CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004.

Slides:



Advertisements
Similar presentations
Chandra User’s Committee Meeting (4/15/08) P. Slane (Chandra Mission Planning) Constraint Classifications and the Chandra Long-Term Schedule.
Advertisements

Chandra User’s Committee Meeting (1/25/05) P. Slane (Chandra Mission Planning) Observing Constraints and Their Impact on Mission Planning.
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
CXC Manager’s Status Report For the period Oct 05 – Mar 06 Chandra Users’ Committee Meeting Roger Brissenden 5 April 2006.
FOT Mission Planning Prospects and Issues for a Fifteen Year Chandra Lifetime Sabina Bucher 9/18/2007.
CXC Response to June 04 Report 1.Bakeout Status: Paul Plucinsky 2.CIAO upgrade information: Jonathan McDowell 3.DS9 and visualization scripts: Jonathan.
Chandra User’s Committee Meeting (6/27/04) P. Slane (Chandra Mission Planning) Constrained and Coordinated Observations Chandra Mission Planning Response.
19 Oct 2005Chandra Users' Committee Cycle 7 Peer Review: June 2005  747 proposals, 12 panels, 101 reviewers  Hilton, Logan Airport.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 06 – March 07 Edward Mattison CXC Deputy Manager 25 April 2007.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 08 – March 09 Roger Brissenden CXC Manager 06 April 2008.
Chandra Users’ Committee CXC Manager’s Status Report For the period April 08 – September 08 Roger Brissenden CXC Manager 15 October 2008.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Roger J. Brissenden 12 January 2004.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Roger J. Brissenden 25 January 2005.
Chandra X-Ray Observatory CXC Paul Plucinsky CUC September Overall Status of the Instrument 2.Update on Controlling the FP Temperature ACIS Ops.
Chandra X-Ray Observatory CXC ACIS Ops team February 28, Controlling the ACIS FP Temperature: Turning off the DH Heater During ALL Perigee Passages.
Chandra Users’ Committee, Oct 2009 Chandra Director’s Office Cycle 11 Peer Review Proposal Numbers:  668 submitted proposals  *5.6 oversubscribed.
CXC Manager’s Status Report For the period April 06 – September 06 Chandra Users’ Committee Meeting Roger Brissenden 17 October 2006.
CXC EPHIN Status and Alternatives Michael Juda. CXC EPHIN StatusPage 2 Outline 1.EPHIN description 2.Thermal issues 3.+27V rail anomaly and impacts 4.Operations.
Chandra Users’ Committee CXC Manager’s Status Report For the period April 09 – October 09 Edward Mattison CXC Deputy Manager 29 October 2009.
Chandra Users’ Committee CXC Manager’s Status Report For the period April 07 – September 07 Roger Brissenden CXC Manager 19 September 2007.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 19 October 2005.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
CXC Manager’s Status Report Chandra User Committee Meeting Roger J. Brissenden 25 June 2002.
Chandra X-Ray Observatory CXC SOT, FOT, ACIS & MSFC PS October 19, Update on a Proposed Bakeout CXC SOT & FOT, ACIS Instrument Team and CXC SOT.
Chandra X-Ray Observatory CXC ACIS Ops team February 28, Controlling the ACIS FP Temperature: Turning off the DH Heater During ALL Perigee Passages.
CXC Chandra X-ray Observatory Operations. CXC Overview 1. Mission and Observatory Description 2. Chandra Operations 3. Chandra X-ray Center Architecture.
TRENDS ANALYSIS OVERSIGHT Dan Schwartz Development and Operations Science Support/ Technical Support Team 12 January 2004 CXC Users Committee SOT/DAS.
Chandra X-Ray Observatory CXC Paul Plucinsky EPI Cal Update on ACIS Operations I.New Patch for ACIS Flight SW II.Control of the ACIS FP temperature.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
CXC Chandra Users' Committee Chandra Director’s Office Proposal Cycle proposals *6.4 oversubscribed (based on time) GTO for review: due 3 rd April.
Implementation Review1 Moving Archive Data to the EMC Storage Array March 14, 2003 Faith Abney.
Chandra X-Ray Observatory CXC ACIS Ops team October 17, ACIS Changes Starting in Cycle 8 1) Selection of Optional CCDs 2) Revised Energy-to-PH conversion.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
Performance Auditing at PPS: Guidelines and Success Factors Richard C. Tracy District Performance Auditor April 16, 2007.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
1 Description and Benefits of JWST Commanding Operations Concept TIPS/JIM Meeting 17 July 2003 Vicki Balzano.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2010 – September 2011 Edward Mattison CXC Deputy Manager 13 October 2011.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2011 – September 2012 Roger Brissenden CXC Manager 10 October 2012.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2009 – April 2010 Roger Brissenden CXC Manager 27 April 2009.
Chandra Users’ Committee CXC Manager’s Status Report For the period May 2010 – October 2010 Roger Brissenden CXC Manager 25 October 2010.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
Chandra X-Ray Observatory CXC ACIS Ops team March 27, Controlling the ACIS FP Temperature: Turn Off the ACIS DH Heater ACIS Ops Team.
GOES Program October 1, 2002 Steven P. Kirkner GOES Program Manager, NOAA/NESDIS.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2013 – September 2014 Roger Brissenden CXC Manager 23 October 2014.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2014 – September 2015 Edward Mattison CXC Deputy Manager 29 September 2015.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
STIS STATUS Charles Proffitt TIPs May 21, STIS Status - Status of Repair Results of FT Amp B Bias Anomaly Changes to SMOV Plan.
NICMOS Suspend Event STB 632 “MECH_2_MAX_RETRIES_EXCEEDED” 2008/069.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
WEC meeting TED status and WEC timing.
Van Allen Probes VAP Spacecraft and Programmatic Status Ed Reynolds
1 Mission preparation Fred Lahuis SRON / Leiden Observatory MIRI NL Meeting ASTRON, 3 th June 2010.
Roger Brissenden CXC Manager 22 October 2013
I&T&C Organization Chart
Solar-B Science Working Group
GLAST Large Area Telescope:
Chandra Users’ Committee CXC Manager’s Status Report
The 2011 Chandra Alignment Shift
Launch and On-orbit Checkout
FY18 Water Use Data and Research Program Q & A Session
Presentation transcript:

CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004

CXC Status Report/CUCPage 2 Topics Program Level Status Operations Mission Metrics Data System Chandra Grant Awards

29 June 2004CXC Status Report/CUCPage 3 Program Level Status The spacecraft and science instruments continue to perform extremely well, and operations continue to be routine –Mission was halted twice due to solar activity, and loads were interrupted three times for Target of Opportunity observations –One minor anomaly occurred (details in Operations Status) –No safe modes have occurred since last report (last safemode 1999) Science planning, data processing and data distribution are proceeding smoothly Cycle 6 Peer Review was conducted June 04; went very well 15 press releases, 2 additional image releases and 2 SSUs in last 6 months Independent Implementation Review (IIR) held 11/18/03 yielded no findings and 2 observations. We submitted a final response to Observation 1, on peer review security, and are completing a preliminary response to Observation 2, on EPO strategy. Submitted financial Program Operating Plan in April 04. The budget & staff profiles are on plan through FY05. We are ready to absorb HRC, ACIS & HETG PI subcontracts 1 Oct 04.

29 June 2004CXC Status Report/CUCPage 4 Operations Status Spacecraft –Nominal winter eclipse season –EPHIN exhibited another brief occurrence of the supply voltage being current limited due to high temperatures (minor anomaly). In response, the temperature constraints used by mission planning have been tightened. A time-dependent maximum operating temperature is in the process of being implemented in the mission planning guidelines. –A diagnostic procedure was performed to test one possible cause of the stuck-on heater located on the Optical Bench Assembly in Zone 50. The power to a set of survival heaters, including the one in Zone 50, was turned off. After seeing no thermal response, the power was turned back on. The results indicated that the survival heater is functioning properly (i.e. it is not stuck on). The stuck-on heater is not causing a problem for operations.

29 June 2004CXC Status Report/CUCPage 5 Operations Status (con’t) Spacecraft (con’t) –Resumed performing angular momentum unloads by scheduling them in the weekly spacecraft command loads rather than initiating them from the ground during a real-time contact. – In response to the failure of the -Y shutter motor selection relay, we patched HRC safing stored command sequences to remove mechanism commanding, in order to prevent accidental shutter closure. –The on-board computer telemetry request list was patched to read the HRC anticoincidence shield and MCP event rates. This was a necessary step toward being able to use the HRC to monitor radiation in the event that the EPHIN instrument becomes unusable. –Implemented use of the Chandra Radiation Model for predicting operating times near the radiation belt entry and exit. The more accurate predictions are expected to add ~2 hours per week or ~375 ks per year of observing time.

29 June 2004CXC Status Report/CUCPage 6 Operations Status (con’t) Science Instruments –Science instruments are operating extremely well –Preparations for an ACIS bake-out are proceeding –HRC anticoincidence shield data are being examined as a function of radiation level in preparation for use in radiation safing in lieu of the EPHIN instrument

29 June 2004CXC Status Report/CUCPage 7 Operations Status (con’t) Load interrupt TOOs DateTargetRequest 03/10/041ES hours 03/16/04GRS days 05/25/04SGR days Operations Ground System Updates DateVersionChange 01/15/04ONLS 3.9.4Support Linux migration, script fixes 03/05/04FOT toolsFix Sausage command checker, other tools 04/09/04FOT toolsEnhance Sausage 05/12/04OFLS 10.3Chandra radiation model, rad zone automation 05/12/04FOT toolsEnhance to support OFLS 10.3

29 June 2004CXC Status Report/CUCPage 8 Mission Metrics MUPS Fuel Usage

29 June 2004CXC Status Report/CUCPage 9 Mission Metrics (con’t) MUPS Warm Start Count

29 June 2004CXC Status Report/CUCPage 10 Mission Metrics (con’t) Scheduled Observing Efficiency

29 June 2004CXC Status Report/CUCPage 11 Mission Metrics (con’t) Observing Time

29 June 2004CXC Status Report/CUCPage 12 Data System Data processing –Average time from observation to data delivery has continued at <1 week CIAO and Data System Software Releases DateReleaseContents include: 01/30/04DS 7.2MTA phase IIa, Webchaser upgrade 03/16/04DS 7.2.1Cycle 6 proposal software 04/22/04DS 7.2.2Fix to multimon 06/23/04DS 7.3Repro3 tools, archive V&V, L3 (beta) pipeline & tools 06/23/04CIAO 3.1ACIS time-dependent gain, mkacisrmf Grant Awards Grant award process continues to be nominal Transition to new Smithsonian-wide MIS system is still being felt: ~3 weeks to grant award (had been ~1 week)

29 June 2004CXC Status Report/CUCPage 13 Data Delivery Effectiveness

29 June 2004CXC Status Report/CUCPage 14 Chandra Grant Awards