S12-1 1. Inventory Management - 60 Min 2. JIT - 30 Min 3. Case Discussion - 30 Min 4. “Final” Problems - 60 Min Agenda:

Slides:



Advertisements
Similar presentations
Operations Management Inventory Management Chapter 12
Advertisements

Inventory Control Chapter 17 2.
12 Inventory Management.
12 Inventory Management PowerPresentation® prepared by
Operations Management
12 Inventory Management PowerPoint presentation to accompany
Inventory models Nur Aini Masruroh. Outline  Introduction  Deterministic model  Probabilistic model.
Operations Management
Chapter 9 Inventory Management.
12-1 Operations Management Inventory Management Chapter 14.
JIT, TPS, and Lean Operations
Material Productivity By T. A. Khan January 2008.
Inventory Management. Introduction What: Managing Inventory Where: Any business that maintains inventory Why: Inventory is a significant contributor to.
Operations Management Inventory Management
Just-in-Time and Lean Systems
12-1 Operations Management Inventory Management Chapter 12 - Part I.
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
Operations Management Inventory Management Chapter 12 - Part 2
© 2006 Prentice Hall, Inc.16 – 1 Operations Management Just-in-Time and Lean Production Systems Just-in-Time and Lean Production Systems © 2006 Prentice.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 12 Inventory Management.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
1 Operations Management Inventory Management. 2 The Functions of Inventory To have a stock of goods that will provide a “selection” for customers To take.
1 1 Slide Just-in-Time and Lean Production Systems Professor Ahmadi.
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
13 Inventory Management.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PRODUCTION AND OPERATIONS MANAGEMENT
Inventory Modeling for Independent Demand
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
CHAPTER Inventory Management.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
Just-in-Time and Lean Production Systems
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S12-1 Operations.
Just-In-Time & Lean Systems
13-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
12 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Importance of Inventory One of the most expensive assets of many companies Can be 50%
CHAPTER Inventory Management McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill.
Just-in-Time and Lean Systems
Inventory Stock of items held to meet future demand
MGT 563 OPERATIONS STRATEGIES Dr. Aneel SALMAN Department of Management Sciences COMSATS Institute of Information Technology, Islamabad.
Inventory Management. Learning Objectives  Define the term inventory and list the major reasons for holding inventories; and list the main requirements.
Chapter 12 : Inventory Management Outline  The Importance of Inventory  Functions of Inventory  Types of Inventory.
Inventory Stock of items held to meet future demand Inventory management answers two questions How much to order When to order.
13Inventory Management. 13Inventory Management Types of Inventories Raw materials & purchased parts Partially completed goods called work in progress.
13 Just-In-Time Production Management philosophy Pull system though the plant WHAT IT IS Employee participation Industrial engineering/basics Continuing.
1 1 Slide Inventory Management Professor Ahmadi. 2 2 Slide The Functions of Inventory n To ”decouple” or separate various parts of the production process.
Inventory Management.
12-1 Managing Inventory and and Supply Chain Chapters 12 & 11.
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Purposes of Inventory 1. To maintain independence of operations. 2. To meet variation in product demand. 3. To allow flexibility in production scheduling.
Inventory Control. Meaning Of Inventory Control Inventory control is a system devise and adopted for controlling investment in inventory. It involve inventory.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Best Performing Consulting Organization by “JIT & Lean Manufacturing” Adding Value In Totality !!
16 - 1© 2011 Pearson Education 16 JIT, Lean Operations, and the Toyota Production System PowerPoint presentation to accompany Heizer and Render Operations.
12-1 Operations Management Inventory Management Chapter 12 - Part I.
PENGENDALIAN PERSEDIAAN (Bagian 2)
Inventory Stock of items held to meet future demand
Slide 16.1 Just-In-Time & Waste Reduction. Slide 14.2 What is Just-in-Time?   Management philosophy of continuous and forced problem solving  are needed.
Module 2: Supply Chain & Logistics Management
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: what levels should be maintained when.
Operations Management
Chapter 12 Just-in-Time and Lean Systems
DPT 335 PRODUCTION PLANNING & CONTROL
Inventory Stock of items held to meet future demand
Presentation transcript:

S Inventory Management - 60 Min 2. JIT - 30 Min 3. Case Discussion - 30 Min 4. “Final” Problems - 60 Min Agenda:

S12-2  Types of Inventory  Raw material  Work-in-progress  Maintenance/repair/operating supply  Finished goods What is Inventory? Functions of inventory?

