Facilities and Aggregate Planning. Overview As you know there are 24 hours a day, 7 days a week. What can you get done in a week period? Firms need to.

Slides:



Advertisements
Similar presentations
1 Capacity Management Capacity has a cost, whether it is used or not.
Advertisements

Constraint Management
Capacity Planning For Products and Services
4. Capacity Planning. Basic Organizational Structures in a Production Plant: Functional Line Continuous Process Group Organization.
Muhammad Salim Martak Peter Ronald Reonard Chandra Effendy
Market Impact of Payroll Tax At the bottom of page 157 the author starts with the sentence, “This result illustrates a principle that is worth remembering:
Long Run Demand for Labor
MD707 Operations Management Professor Joy Field
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning 6 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
© 2007 Pearson Education Constraint Management Chapter 7.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Capacity planning.
Facilities and Aggregate Planning. A digression I am not an advocate of gambling, but use an example here that you might draw on later. Say I have a coin.
CAPACITY LOAD OUTPUT.
Aggregate Planning in a Supply Chain
Aggregate Planning in a Supply Chain
Process Selection.
1 Monopsony Monopsony is a situation where there is one buyer – you have seen Monopoly, a case of one seller. Here we want to explore the impact on the.
Monopsony Monopsony is a situation where there is one buyer – you have seen Monopoly, a case of one seller. Here we want to explore the impact on the.
1 Introduction. 2 Intro Look down Main St. in any town and you will see small businesses. In larger cities you will note the large corporations with office.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Special Business Decisions and Capital Budgeting Chapter 25.
Multiplant Monopoly Here we study the situation where a monopoly sells in one market but makes the output in two facilities.
1 Excise Tax on a Market. 2 excise tax An excise tax is a tax on the seller of a product. We treat the tax as a cost of doing business. If there is no.
1 1 st degree price discrimination A form of Monopoly Power.
Production In this section we want to explore ideas about production of output from using inputs. We will do so in both a short run context and in a long.
1 Monopsony Monopsony is a situation where there is one buyer – you have seen Monopoly, a case of one seller. Here we want to explore the impact on the.
Long Run Demand for Labor
slide 1Monopoly MONOPOLY A monopoly is a firm which is the sole producer of a good or service for which there are no close substitutes. The monopolist’s.
Operations Management
Maintenance Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
CONTEMPORARY ECONOMICS
Operations Planning Horizons
Chapter 3 Productivity, Output, and Employment Copyright © 2012 Pearson Education Inc.
Ardavan Asef-Vaziri Systems and Operations Management
Objectives After completing this chapter, you will be able to:
Chapter 6 Production. ©2005 Pearson Education, Inc. Chapter 62 Topics to be Discussed The Technology of Production Production with One Variable Input.
© 2003 McGraw-Hill Companies, Inc., McGraw-Hill/Irwin BUILDING THE PRICE FOUNDATION 13 C HAPTER.
© 2002 McGraw-Hill Companies, Inc., McGraw-Hill/Irwin BUILDING THE PRICE FOUNDATION.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 4 Strategic Capacity Management.
AS Business Studies Marketing
Maintenance McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Chapter 6 Managing Capacity
Capacity Planning Pertemuan 04
slide 1Monopoly MONOPOLY A monopoly is a firm which is the sole producer of a good or service for which there are no close substitutes. The monopolist’s.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 18 Delving Deeper Into Microeconomics.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
21-1 The Costs of Production  Before anyone can consume to satisfy wants and needs, goods and services must be produced.  Producers are profit-seeking,
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
Strategic Capacity Management
Chapter 5: Supply.
Constraint Management
Facilities and Capacity Planning
Pricing Methods Cost-based pricing
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Capacity Planning.
Operations Management Capacity Design
4.3 Increasing efficiency and productivity
Planning Capacity Chapter 4.
Operations Management
Capacity Planning For Products and Services
Production and Operations Management
Pricing: Understanding and Capturing Customer Value
Pricing: Understanding and Capturing Customer Value
Capacity Planning For Products and Services
Presentation transcript:

Facilities and Aggregate Planning

Overview As you know there are 24 hours a day, 7 days a week. What can you get done in a week period? Firms need to come to grips with what can be accomplished in any time frame. Capacity is the maximum output that can be produced over a given time period. Nominal, or effective, capacity builds in the downtime for machine repairs, shift breaks and the like that make nominal capacity lower. Facilities and decisions regarding facilities have a major impact on what the firm can accomplish.

Facilities Strategy Of course the author suggests that the firm have an overall strategy about facilities as opposed to “incremental capital budgeting” decisions. This means the firm must look beyond just whether a facility will have more revenue than cost. Factors to consider when formulating strategy are 1) Level of predicted demand, 2) Cost of facilities, 3) Response of competitors to firm decisions, 4) The fit with overall business strategy, and 5) International considerations.

Capacity Cushion Capacity cushion is defined as capacity minus average demand. This is a measure of the firms ability to meet the average demand in the market. Let’s study the solved problem on pages 268 and 269 to put some associated ideas into context. Say demand from period to period is uncertain but has the following probability distribution for a chemical company: 1000’s of gallons demanded Probability The average, or expected, demand is the sum of the product of each demand amount and its associated probability: 100(.1) + 110(.2) + 120(.3) + 130(.3) + 140(.1) = = 121

Capacity Cushion If capacity is set at 130 there will be a cushion = 9. Anytime demand is less than 130 there will be idle capacity and this will occur =.6 or 60% of the time. Average utilization of the plant is what % of the 130 is being used and it equals the sum of the product of each utilization rate times its probability of occurrence. When demand is 100 the utilization is 100/130, so in total we have (100/130).1 + (110/130).2 + (120/130).3 + (130/130).3 + (130/130).1 = 10/ / / / /130 = ( )/ 130 =.9231 or 92.31% Note when demand is 140 the plant can only make 130 for full utilization.

Capacity Cushion Say that the business will lose $100,000 in revenue for each 1000 gallons it can not deliver, and it costs $5000 to build each 1000 gallons of capacity. There is a trade-off then between capacity and not being able to meet demand. I reproduce the probability distribution for a chemical company: 1000’s of gallons demanded Probability So if 100 capacity is built, unmet demand is 0(.1)10(.2)20(.3)30(.3)40(.1) = 21 Similarly for 110 capacity 0(.1) 0(.2)10(.3)20(.3)30(.1) = 12 Similarly for 120 capacity 0(.1) 0(.2)0(.3)10(.3)20(.1) = 5 Similarly for 130 capacity 0(.1) 0(.2)0(.3) 0(.3)10(.1) = 1 Similarly for 140 capacity 0(.1) 0(.2)0(.3) 0(.3) 0(.1) = 0

Capacity Cushion On the previous slide we see if 100 capacity is built the firm will not be able to meet 21 units of demand (in a probabilistic sense). The total cost is thus 500, ,100,000 = 2,600,000 When it adds 10 more in capacity, an additional 50,000 in cost in building is put on but it reduces lost sale cost on 9 units. SO the extra 50,000 in building cost saves 900,000 in lost sales. This change is a bargain. It makes sense to build 140 capacity because even that extra 10 over 130 adds 50,000 in cost but saves 100,000 on the reduction in lost sales. In this case the building cost is low enough relative to lost revenue to build lots of capacity.