Zachary Wolf LCLS Undulator October 30, 2007 1 LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.

Slides:



Advertisements
Similar presentations
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Advertisements

Alexander Temnykh Cornell University, Ithaca NY, USA
Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
October 21, 2005 Internal LCLS Undulator Alignment and Motion Review Georg Gassner, SLAC / MET 1 HLS Monitoring System Georg.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf Undulator Bench October 14, Undulator Bench Requirements Zack Wolf SLAC.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
COBRA Magnet Status W. Ootani June 27th, 2006 MEG Review W. Ootani June 27th, 2006 MEG Review.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
10/2007 M.Taborelli, TS-MME M.Taborelli Structure fabrication: dimensional tolerances Contributions of : G.Arnau-Izquierdo, A.Cherif, D.Glaude, R.Leuxe,
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Magnetic Measurements At SLAC
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
In Vacuum Magnetic Field Measurement System for CPMU of HEPS-TF
High Precision Stretched Wire Bench
Magnetic Measurements For The LCLS Undulator System
LCLS Undulator Fiducialization
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Phase Adjustments: K vs
High Precision Magnet Production for NSLSII at IHEP
Beam-Based Alignment Results
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Undulator Tuning Status
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator Tuning And Fiducialization
Undulator Alignment Plan
LCLS Undulator Magnetic Measurements
Presentation transcript:

Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave Jensen, Scott Anderson

Zachary Wolf LCLS Undulator October 30, Progress Since Last FAC Progress We have 15 undulators tuned and fiducialized. The MMF temperature control is working well. The reference undulator measurements repeat within spec. The Hall probe calibrations are stable. The Hall probe reference magnet measurements are stable. A study of the stainless steel beam pipe and steel support was made. A study of undulator mounting effects is under way. The undulator quadrupole fiducialization system was commissioned. Challenges Now we need to set K to a specified value. Can’t re-assign slot number. Bad bolts. Machining accuracy of tapered shims. The rough tuning is taking longer than expected. New air compressor still not installed.

Zachary Wolf LCLS Undulator October 30, Hall Probe Calibrations In Fixed Mount Measurements are made in a reference magnet before the final data set is taken. The Hall probe is calibrated in the same mount it is used in.

Zachary Wolf LCLS Undulator October 30, Reference Undulator, Reference Magnet within spec temperature? need more studies taken during reference undulator measurements change probe mount (4 undulators tuned, will re-measure) Y. Levashov

Zachary Wolf LCLS Undulator October 30, Schedule Present Status: 15 undulators tuned and fiducialized 2 in fine tuning 1 in rough tuning 2 deferred for major re-work (bad end magnets, large sag might hit beam pipe) (minor problems like bad bolts or requiring gap shim replacement are fixed as we go) Present Schedule: 17 tuned and fiducialized 1 tuned We are 2 to 4 weeks behind schedule (which is 6 months ahead of installation).

Zachary Wolf LCLS Undulator October 30, Actions To Help The Schedule Problems Rough tuning is taking a long time Difficult to set K to a specified value (can no longer just re-assign slots) Need to replace bad bolts Need to replace many gap shims (±50 micron strongback tolerance, ±20 micron shim range) Problems with large tapered shim dimension deviations (need to measure shim removed and measure shim replaced) Need to set gap to 4 microns (!) for beam axis to be within ±1 mm of magnetic center (±2 mm good field region) Solutions New gap shimming stand Measure size of removed shim and size of replacement shim Use capacitive sensors for rapid feedback Kugler bench assists with rough tuning when required Coordinate technicians time better (start shimming at 7am) Set K and do phase shimming in one step

Zachary Wolf LCLS Undulator October 30, Phase Relative To A Reference Wave Is Used To Set Gap And Do Phase Shimming measurement requires alignment of undulator and probe need phase matching shim, not a problem problem after an iteration

Zachary Wolf LCLS Undulator October 30, Gap Shim, Capacitive Sensor Feedback check gap shimming with capacitive sensors fast, doesn’t require much alignment error shims were replaced at the error locations the removed shims were undersize, the replaced shims were oversize can catch these problems much quicker now

Zachary Wolf LCLS Undulator October 30, Installed New Gap Adjustment Stand tuning can continue while the technicians adjust the gap can use CMM for feedback on gap adjustment the Kugler bench was used for rough tuning when required

Zachary Wolf LCLS Undulator October 30, Beampipe Magnetic Effect Study

Zachary Wolf LCLS Undulator October 30, Undulator Mounting Tests MMFTunnel kinematic mount: well defined, repeatable flat on flat: over-constrained, however, there is compliance in aluminum feet and in the stages, and undulator (?)