S12-3 The Functions of Inventory  To protect against lost sales - stock-outs  To ”decouple” or separate various parts of the production process  To provide a stock of goods that will provide a “selection” for customers  To take advantage of quantity discounts  To hedge against inflation and upward price changes

S12-4  Divides on-hand inventory into 3 classes  A class, B class, C class  Basis is usually annual $ volume  $ volume = Annual demand x Unit cost  Policies based on ABC analysis  Develop class A suppliers more  Give tighter physical control of A items  Forecast A items more carefully ABC Analysis

S % of Inventory Items % Annual $ Usage A B C Class% $ Vol% Items A8015 B 30 C555 Classifying Items as ABC

S12-6 Inventory Costs  Holding costs  Holding costs - associated with holding or “carrying” inventory over time  Ordering costs  Ordering costs - associated with costs of placing order and receiving goods  Setup costs  Setup costs - cost to prepare a machine or process for manufacturing an order  Excess at EOL  Excess at EOL - mark down, scrap  Stock-out costs  Stock-out costs - a negative cost of inventory.

S12-7  Fixed order-quantity models  Economic order quantity  Production order quantity  Quantity discount  Probabilistic models  Fixed order-period models Inventory Models

S12-8 Order Quantity Annual Cost Holding Cost Curve Total Cost Curve Order (Setup) Cost Curve Optimal Order Quantity (Q*) EOQ Model How Much to Order?

S12-9 Optimal Order Quantity Expected Number of Orders Expected Time Between Orders Working Days/Year Working Days/Year == ×× == == = =× Q* DS H N D Q*Q* T N d D ROPdL 2 D = Demand per year S = Setup (order) cost per order H = Holding (carrying) cost d = Demand per day L = Lead time in days EOQ Model Equations

S12-10 EOQ Model When To Order Reorder Point (ROP) Time Inventory Level Average Inventory (Q*/2) Lead Time Optimal Order Quantity (Q*)

S12-11  Answers how much to order and when to order  Allows partial receipt of material  Other EOQ assumptions apply  Suited for production environment  Material produced, used immediately  Provides production lot size  Lower holding cost than EOQ model Production Order Quantity Model

S12-12 POQ Model Inventory Levels Inventory Leve l Time Supply Begins Supply Ends Production portion of cycle Demand portion of cycle with no supply

S12-13 POQ Model Inventory Levels Time Inventory Level Production Portion of Cycle Max. Inventory Q·(1- d/p) Q* Supply Begins Supply Ends Inventory level with no demand Demand portion of cycle with no supply

S12-14 D = Demand per year S = Setup cost H = Holding cost d = Demand per day p = Production per day POQ Model Equations Optimal Order Quantity Setup Cost Holding Cost == - = * = * = Q H* d p Q D Q S p * 1 ( 0.5 * H * Q - d p 1 ) - d p 1 () 2*D*S () Maximum inventory level

S12-15  Answers how much to order & when to order  Allows quantity discounts  Reduced price when item is purchased in larger quantities  Other EOQ assumptions apply  Trade-off is between lower price & increased holding cost Quantity Discount Model

S12-16 Quantity Discount Model Total cost = Setup cost + Holding cost + product cost TC = (D/Q)(S) + (QH)/2 + PD D = Annual Demand Q = Order Quantity S = Set or order cost H = Holding cost P = Price

S12-17 Quantity Discount Model TC = (D/Q)(S) + (QH)/2 + PD

S12-18  Answer how much & when to order  Considers Stock-out Costs  Allow demand to vary  Follows normal distribution  Other EOQ assumptions apply  Consider service level & safety stock  Service level = 1 - Probability of stockout  Higher service level means more safety stock  More safety stock means higher ROP Probabilistic Models

S12-19 Probabilistic Model Example 1. Stock out = 10(.2)($40)6 + 20(.1)($40)(6) = $ Stock out = 10(.1)($40)6 = $

S12-20  Answers how much to order  Orders placed at fixed intervals  Inventory brought up to target amount  Amount ordered varies  No continuous inventory count  Possibility of stockout between intervals  Useful when vendors visit routinely  Example: P&G representative calls every 2 weeks Fixed Period Model

S12-21 Time Inventory Level Target maximum PeriodPeriodPeriod Fixed Period Model When to Order?

