DEBCO meeting Uso riservato aziendale 1 AGENDA: Technical Progress Meeting 9.30 – Welcome by … Start of partners presentation and activities: Partners.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
STEPs Scenarios for the Transport System and Energy Supply and their Potential Effects Framework Programme 6, Call 1A Thematic Priority 1.6.2, Area 3.1.2,
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
and 6.855J Cycle Canceling Algorithm. 2 A minimum cost flow problem , $4 20, $1 20, $2 25, $2 25, $5 20, $6 30, $
Virtual Biodiversity ViBRANT Scripting Life: goals & logistics for day 2 Vince Smith Natural History Museum, London ViBRANT Virtual Biodiversity.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
1 1  1 =.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
© Project ESIL Project ESIL 1ESIL Abstimmung Project ESIL European Sustainable Innovation License (for SME´s) 4 th Project Meeting.
Training +45 Teachers Facilitating Learning among Elders Final Presentation European Cooperative House Brussels 16th December 2009.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
© S Haughton more than 3?
TENCompetence Management Issues: WP1 Eric Kluijfhout.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
Let’s take a 15 minute break Please be back on time.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Shiretoko Model Plans. Model Plan during Bear Activity Period (for groups of 20 or less) Alternative Course Day 1 12:40 Depart Utoro lunch location 12:50.
Agenda SwiNOG-6 09:00 – 09:30 Coffee and gipfeli 09:30 – 09:40 Welcome, Agenda, SwiNOG changes... 09:40 – 10:40 Open discussion „Filtering / Lawful interception“
PSSA Preparation.
How Cells Obtain Energy from Food
Presentation transcript:

DEBCO meeting Uso riservato aziendale 1 AGENDA: Technical Progress Meeting 9.30 – Welcome by … Start of partners presentation and activities: Partners presentation Work performed until now On going activities Work to be done in the second project year 9.40 – Enel – C. La Marca – Electrabel – F. Hanssens – Public Power Corporation (PPC) – C. Papapavlou – Break – University of Stuttgart (IVD) – J. Maier – Tractebel – J.P. Mossoux – Laborelec – P. Savat – Lunch 23 June Morning

DEBCO meeting Uso riservato aziendale 2 AGENDA: Technical Progress Meeting – CESI Ricerca – V. Fantini – Centre for Research and Technology Hellas (CERTH) – P. Grammelis – Netherlands Energy Research Foundation (ECN) – W. van de Kamp – Agriconsulting (AGR) – F. Rossi – Break – MATUZ Hungarian Combustion Ltd. – L. Barta – Wroclaw University of Technology (WUT) – H. Kruczek – Energetyka Rokita Ltd. – J. Krawczynski – Break – Doosan Babcock (DB) – W. Livingston – Alstom Power (AP) – M. Markus – VGB Power Tech e.V. – U. Langnickel – International Flame Research Foundation (IFRF) – L. Tognotti – Conclusions – End of the first day 23 June Afternoon

DEBCO meeting Uso riservato aziendale 3 AGENDA: Technical Progress Meeting WP leaders presentation: Actions and time schedule to reach the project common objectives and deliverables Discussion 9.00 – WP0: Management and Decision Support – C. La Marca 9.10 – WP1: R&D support actions – J. Maier 9.25 – WP2: Design and optimization of co-firing configuration at max biomass share – R. Jongen 9.45 – WP3: Assessment of biomass production, supply and quality control - P. Grammelis – Break – WP4: Assessment of boiler performance – N. Rossi – WP5: Assessment of APCD impact – J. Maier – WP6: Assessment of ash characteristic and usability – W. van de Kamp – Lunch – WP7: Exploitation of all project results - U. Langnickel 13:15 – WP8: Dissemination – L. Tognotti 13:30 – Administrative issues, budget variation: preliminary discussion 14:00 – End of the meeting 24 June 2009