Programmatic Issues Discussion (Between NASA and CNES)

Slides:



Advertisements
Similar presentations
Environmental Application of Remote Sensing: CE 6900 Tennessee Technological University Department of Civil and Environmental Engineering Course Instructor:
Advertisements

Surface Water and Ocean Topography (SWOT) Satellite Mission
Brian Killough NASA NASA Future Missions Summary CGMS-38 Meeting Delhi, India November 8-12, 2010.
ECCO-2 and NASA Satellite Missions Lee-Lueng Fu Jet Propulsion Laboratory January 22-23, ECCO-2 Meeting.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Dave Ector COSMIC PM for OSD 4 November 10
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Marine Energy Technology Advancement Partnership (METAP) Hoyt Battey DOE Water.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Earth System Science Teachers of the Deaf Workshop, August 2004 S.O.A.R. High Earth Observing Satellites.
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
MR P.Durkee 5/20/2015 MR3522Winter 1999 MR Remote Sensing of the Atmosphere and Ocean - Winter 1999 Active Microwave Radar.
Surface Water and Ocean Topography Mission (SWOT)
Spacecraft Design and Sizing Dr Andrew Ketsdever MAE 5595 Lesson 14.
Welcome to the CNES HQ meeting of the SWOT Science Working Group Hosted by: Nelly Mognard, LEGOS-CNES Doug Alsdorf, Ohio State Lee-Lueng Fu, JPL Yves Menard,
Preliminary Rocket Design Objectives: 1. Comprehend a preliminary sizing example for a rocket 2. Explain basic trade-offs in rocket design.
1-1Risk Reduction Studies for SWOT February 1, 2008 SWOT Surface Water and Ocean Topography Mission Risk Reduction Activities Ernesto Rodríguez Jet Propulsion.
WATER-HM activities: CNES programmatic status Prepared by Eric Thouvenot & Pascale Ultré-Guérard Direction for Strategy and Programs - CNES.
Gary Lagerloef, PhD Science on Tap, 7 April Apollo 17 December 1972 Climate Science in the Space Age Gary Lagerloef Oceanographer & Climate Scientist.
Monitoring the Global Sea Level Rise Budget with Jason, Argo and GRACE Observations Eric Leuliette and Laury Miller NOAA/Laboratory for Satellite Altimetry.
Global Inter-agency IPY Polar Snapshot Year (GIIPSY): Goals and Accomplishments Katy Farness & Ken Jezek, The Ohio State University Mark Drinkwater, European.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Aerosonde User’s Workshop Wallops Aerosonde UAV Facility Mission Proposing And Costing Factors Chuck Williams.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Supernova/Acceleration Probe (SNAP) Reliability & System Safety Dick Bolt David Bogart June 28, 2001.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
ET- 3rd Indo-French Workshop on Megha-Tropiques, October ALTIKA / OCEANSAT3 ISRO / CNES mission Prepared by E. Thouvenot (CNES)
NASA’s Earth Science Division Flight Overview Bradley D. Doorn Program Manager Earth Science Division, Science Mission Directorate PECORA 18.
Understand how space organizations use concepts of operations and system integration plan to ensure the success of their program Space Concept of Operations.
Hosted by: Lee-Lueng Fu, Hydrosphere Mapper Doug Alsdorf, WATER Funding from CNES, JPL, and NASA Welcome to a Joint Meeting of Ocean Sciences and Surface.
Polar Communications & Weather (PCW) Guennadi Kroupnik (CSA)
OC3522Summer 2001 OC Remote Sensing of the Atmosphere and Ocean - Summer 2001 Active Microwave Radar.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Center for Satellite Applications.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
Sea Level Change Measurements: Estimates from Altimeters Understanding Sea Level Rise and Variability June 6-9, 2006 Paris, France R. S. Nerem, University.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Recent Developments NASA IDL/MDL study indicated technical feasibility of an ISS mission NASA IDL/MDL cost estimate was well above Earth Venture limits.
Slide: 1 Status of EUMETSAT services, GODAE IGST meeting, 7-9 August 2007 GODAE IGST meeting, 7-9 August 2007 Status of EUMETSAT services in respect to.
Radar Altimeter Data Base System (RADS) -- producing a consistent set of climate-grade observations spanning multiple satellite missions Altimeter/Tide.
1 Lunar Reconnaissance Orbiter (LRO) Overview CRaTER PDR 6/27/2005 Craig Tooley.
DORIS Days May 2-3, 2000 DORIS role in the next years P. Escudier CNES.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
1 Climate Absolute Radiance and Refractivity Observatory (CLARREO) Project Status Steve Sandford – Mission Formulation Manager July 6, 2010.
The Mars Exploration Program
Progress in Geoid Modeling from Satellite Missions
SWOT: A HIGH-RESOLUTION WIDE-SWATH ALTIMETRY MISSION
Engineering Team Support for the Roadmap Committee Mary DiJosephGSFC Tim VanSantGSFC Ron MullerGFSC/QSS Pete ClineGSFC Regan HowardGSFC Gregg MarrGSFC.
MEPAG Meeting October 4, 2012 Monrovia, CA Dave Des Marais, MEPAG Chair NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
Welcome Briefing Instrument Concepts for Europa Exploration Program Dr. Curt Niebur ICEE Discipline Scientist, Europa Clipper Program Scientist October.
Improved Marine Gravity from CryoSat and Jason-1 David T. Sandwell, Emmanuel Garcia, and Walter H. F. Smith (April 25, 2012) gravity anomalies from satellite.
This document contains proprietary and controlled information of National Space Organization (NSPO) of Taiwan and shall not be duplicated in whole or in.
Potential for estimation of river discharge through assimilation of wide swath satellite altimetry into a river hydrodynamics model Kostas Andreadis 1,
JASON2 Status in NOAA Gary Petti Office of Satellite Data Processing and Distribution.
JASON-1 MISSION STATUS S. Coutin-Faye CNES, Altimetry and Precise Positioning Office.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Climate Science and Satellite Altimetry Meeting of the Committee on a Strategy to Mitigate the Impact of Sensor De-scopes and De-manifests on the NPOESS.
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
NASA/US Ocean Satellite Missions
Technical Resource Allocations
Current Satellites, Products, and Activities
Systems Engineering Management
Recent Activities of the OST-VC
Presentation transcript:

