Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO 80309-0419.

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

Chapter 13 Project Scheduling: PERT/CPM
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
PROJECT MANAGEMENT. Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 1 Slide © 2005 Thomson/South-Western Q 5 – 13 x 1 = the probability that Station A will take Sitcom Rerun x 2 = the probability that Station A will take.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
MGMT 483 Week 8 Scheduling.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Managing Projects. Project Management Questions zWhat activities are required to complete a project and in what sequence? zWhen should each activity be.
1 Operations Management Lesson 5 Project Management.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Project Management Techniques.
BA 333 Operations Management
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
4.1 Dr. Honghui Deng Associate Professor MIS Department UNLV MIS 746 IS Project Management.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Project Management © Wiley 2007.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Project Management Chapter 13 OPS 370. Projects Project Management Five Phases 1. Initiation 2. Planning 3. Execution 4. Control 5. Closure.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Managing Project Processes Managing Project Processes.
Network Planning Methods Example PERT & CPM
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Project Management (專案管理)
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
The Nature of Project Management zCharacteristics of Projects: purpose, life cycle, interdependencies, uniqueness, and conflict. zProject Management Process:
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Welcome to MM305 Unit 7 Seminar Dr. Bob Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Operations Management Project Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Project Planning, Scheduling and Control Planning: –defines objectives, tasks and preceeding relationships; estimates time and resources Scheduling: –identifies.
Chapter 16 – Project Management
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
PROJECT MANAGEMENT WITH CPM/PERT.
Project Planning and Budgeting
Probabilistic Time Estimates
Chapter 16 – Project Management
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Presentation transcript:

Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO

2 Project Management Management complex projects Many parallel tasks Deadlines and milestones must be met Difficult to know “what to do first” Difficult to know when project is in trouble Often have competition for limited resources When to use:

3 Examples Building a new airport Designing a new computer product Launching an advertising campaign Construction projects of all types Maintenance projects Curriculum reviews

4 Project Mgmt Techniques Critical Path Method (CPM) Developed by DuPont (1950’s) Plan and control maintenance of chemical plants Credited with reducing length of maintenance shutdown by 40% Project Evaluation and Review Technique (PERT) Developed by Navy (early 1960’s) Plan and control the Polaris missile project Credited with speeding up project by 2 years

Critical Path Method (CPM)

6 Graphical method of portraying relationship of project activities An activity is any discrete part or task of a project which takes resources and time to complete Activities exhibit precedence relations (some must be completed before others can start) Activities with their precedence relations form a project network Critical Path Method finds the longest path through the resulting project network

7 Precedence Relations ActivityImmediate PredecessorDuration (days) A(Start)BACADB, C

8 Simple Project Network A A B B C C D D

9 Activity Start/Finish Times ES LS EF LF Activity Name Activity Duration Early Finish Time Late Finish Time Early Start Time Late Start Time

10 Finding the Critical Path A D C B

11 CPM Terminology Critical Path: the chain of activities along which the delay of any activity will delay the project Early Start Time (ES): the earliest that an activity could possibly start, given precedence relations Late Start Time (LS): the latest that an activity could possibly start without delaying the project Early Finish Time (EF): the earliest that an activity could possibly finish Late Finish Time (LF): the latest that an activity could possibly finish without delaying the project Activity Slack: the amount of “play” in the timing of the activity; slack = LST-EST = LFT-EFT

12 Example Suppose you are an advertising manager responsible for the launch of a new media advertising campaign. The campaign (project) has the following activities: ActivityPredecessors Time A. Media bids none2 wks B. Ad concept none6 C. Pilot layouts B3 D. Select media A8 E. Client check-off A,C6 F. Pre-production B8 G. Final production E,F5 H. Launch campaign D,G0

13 Example Project Network A2A2 A2A2 B6B6 B6B6 F8F8 F8F8 D8D8 D8D8 C3C3 C3C3 E6E6 E6E6 G5G5 G5G5 H0H0 H0H0 Start

Program Evaluation and Review Technique (PERT)

15 PERT Similar to Critical Path Method (CPM) Accounts for uncertainty in activity duration estimates Provides estimates of project duration probabilities Best used for highly uncertain projects new product development unique or first-time projects research and development

16 Simple Project Network A A B B C C D D

17 A Simple Example Most Optimistic Most Likely Most Pessimistic Activity 210A 17B 46C D mab

18 Distribution Assumption Assume a “Beta” distribution activity duration density mab

19 Expected Duration & Variance Expected Time = Variance = a + 4m + b 6 (b - a) 2 36 For the Beta Distribution:

20 Distribution Assumption activity duration density mab expected duration

21 Expected Duration & Variance ET = Var = a + 4m + b 6 (b - a) 2 36 = 2+4(3)+10 6 = 4.0 = (10-2) 2 36 = Activity A

22 Critical Path of the Example A D C B Critical Path Duration =

23 Time and Variance Example Expected Time Variance Critical Path? Activity A 31.0B C D

24 Probability of Completion What is the probability that a project will be completed by a specified due date? Due Date - Expected Completion Date Sum of the Variances on the Critical Path z =z = Normal Distribution z Due Date Expected Completion

25 Completion Probability Example What is the probability of completing the project within 12 days? z = = From a Z-table for standard Normal distributions: Probability of completion =

26 Larger Example (a) (m) (b) Activity Preds Optimistic Likely Pessimistic A. none wks B. none 4 68 C. B D. A E. A,C 3 69 F. B G. E,F H. D,G 0 00 Suppose the duration of the activities of the ad campaign are, in fact, uncertain:

27 Activity D Suppose the duration of the activities of the ad campaign are, in fact, uncertain: (a) (m) (b) Activity Preds Optimistic Likely Pessimistic A. none wks B. none 4 68 C. B D. A E. A,C 3 69 F. B G. E,F H. D,G 0 00

28 Activity D Variance of Activity Duration for “D”: Var = (b - a) 2 36 = (10-2) 2 36 Expected Activity Duration for “D”: ET = a + 4m + b 6 = 2+4(8)+10 6

29 Example Project Network A2A2 A2A2 B6B6 B6B6 F8F8 F8F8 D D C3C3 C3C3 E6E6 E6E6 G5G5 G5G5 H0H0 H0H0 Start Critical Path Duration = 20 days 7.33

30 Project Duration Statistics A B C E F G H Activity Critical? Mean Var C.P. Var D

31 Using Project Statistics What is the probability that the ad campaign can be completed in 18 weeks? 20? 24? 18 weeks: Z = x -   sqrt(1.55) = Prob(x<18) = = Corresponding probability from standard normal Z-Table is :

32 Using Project Statistics What is the probability that the ad campaign can be completed in 18 weeks? 20? 24? 18 weeks: Z =-1.61Prob(x<18) = 20 weeks: Z =0.00Prob(x<20) = 24 weeks: Z =3.21Prob(x<24) =

33 Other Project Mgmt Techniques Project crashing where to devote extra resources to reduce activity/project durations while minimizing costs Resource leveling how to schedule resources (equipment, people) to minimizes peaks and valleys Multiple resource scheduling how to schedule resources when activities can require more than one resource type Cash flow and budgeting combine cash and budget information with project scheduling to track expenditures, project cash flows