RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.

Slides:



Advertisements
Similar presentations
PREPOSITIONS OF PLACE WHERE? IN BEHIND ON BETWEEN UNDER NEXT TO
Advertisements

LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Lift Safety EZ Up 10’ Lift. Training Objectives  Identify lift hazards  Understand OSHA equipment requirements  Know how to inspect equipment  Take.
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing RPC Assembly Changguo Lu, Kirk McDonald, Bill Sands Princeton University (July 28, 2007)
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
1 RPC HV cable pick-up noise issue C. Lu, Princeton University (10/26/2008) I pulled out some slides from my old DocDB files (DocDB#2209 and #406), and.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
1 66 blocks are prevalent in the telecommunications industry Today they are used primarily for phone applications only 66 blocks are prevalent in the telecommunications.
Box and Whisker Plots. Order numbers 3, 5, 4, 2, 1, 6, 8, 11, 14, 13, 6, 9, 10, 7 First, order your numbers from least to greatest: 1, 2, 3, 4, 5, 6,
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Roadway markings - where you can go and what you can do Designates lanes Directs traffic Warns of hazards Signals permission to pass Office 2010 Presentation.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Step 1: Place x 2 term and constant into the box 2x 2 2 PROBLEM: 2x 2 + 5x + 2.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
C. Lu, K.T. McDonald RPC Connections October 27, RPC Module Signal and HV Connections (October 27, 2008) Changguo Lu, Kirk T. McDonald Princeton.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Annecy, Carleton/CRPP, Colorado, Colorado State, LBNL, Maryland, McGill, MIT, Montreal, INFN Padova, INFN Pisa, Princeton, INFN Rome, UC San Diego, UC.
ELLIPTICAL HEAD PROTECTING COVER 01_INSTRUCTION DISCONNECTING THE ELLIPTICAL HEAD.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
Traffic Separation Schemes
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
HF “Slice test box” installation
- CT INSTALLATION PROCEDURE OVERVIEW -
INSTALLING ELECTRIC PANEL GENERATOR
HF “Slice test box” fabrication and installation
PREPOSITIONS OF PLACE WHERE? IN BEHIND ON BETWEEN UNDER NEXT TO
Electronics for RPC Upscope
First of all we will remind some numbers:
EHV Transmission Equipments
EB EE(EE+) 8/17 0/9 Crate A1 Crate A Crate A2 7/16 1/10 Crate C2 6/15
Box and Whisker Plots.
RPC Front End Electronics
Study of Event Reconstruction for Saturated Pulse
FOCAL LINE MODIFICATION OF THE E/W ARM OF THE NORTHERN CROSS RADIOTELESCOPE The modification consisted in removing the entire focal line from sector 3.
RPC Electronics Overall system diagram Current status At detector
Digitally subtracted pulse between
Box and Whisker Plots Dittamo Lewis Notes 2012.
Presentation transcript:

RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing

Racks for the distribution boxes The racks for fixing the gas distribution crate, HV multiplexing box and the signal ROT box will be arranged at the edge of the main supporting structure, The racks will stand on the rack platform side by side for easily monitoring and maintenance. Side view front view Can people walk on the platform to check the bubbler and perform some maintenance? If so you have to provide stairway and add guardrail to protect people from falling.

We want to easily split each supporting units Left scheme demonstrates the cable routing of the RPC system, For the near site Totally, we have: 48channel HV cables; 7 branch of gas tubes; 4signal fibers; To split all supporting units, we need to disconnect those:  9×8HV cable;  8×16gas tube, Φ6mm;  16×1signal flat cable But we do not to disconnect all of them if we want to disconnect continuous two units. What these tubes mean? They are very long and cross 2m wide frames. If we put some slack of tubing here, in case of separation of the adjacent frames within 1m range, can we avoid to disconnect tubes?

For the far site We want to easily split each supporting units Left scheme demonstrates the cable routing of the RPC system, Totally, we have: 72channel HV cables; 11branch of gas tubes; 6 signal fibers; To split each supporting units, we need to disconnect those:  0HV single conductor wire;  6×16gas tube, Φ6mm;  8×1signal flat cable But we do not to disconnect all of them if we want to disconnect continuous two units.