Programmatic Issues Discussion (Between NASA and CNES)

Surface Water Ocean Topography 4-2 Measurement of ocean mesoscale eddies and their interaction with currents with centimeter level topographic radar interferometry High resolution ocean topographic measurements are important to understanding the ocean heat/energy budget, which is a key variable for climate modeling Surface Water  Determine surface water storage change and discharge to predict the land surface branch of the global hydrologic cycle  Asses the role of fresh water storage as a regulator of the biogeochemical cycle Sea Surface Topography  Measure ocean mesoscale activity, including fronts, eddies and boundary currents and Asses physical-biological interactions  Measure Basin-scale ocean circulation, heat transport, El Nino/La Nina, and sea level rise  Bathymetry  Improve understanding of maritime gravity field and global bathymetry Surface Water  Determine surface water storage change and discharge to predict the land surface branch of the global hydrologic cycle  Asses the role of fresh water storage as a regulator of the biogeochemical cycle Sea Surface Topography  Measure ocean mesoscale activity, including fronts, eddies and boundary currents and Asses physical-biological interactions  Measure Basin-scale ocean circulation, heat transport, El Nino/La Nina, and sea level rise  Bathymetry  Improve understanding of maritime gravity field and global bathymetry - recommended by NRC decadal survey for launch in

Water-HM Meeting CNES HQ, Paris, France Feb 1, 2008 Summary of ongoing activities IIP proposal for Water-HM risk reduction submitted AITT proposal to fly Ka-band altimeter over ice funded (will fly over some surface water targets en route) NASA/JPL investments in radar testbed, including Ka-band capability NASA/JPL mission formulation studies NASA ‘08 funding for first 7 Decadal Survey missions (including SWOT) Continuation in ‘09

