Board R. Aleksan CARE Governing Board Meeting, November 25, Introduction et objectives.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
University Participation in NLC R&D Tom Himel SLAC NLC MAC review May 9, 2002.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
November 18, 2011David L. Rubin1 CESR Test Accelerator – Investigation of the physics of charged particle beams Circumference = 768m - Beam energy
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
The Engineering Test Facility for nLC
Mark Palmer for the CESRTA Collaboration
J. Alexander + Cornell accelerator group Cornell University
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
New algorithms for tuning the CLIC beam delivery system
Auxiliary Positron Source
Beam-beam effects in eRHIC and MeRHIC
End Station Test Beam (ESTB) at SLAC
Beam Simulation at Cornell
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
INFN and the ILC S. Bertolucci, INFN.
CTA 09 - Introduction David Rubin Cornell Laboratory for
Summary of Washington DOE Review
Update on MEIC Ion Polarization Work
Current Status for Ion Polarization Studies
Status of IR / Nonlinear Dynamics Studies
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Current Status of Ion Polarization Studies
Presentation transcript:

September 9, 2002David Rubin/ Cornell 1 UCLC Briefing UCLC Briefing to the US LC SG Accelerator Review Committee September 9, 2002 David Rubin Cornell

September 9, 2002David Rubin/ Cornell 2 Motivation for UCLC In the wake of the endorsement of the linear collider - both nationally and internationally, But with as yet relatively little participation by universities, The UCLC was formed to help university groups engage in linear collider R&D both accelerator and detector

September 9, 2002David Rubin/ Cornell 3 UCLC History January Chicago Linear Collider meeting Jim Alexander announces the formation of a consortium of university groups interested in linear collider R&D The consortium would submit a joint proposal to the NSF Enthusiastic response lead to the creation of a mailing list of interested groups LCCOM - April 19 at Cornell (Linear Collider Consortium Organizational Meeting) to identify participants and areas of interest and to help newcomers identify specific projects (parallel LCRD meetings at FNAL and SLAC)

September 9, 2002David Rubin/ Cornell 4 UCLC History - continued LCCOM2 - June 30 at Santa Cruz participants present preliminary R&D plans create a schedule (driven by NSF proposal deadline) Coordinate with LCRD and USLCSG a common timeline leading to this review August 1 - draft project descriptions are received August - Friendly joint review of all UCLC and LCRD proposals ALCPG -> Detector proposals Himel,Finley,Rogers panel -> machine proposals Refine and update UCLC project descriptions and then combine with LCRD EOI’s to produce A University Program of Accelerator and Detector Research for the Linear Collider

September 9, 2002David Rubin/ Cornell 5 UCLC Tallies Num. of Accelerator Projects14 Num. of Detector Projects17 Total Projects31 Num. of Groups*37 Num. of Institutions20 * Num of Groups = Projects x Institutions/project

September 9, 2002David Rubin/ Cornell 6 Linear Collider Accelerator R&D Two distinct technologies developed at large laboratories - warm x-band and cold L-band Tantalizingly close to a real design But in view of the high energy and very high luminosity required, much work remains to be done including The 38 proposals (UCLC + LCRD) Based on interests and resources of university groups and guided by suggestions from the labs

September 9, 2002David Rubin/ Cornell 7 Proposed R&D 8 Categories Beam dynamics - simulations - 8 Sources - 3 RF technology - 7 Magnet and kicker technology - 4 Ground motion and vibrations suppression and compensation - 2 Instrumentation and electronics - 9 Control system - 3 Non e + e - collisions - 1

September 9, 2002David Rubin/ Cornell 8 Beam Simulations and Calculations High luminosity requires production and preservation of very low emittance beams Simulation is the principle tool for evaluating effects of space charge, intrabeam scattering, electron clouds, nonlinearities, magnet and waveguide misalignment, production and transport of beam tails, etc. Simulation guides and lends credibility to design choices Establishes requirements and effectiveness of beam instrumentation Procedures for beam based correction of guide field errors and commissioning

September 9, 2002David Rubin/ Cornell 9 Electron and Positron Source Technology Low emittance, polarized, flat beams of closely space bunches Temporal structure of bunched beam is very different for TESLA and NLC Production of polarized positron beam requires helical undulator radiation

September 9, 2002David Rubin/ Cornell 10 Instrumentation and Electronics Preservation of low emittance depends on precise and flexible instrumentation for measuring beam size. Existing designs are inadequate High resolution beam position monitors Beam size and beam orientation monitors Requirements of IR BPM very different than main linac BPM Bunch length monitors Practical designs must be rad hard, inexpensive, serviceable

September 9, 2002David Rubin/ Cornell 11 Control Systems Global accelerator network Management of large quantity of diagnostic data Flexibility to accommodate efficient commissioning and optimization of performance during operation

September 9, 2002David Rubin/ Cornell 12 UCLC Review process NSF will conduct its own review of UCLC proposal The proposal submitted to NSF is limited to 15 pages - so it cannot include the detail before you today and it will be reviewed as one UCLC will use the US LC SG Review as basis for adjusting project budgets So that requests are closer to NSF targets UCLC will submit proposal to NSF mid October

September 9, 2002David Rubin/ Cornell 13 UCLC Budget Summary FY03FY04FY05Total Accelerator Requests6391,1221,0532,813 Detector Requests7251,5002,0444,268 Total Requests1,3632,6223,0977,081 Budget target1,0002,0003,0006,000 Amounts are in thousands of dollars

September 9, 2002David Rubin/ Cornell 14 UCLC Organization Project manager - Gerry Dugan Research Coordinators - Accelerator - Joe Rogers & Jesse Ernst Machine detector interface - Dave Cinabro Vertexing - Pat Skubic, Homer Neal Tracking - Keith Riles Calorimetry - Dhiman Chakraborty

September 9, 2002David Rubin/ Cornell 15 Summary The 38 accelerator projects that have been proposed represent an important contribution to the linear collider R&D The participation of 29 institutions in the UCLC and LCRD indicate a strong interest within the physics community in the success of the linear collider Opportunity to educate students in the accelerator physics of the collider Develop pool of talent on which design, construction, commissioning and operation of the linear collider will ultimately depend.