Zachary Wolf LCLS Undulator October 30, Undulator Foot Used For Mounting And Positioning

Zachary Wolf LCLS Undulator October 30, Issue Under Test Ideal Error in slot for foot Correction Entrance endExit end Move axis to correct height by adjusting foot Twists undulator?, distorts foot? Tooling ball gives axis y position 1 mrad roll tolerance, twist is smaller twist is not the issue Axis at wrong height

Zachary Wolf LCLS Undulator October 30, Tests Of Mounting Method Differences 0.03 mrad, negligible negligible difference in twist of two undulators tested so far will check on all undulators The undulator appears to sit the same way on flat feet as on the kinematic mount.

Zachary Wolf LCLS Undulator October 30, To-Do List When we are done with production fix undulators with severe problems (we need to buy more tapered shims) study temperature dependence of K re-measure first five undulators study further undulator handling requirements Other Projects girder alignment plan build quadrupole coils for gun solenoids

Zachary Wolf LCLS Undulator October 30, Undulator Quadrupole Fiducialization Plan

Zachary Wolf LCLS Undulator October 30, Undulator Quadrupole Fiducialization System Commissioning Repeatable flip magnet, center position doesn’t change no bias from Earth’s field

Zachary Wolf LCLS Undulator October 30, Undulator Quadrupole Measurements Scott Anderson will do the fiducialization Andrew Fisher will do the strength and harmonics measurements

Zachary Wolf LCLS Undulator October 30, Leftovers From Last FAC Hall Probe Position Problem Problem: The vertical trajectories on the Dover bench and Kugler bench did not agree. The horizontal field integrals from the Hall probe had a large y dependence. Coil measurements showed no such dependence. We stumbled onto a paper Isaac wrote in 1997! The Sentron probes are sensitive to planar Hall effects after all!

Zachary Wolf LCLS Undulator October 30, Solution To The Hall Probe Problem Isaac’s hypothesis: planar Hall effect Solution: Measure the positions of the Hall elements. Tune the horizontal trajectory with the By probe on the midplane. Tune the vertical trajectory with the Bx probe on the midplane. Use only the long coil for final field integral measurements. (30 microns Dover bench, 10 microns Kugler bench)

Zachary Wolf LCLS Undulator October 30, Undulator Sag Changes Hall Probe Y Position Relative To The Midplane

Zachary Wolf LCLS Undulator October 30, Effect Of Hall Probe Error On Trajectories y=+200 μm y=+100 μm y=0 μm y=-100 μm y=-200 μm 2 -2 μmμmμmμm X TrajectoryY Trajectory

Zachary Wolf LCLS Undulator October 30, Constant B x0 Corrects B x To Long Coil Field Integral y=+200 μm y=+100 μm y=0 μm y=-100 μm y=-200 μm μmμm Y TrajectoryCorrected Y Trajectory 2 -2 μmμm B x0 =+0.52 G B x0 =+0.29 G B x0 =0.00 G B x0 =-0.29 G B x0 =-0.63 G

Zachary Wolf LCLS Undulator October 30, Effect Of Undulator Sag And Hall Probe Error On K Y (μm)K, No B x0 CorrectionK, After Correction ΔK (%), From Correction Conclusion: The trajectory curvature caused by the Hall probe error when the undulator sags by 100 microns will change K by less than 0.016% if no correction is applied. We do apply a correction, making the effect much smaller.

Zachary Wolf LCLS Undulator October 30, Conclusion Production undulator tuning is underway. The lab and equipment are performing well. (But we still need the new air compressor installed.) 15 undulators are tuned and fiducialized. Hall probe calibrations are now stable. Reference undulator measurements are within spec. Reference magnet measurements are stable. The magnetic effect of a stainless steel beam pipe was studied. We are checking that the way the undulator is mounted will not change the fiducialization, and twist can be compensated by a pitch adjustment. We have a quadrupole fiducialization plan. The quadrupole fiducialization system was commissioned. After production, we will fix undulators and continue studies.