Water-HM Meeting CNES HQ, Paris, France Feb 1, 2008 Summary of Issues Division of Responsibilities Amongst Partners (1 hour) Ernesto Rodriguez, Tony Freeman, Jim Graf, CNES a.Summary of ongoing US activities b.Launch vehicle costs in the U.S. are on the order of ~$100M whereas costs are much lower for non-U.S. rockets. Thus, one goal of the technology sharing is to lower overall mission costs. c.ITAR controls will restrict some aspects of the technology and potential sharing arrangements. During the development of the WatER proposal to ESA, some of these details were discussed d.NASA HQ has made it clear that sharing missions is a priority (e.g., Alan Stern presentation at Fall 2007 AGU). e.Work Breakdown (to be completed)

Water-HM Meeting CNES HQ, Paris, France Feb 1, 2008 ITAR Currently all documents presented at joint international meetings have to be cleared individually for ITAR restrictions A TAA is in preparation which will allow easier communication between CNES and JPL (ETC end of April, 2008) Letter Agreement?

Water-HM Meeting CNES HQ, Paris, France Feb 1, 2008 Launch Vehicles After the last of the Delta-II series, there is expected to be a gap in US launch capability in the intermediate range This will occur in the timeframe of the launch of the Water-HM mission, which is expected to be a medium-class mission Alternatives are: 1.Atlas V or Delta IV (shared launch?) 2.Minotaur IV 3.Russian Soyuz Shared launch is not straightforward - few missions are compatible with the 78 deg inclination, 1000 km altitude of Water-HM Some decadal survey missions could (possibly) fit the bill ASCENDS (CO2 laser) GACM (Atmos. Composition) GRACE II

RSDO Option* –Wet Mass: 1033 kg –Payload Mass: ~285 kg –Bus Mass: 579 kg –Propellant Mass: ~43 kg * Mass includes contingency Systems Design From Team X study, April 2006

PRIMA Option* –Wet Mass: 1091kg –Payload Mass: ~285 kg –Bus Mass: ~631 kg –Propellant Mass: ~43 kg NOTE: Difference in mass is due to different Power design, which increases Structures mass *Mass includes contingency Systems Design From Team X study, April 2006

8- Instrument Concept: Instrument Suite Mass Summary I

Current US Launch Vehicle availability for NASA procurement is limited and expensive with a lot of excess capability NASA future Alternative Launch Program current under study may add additional options at lower cost but future is uncertain * Estimates based upon public information Launch Vehicle Assessment and Considerations * Yellow-shaded items indicate marginal feasibility or unavailable

* Estimates based upon public information Foreign Launch Vehicle possibilities are numerous but may be more restricted due to programmatic procurement constraints Launch Vehicle Assessment and Considerations

Cost reduction options to reduce overall mission cost: Additional mission partnering Foreign (non-US) LV Piggyback or host other payloads on S/C Shared launch Orbit selection and requirements driving mass can be considered to lower required launch capability and open up lower cost LV options Mass savings to payload (e.g., AltiKa with integrated radiometer vs Jason nadir altimeter + AMR) may also ease launch vehicle constraints. Launch Vehicle Assessment and Considerations

SWOT Project Key Strawman Milestones & Schedule Schedule Assumptions Project Start: FY ‘10. Launch: FY ‘15. ATLO Duration: 24 months. Schedule independent of the Project partner providing the specific Project element/function. - Instruments - S/C bus - ATLO - Launch vehicle - Mission operations Starting Point for Schedule Development: JPL Team-X SWOT Mission Study, April 2006.

Strawman SWOT Project Key Milestones & Schedule Key Milestone Strawman Dates Activity/Milestone Date Study Start October 2007 Mission Concept Review October 2008 Project Mission System Review October 2009 Preliminary Design Review (PDR) / Technology January 2011 Cutoff Critical Design Review (CDR) August 2011 Subsystem Fab/Test August August 2012 ATLO Start August 2012 ATLO System I&T August April 2014 ATLO Launch Operations April September 2014 Launch September 2014 Launch + 30 days Operations September October 2014 Operations October September 2017

Water-HM Meeting CNES HQ, Paris, France Feb 1, 2008 Work Breakdown (to be completed) NASACNES Project Management Project Systems Engineering Mission Assurance Science Education/Public Outreach Payload Wide-swath altimeter Nadir altimeter Radiometer GPS DORIS Other instrument(s) Spacecraft Bus Ground Data System Mission ops Instrument ops Spacecraft ops Science Data processing Launch Vehicle