Copyright © 2015 Pearson Education, Inc. All Rights Reserved. Flexible Budgets, Overhead Cost Variances, and Management Control.

Slides:



Advertisements
Similar presentations
Flexible Budgets, Variances, and Management Control:II
Advertisements

Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Inventory Costing and Capacity Analysis
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Flexible Budgets and Overhead Analysis.
Hilton Maher Selto. 17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
Flexible Budgets, Overhead Cost Variances, and Management Control
Flexible Budgets and Overhead Analysis Chapter 11.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
1-1.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
Flexible Budgets/Variances II Chapter Eight. Developing Budgeted Variable Overhead Allocation Rates Step 1: Choose the time period used to compute the.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-91 Chapter 8 Flexible Budgets, Variances, and Management Control: II.
© 2012 Pearson Prentice Hall. All rights reserved. FLEXIBLE BUDGETS AND OVERHEAD COST VARIANCES.
Flexible Budget, Overhead Cost Variances and Management Control
Introduction Overhead costs are a major cost area for many organisations. Planning and control of overhead costs is an ongoing challenge to managers.
Financial and Managerial Accounting
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 17 Flexible Budgets, Overhead Cost Management, and Activity-Based.
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Planning of Variable and Fixed Overhead Costs Effective planning of VOH involves reducing non-value added costs & consumption of cost allocation bases.
Chapter 23 Flexible Budgets and Standard Cost Systems
Copyright © 2015 Pearson Education, Inc., All Rights Reserved Flexible Budgets, Direct-Cost Variances, and Management Control.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Principles of Managerial Accounting Chapter 11. Static Budget Set at the beginning of a budgeting period and that is geared to only one level of activity.
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Overhead and Marketing Variances Chapter Thirteen.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead 11-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2009 Pearson Prentice Hall. All rights reserved. Flexible Budgets, Overhead Cost Variances, and Management Control.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
© 2012 Pearson Prentice Hall. All rights reserved. Using Budgets for Planning and Coordination Chapter 10.
Chapter 16 Fundamentals of Variance Analysis.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
The Islamic University –Gaza
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
CHAPTER 8 Flexible Budgets, Overhead Cost Variances, and Management Control.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 22. Prepare a flexible budget for the income statement.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
Chapter 17 Overhead Cost Management Flexible Budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Inventory Costing Dr. Hisham Madi. Inventory Costing  The inventory costing system that is chosen determines which manufacturing costs are treated as.
Variance Analysis: Manufacturing Overhead
Flexible Budgets, Overhead Cost Variances, and Management Control
Flexible Budgets and Overhead Analysis
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
Managerial Accounting
Flexible Budgets and Performance Analysis
Overhead and Marketing Variances
© 2008 The McGraw-Hill Companies, Inc., All Rights Reserved.
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
The Islamic University –Gaza
Flexible Budgets, Overhead Cost Variances, and Management Control
Flexible Budgets, Overhead Cost Variances, and Management Control
Flexible Budgets, Overhead Cost Variances, and Management Control
Presentation transcript:

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. Flexible Budgets, Overhead Cost Variances, and Management Control

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. 1. Explain the similarities and differences in planning variable and fixed overhead costs 2. Develop budgeted variable and fixed overhead cost rates 3. Compute the variable overhead flexible- budget variance, the variable overhead efficiency variance and the variable overhead spending variance 4. Compute the fixed overhead flexible- budget variance, the fixed overhead spending variance and the fixed overhead production-volume variance 8-2

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. 5. Show how the 4-variance analysis approach reconciles the actual overhead incurred with the overhead amounts allocated during the period 6. Explain the relationship between the sales- volume variance and the production- volume variance 7. Calculate variances in activity-based costing 8. Examine the use of overhead variances in nonmanufacturing settings 8-3

Copyright © 2015 Pearson Education, Inc. All Rights Reserved.  To effectively plan variable overhead costs, managers should focus on activities that add value and eliminate those that do not.  Fixed overhead planning is similar ~ plan only for essential activities and plan to be as efficient as possible. 8-4

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. …is a costing system that  Traces direct costs to output by multiplying the standard prices or rate by the standard quantities of inputs allowed for actual outputs produced.  Allocates overhead costs on the basis of the standard overhead-cost rates times the standard quantities of the allocation bases allowed for the actual outputs produced. 8-5

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. 1. Choose the period to be used for the budget. 2. Select the cost-allocation bases to use in allocating variable overhead costs to output produced. 3. Identify the variable overhead costs associated with each cost-allocation base. 4. Compute the rate per unit of each cost- allocation base used to allocate variable overhead costs to output produced. 8-6