S12-22 Waste is ‘anything other than the minimum amount of equipment, materials, parts, space, and worker’s time, which are absolutely essential to add value to the product.’ — Shoichiro Toyoda President, Toyota Introductory Quotation

S12-23  Management philosophy of continuous and forced problem solving  Supplies and components are ‘pulled’ through system to arrive where they are needed when they are needed.  JIT:  Attacks waste  Anything not adding value to the product ( From the customer’s perspective)  Exposes problems and bottlenecks caused by variability  Achieves streamlined production What is Just-in-Time?

S12-24  Overproduction  Waiting  Transportation  Inefficient processing  Inventory  Unnecessary motion  Product defects Types of Waste

S12-25 Push versus Pull  Push system: material is pushed into downstream workstations regardless of whether resources are available  Pull system: material is pulled to a workstation just as it is needed

S12-26 Results  Queue and delay reduction, speeds throughput, frees assets, and wins orders  Quality improvement, reduces waste and wins orders  Cost reductions, increases margin or reduces selling price  Variability reductions in the workplace, reduces waste and wins orders  Rework reduction, reduces waste and wins orders

S12-27  Incoming material and finished goods involve waste  Buyer and supplier form JIT partnerships  JIT partnerships eliminate  Unnecessary activities  In-plant inventory  In-transit inventory  Poor suppliers Suppliers

S12-28  Few  Nearby  Repeat business  Analysis to enable desirable suppliers to become or stay price competitive  Competitive bidding mostly limited to new purchases  Suppliers encouraged to extend JIT to their suppliers Characteristics of JIT Partnerships Suppliers

S12-29 Characteristics of JIT Partnerships Quantities  Steady output rate  Frequent deliveries in small-lot quantities  Long term contract agreements  Minimal paperwork  Delivery quantities fixed for whole contract term  Little or no permissible overage or underage  Suppliers package in exact quantities  Suppliers reduce their production lot sizes or store unreleased material

S12-30  Help suppliers to meet quality requirements  Close relationship between buyers’ and suppliers quality assurance people Characteristics of JIT Partnerships Quality

S12-31 Characteristics of JIT Partnerships Shipping  Scheduling of inbound freight  Gain control by use of company-owned or contract shipping and warehousing

S12-32 Goals of JIT partnerships ¬ Elimination of unnecessary activities · Elimination (reduction) of in-plant inventory ® Elimination (reduction) of in-transit inventory Í Elimination of poor suppliers

S12-33  JIT objective: Reduce movement of people and material  Movement is waste!  JIT requires  Work cells for product families  Moveable or changeable machines  Short distances  Little space for inventory  Delivery directly to work areas Layout

S12-34 Process LayoutWork Cell Saw Lathe Grinder Heat Treat Lathe Lathe Saw Heat Treat Grinder Grinder Press Press Saw Press Work Cell versus Process Layout

S12-35  Traditional: inventory exists in case problems arise  JIT objective: Eliminate inventory  JIT requires  Small lot sizes  Low setup time  Containers for fixed number of parts  JIT inventory: Minimum inventory to keep system running Inventory

S12-36 JIT Scheduling Tactics  Communicate the schedule to suppliers  Make level schedules  Freeze part of the schedule  Perform to schedule  Seek one-piece-make and one-piece-move  Eliminate waste  Produce in small lots  Use kanbans  Make each operation produce a perfect part

S12-37  Japanese word for card  Pronounced ‘kahn-bahn’ (not ‘can-ban’)  Authorizes production from downstream operations  ‘Pulls’ material through plant  May be a card, flag, verbal signal etc.  Used often with fixed-size containers  Add or remove containers to change production rate Kanban

S12-38  All activities involved in keeping equipment in working order  Done to prevent failure  JIT requires  Scheduled & daily PM  Operator performs PM  Knows machines  Responsible for product quality Preventive Maintenance (PM)

S12-39 Milling Painting Rivet Battens Insert Studs Mount Hinges Glue App. Final Assem. Tent Plywood Stock F/R Stock Rear & Front Assembly Flow B - 2,500 B - 1,500 B B - 1,500 B - 1,000