Architecture Scenario Michael Stern, Vincent Sangpo, Alexis Ayala, Steven Zheng, Koki Shido Contact me at

Slides:



Advertisements
Similar presentations
2012 OLA Library Building Awards Public Libraries
Advertisements

TORONTO PUBLIC LIBRARY THORNCLIFFE BRANCH. PHOTOGRAPHS Interior view of library from entrance area……………………………………………………………………………………………… 3 Interior view.
TABLE OF CONTENTS: MISSISSAUGA PUBLIC LIBRARY PROJECT – RDH ARCHITECTS SLIDE #1 IMAGES OF EXISTING THREE LIBRARIES BEFORE RENOVATION; DRAWING AND TEXT.
Druid Hills High School
1 ROCKVILLE VOLUNTEER FIRE city of rockville, maryland MICHAEL HACKLEY ARCHITECTS.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Fall 2010 Convocation. Budget Transparency Leeward Community College Operating Budget.
 Mechanical  Electrical  Safety/Security  Video surveillance  Fire safety  Access control  Enhanced Programming  Roofing/Structural/Site Work.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
SCHEMATIC DESIGN PRESENTATION
College of Dental Sciences Dental school building.
Current Event Articles. Turn one in EVERY WEEK During every school week in which there are four or five days, each student will be required to complete.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
Fall 2009 All-Campus Address Bette Matkowski Denver Campus President September 1, 2009.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
Facilities Advisory Committee Preliminary Feasibility and Cost Study April 2012.
Historic Rehabilitation Projects Buildings designated on a national / state / or local historic register are eligible for rehabilitation using federal.
MONTGOMERY HIGH SCHOOL MODERNIZATION & NEW CONSTRUCTION
Town Meeting Presentation October 29, 2012 Randall Library Building Committee.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
Civil and Family Courts Complex September 8, 2015.
Good afternoon, We break ground next week for the Academic Success Center building on our campus that will house all of our programs, including drop-in.
AF SHCR Smoky Lake, Alberta PROPOSED SITE PLAN Office Entrance Formal Entrance Primary Entrance Youth & Wheelchair Entrance.
Parent Information Session UBC Okanagan Campus Parent Conference 2015 T H E U N I V E R S I T Y O F B R I T I S H C O L U M B I A O K A N A G AN CAMPUS.
Schematic design presentation School of Business South Hall Renovation.
Mooresville Consolidated School Corporation School Board Presentation Central Office Renovation April 11, 2011 Administration Center Renovation Franklin.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
OLA Library Building Award. Interior Views of Library Entrance Major Public Services Position Typical User Areas Public Spaces – Existing Light Only Major.
Grant Community High School District 124 Fox Lake, Illinois High School Additions OWP/P | Cannon Design 2010 Exhibition of School Planning and Architecture.
Baxter Village and Lake Shore Neighborhood Research Team.
Mariana Galindo Zambrano March 6, 2014 Mariana. Architectural Plans. Great home design begins with the floor plan. Whether you want an open layout or.
ISLE Open Educational Resources Home Page 1. 2 Browse, Search, Align Learning Standards.
Project A ‘Redesign an Abandoned Warehouse’ Ashik M. Abir, Donald Doehrer,Mohammed Kabir,Bruce Mayfield, Alexandra ChEPRASOVA, Aristides Lourdas We love.
College of Pharmacy Facilities. Ground Floor Library Students’ Affairs Academic Guidance Unit Lecture Halls Computer Lab Mosque Cafeteria Bridge leading.
Feb, Campus Tour SuperStupid Acheichevers.
School Directory Insert picture of School here.. Table of Contents Superintendent/ Principal - Office Staff Superintendent/ Principal - Office Staff Kindergarten.
Architecture Project By Nasrin Begum, Roan Luke V. Gamboa, Peter Seamus Kilkenny, Carin Aleen Queener, Grace Elisabeth Sanchez.
Floor-Plan Dimensions and Notes
Building Renovation Updated Plans. Welcome History Original structure was built during Civil War Past renovations – 1961 – 1978 – 2001.
Grand Palisades Resorts (aka Lake Austin PD).
By: Melissa Stinson & Stefanie Schmid. The roots of “old main” 1870 “Mankato Normal School” Third normal school in Minnesota 1868 classes were held in.
3 Parking Lots -Teachers -2 School bus -Security Ping-Pong Court Badminton Court.
E-twinning My school. My school is on Georgikis Scholis’ street. It’s near the green lights neighborhood.
Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Our mission is to prevent homelessness among low-income families by providing emergency assistance and to intervene on behalf of homeless people Presentation.
Affordable Single Family Housing: A Houston Case Study
Modern Home Design in Orange County
Kodiak Island Borough School District Kodiak High School Masterplan
3d Architectural Visualization Company
Silver Lake Regional High School
Project A ‘Redesign an Abandoned Warehouse’
COMP-COMERC DOO NIKŠIĆ
Donate Money for Poor Children in Haiti.
Progress Report 11/10/11.
ULM Library Virtual Tour.
2007 Bond Issue Capital Improvement Program
Enrollment Process How it Works
Navigating the Building: Finding a Book, Library Maps, and Study rooms
Where …? Unit 2 Open Day.
Sandy Grove Middle School
3B Chapter 1 Open Day.
3B Chapter 1 Open Day.
Continuing challenges regarding previous “findings” :
Where’s the classroom? It’s on the second floor. 2A : Unit 1.
Navigating the Building: Finding a Book, Library Maps, and Study rooms
Stoughton Public Library
250 Catalonia Building Remarks:
250 Catalonia Building Remarks:
Presentation transcript:

Architecture Scenario Michael Stern, Vincent Sangpo, Alexis Ayala, Steven Zheng, Koki Shido Contact me at

Our Scenario We must reconstruct a warehouse’s exterior and interior and make it into a livable environment for children. What we are going to construct: A semi-modernized children’s center

Our Warehouse 55,000 SF Warehouse - Brownsville, Brooklyn Newport-Street-Brooklyn-NY/

Demography of the Neighborhood Population: 86, 468 Adolescents: 29.9% of the population Under 5 years 6,717 5 to 9 years 6, to 14 years 7, to 19 years 8,320 There is also a school nearby, indicating there are many kids

What we are Renovating the Building into We will be renovating the warehouse into a children’s center since the population of the community consists of many children/teenagers.

What the Building Will Have The building originally consisted of four floors, First floor – Administration Second floor-Classrooms/Tutoring Rooms Third floor – Relaxation Fourth floor – Recreation Vacant warehouse next to the main house-Gym

First Floor First Floor: Administration – Security – Main Office/Faculty Office – Waiting Room – Guidance Counseling Room – Registration/Admission Office

Second Floor Classrooms/Tutoring Rooms – Computer Rooms – Studying Area – Peer Tutoring Library