Copyright © 2015 Pearson Education, Inc. All Rights Reserved  Variable overhead flexible-budget variance measures the difference between actual variable overhead costs incurred and flexible-budget variable overhead amounts. This variance can be further broken down into the Variable Overhead Efficiency Variance and the Variable Overhead Spending Variance. 8-7

Copyright © 2015 Pearson Education, Inc. All Rights Reserved  Variable overhead efficiency variance is the difference between the actual quantity of the variable overhead cost-allocation base used and the budgeted quantity of the variable overhead cost-allocation base allowed for the actual output X the budgeted variable overhead cost per unit of the cost-allocation base. 8-8

Copyright © 2015 Pearson Education, Inc. All Rights Reserved  Variable overhead spending variance is the difference between actual and budgeted variable overhead cost per unit of the cost-allocation base, multiplied by the actual quantity of variable overhead cost-allocation base used. 8-9

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. 8-10

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. Fixed overhead costs are, by definition, a lump sum of costs that remain unchanged for a given period despite potentially wide changes in activity within the relevant range. These costs are fixed in the sense that, unlike variable costs, fixed costs do not automatically increase or decrease with the level of activity within the relevant range. 8-11

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. 1. Choose the period to be used for the budget. 2. Select the cost-allocation bases to use in allocating fixed overhead costs to output produced. 3. Identify the fixed overhead costs associated with each cost-allocation base. 4. Compute the rate per unit of each cost- allocation base used to allocate fixed overhead costs to output produced. 8-12

Copyright © 2015 Pearson Education, Inc. All Rights Reserved  Fixed overhead flexible-budget variance is the difference between actual fixed overhead costs and fixed overhead costs in the flexible budget.  The fixed overhead spending variance is the same variance as the Fixed Overhead Flexible-Budget Variance 8-13

Copyright © 2015 Pearson Education, Inc. All Rights Reserved  Production-volume variance is the difference between budgeted fixed overhead and fixed overhead allocated on the basis of actual output produced.  This variance is also known as the denominator- level variance. 8-14

Copyright © 2015 Pearson Education, Inc. All Rights Reserved.  Interpretation of this variance is difficult due to the nature of the costs involved and how they are budgeted.  Fixed costs are by definition somewhat inflexible. While market conditions may cause production to flex up or down, the associated fixed costs remain the same.  Fixed costs may be set years in advance, and may be difficult to change quickly.  Contradiction: Despite this, examination of the fixed overhead budget formulae reveals that it is budgeted similar to a variable cost. 8-15

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. 8-16

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. 8-17

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. 4-VARIANCE ANALYSIS SPENDING VARIANCE EFFICIENCY VARIANCE PRODUCTION- VOLUME VARIANCE VARIABLE OVERHEAD YES NEVER A VARIANCE FIXED OVERHEAD YESNEVER A VARIANCE YES 8-18

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. You may recall from chapter 7 that the static budget variance (the difference between the static budget and the actual results) was $93,100 Unfavorable for Webb Company, our sample company. The sales-volume variance (the difference between the flexible budget and the static budget) was $64,000 Unfavorable. The sales-volume variance consists of two components: The operating-income volume variance and the production-volume variance. 8-19

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. 8-20

Copyright © 2015 Pearson Education, Inc. All Rights Reserved.  Activity-based costing systems focus on individual activities as the fundamental cost objects.  Variances are calculated for each activity 8-21

Copyright © 2015 Pearson Education, Inc. All Rights Reserved.  Nonmanufacturing companies can benefit from overhead variances just as manufacturing companies can.  Variance analysis can be used to examine overhead costs and make decisions about pricing, managing costs and the mix of products.  Output measures will be different and can be passenger-miles flown, patient days provided, rooms-days occupied, ton-miles of freight hauled, etc. 8-22

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. TERMS TO LEARNPAGE NUMBER REFERENCE Denominator levelPage 292 Denominator-level variancePage 298 Fixed overhead flexible-budget variance Page 297 Fixed overhead spending variance Page 297 Operating-income volume variance Page 307 Production-volume variancePage 298 Standard costingPage

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. TERMS TO LEARNPAGE NUMBER REFERENCE Total-overhead variancePage 305 Variable overhead efficiency variance Page 293 Variable overhead flexible- budget variance Page 293 Variable overhead spending variance Page

Copyright © 2015 Pearson Education, Inc. All Rights Reserved. 25