CAISO Update JSIS Meeting March, 2015. Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.

Slides:



Advertisements
Similar presentations
WISP RFI for Applications response summary
Advertisements

WECC JSIS Update Dmitry Kosterev, BPA.
JSIS Report to WECC PCC and OC
Joint Synchronized Information Subcommittee JSIS.
Using Synchrophasors for Preventing Cascading Outages
January TSS J. Gronquist, S. Kincic
ISO New England Smart Grid Investment Grant Update David Bertagnolli – NASPI Working Group Meeting October 12-13,
Marianna Vaiman, V&R Energy
Idaho Power Update JSIS Meeting March 3, Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations.
New Energy Horizons Opportunities and Challenges Update on IEEE PC Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement.
and Trend for Smart Grid
Synchrophasors: Improving Reliability & Situational Awareness
Prepared by Tony Weekes Husam Al Hadidi Brian Archer.
1 1 Office of Science Lawrence Berkeley National Laboratory Distribution µ PMU Applications Joe Eto Emma Stewart
Introduction to Phasor Measurements Units (PMUs)
North American Synchrophasor Project Initiative NASPI Work Group Meeting Oct , 2011 Joseph H. Schaefer Florida Power & Light.
WECC Joint Synchronized Information Subcommittee
Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13,
NASPI overview and update
PacifiCorp Utility Update JSIS Meeting March, 2015.
American Transmission Company Smart Grid Investment Grant Update Jim Kleitsch NASPI Work Group Meeting October 12-13,
“Discovery Across Texas” New Technology Solutions for Wind Integration in ERCOT Synchrophasor Project Status Update Bill Muston Oncor Electric Delivery.
I NTEGRATION OF S YNCHRO -P HASOR M EASUREMENTS IN P OWER S YSTEMS S TATE E STIMATION FOR E NHANCED P OWER S YSTEM R ELIABILITY Hassan Ghoudjehbaklou,
Texas Phasor Project ERCOT Reliability and Operations Subcommittee (ROS) February 12, 2009 Milt Holloway, Center for the Commercialization of Electric.
Academic Experience with Wide Area Sensors by Virgilio Centeno Virginia Tech PSC, Distributed Generation, Advanced Metering and Communications March 9,
PHAAUG – Peak Reliability
Synchrophasor Measurement Implementation in ERCOT
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
From Fault Recording to Disturbance Recording
Monitoring of Active Distribution Networks in Steady State and Transient Conditions by means of accurate synchrophasors measurements Mario Paolone École.
Synchrophasor: Implementation,Testing & Operational Experience
Lessons Learned from the Texas Synchrophasor Network by Presented at the North American Synchrophasor Initiative (NASPI) Meeting Toronto, Ontario Thursday,
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Wide area SPS for Integrating SR with national grid Approach Document prepared by.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
SMS Update NERC Synchronized Measurement Subcommittee (SMS) Ryan D. Quint, Ph.D., P.E. Staff Coordinator, NERC SMS, SAMS WECC JSIS Meeting September 22,
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Managing Reliability and the Markets with PI
November 16, 2012 Synchrophasor Meeting Dynamic Model Validation Project Jonathan Rose Engineer, Resource Integration Sidharth Rajagopalan Engineer, Dynamic.
PMUs for NERC Reliability Standards Ryan D. Quint, Ph.D., P.E. Staff Coordinator, NERC SMS, SAMS WECC JSIS Meeting September 22, 2015.
JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA - WISP Project NASPI Work Group Meeting October 12-13, 2011 Scott Lissit – Project Manager,
PJM Interconnection Smart Grid Investment Grant Update
ROSE Updates Marianna Vaiman, V&R Energy WECC JSIS Meeting Salt Lake City, UT September 9 – 10, 2014 Copyright © V&R Energy.
Imagination at work. Paddy McNabb Senior Engineer January 2016 Grid Stability Applications Wide Area Monitoring System.
WECC Joint Synchronized Information Subcommittee Report Planning Coordination Committee Meeting March 22,
Copyright © PGE, Advanced Energy Industries, and SEL 2014 Field Testing of 3G Cellular and Wireless Serial Radio Communications for Smart Grid Applications.
Slaven Kincic MVWG March System Model Validation Task Force (SMVTF) System Events for System Model Validation o 21th January event:  Colstrip.
1 Dr.Wang Yingtao Engineer Power System Department CEPRI,China Nov 2006 R&D OF REAL TIME DYNAMIC MONITORING SYSTEM IN CHIHA.
| Electric Power Group Presents Maximizing Use of Synchrophasor Technology for Everyday Tasks Welcome! The meeting will begin at 2:00 p.m. EDT / 11:00.
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
MISO – Synchrophasor GPA Users Forum Sept 7th, 2011.
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
SCE Utility Update JSIS Meeting March, 2015.
Peak online TSAT Implementation Update
A Distributed Two-Level PMU-Only Linear State Estimator
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
Electric Power Group Presents Maximizing Use of Synchrophasor Technology for Everyday Tasks Welcome! The meeting will begin at 2:00 p.m. EDT / 11:00.
NASPI PMU Data Application Classification
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
NASPI PMU Data Application Classification
WECC Joint Synchronized Information Subcommittee
Hongming Zhang EMS Applications Manager, PEAK RC
Presentation transcript:

CAISO Update JSIS Meeting March, 2015

Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant PDCs/Servers – 5 PDCs connected to both sites Redundant PI servers for real-time historian

Data Management Streaming data in C at 30 frames/sec. Archiving – PI Historian – 90 Days – 30 f/s – Raw Phasor Data (redundant, dedicated to synchrophasors only) – PI Historian – Calculated Data – Down-sampled (redundant production PI Servers/collectives) – Long term storage (less expensive) – Comtrade – 3 years plus all events

Engineering Applications Angle Difference - sent to EMS Backup Frequency Source – sent to EMS MW Flow – Backup for Tie Line measurement – sent to EMS Post-Event Analysis Dynamic Model validation – DSA model verification Benchmarking – comparison to SE for Kv and angle  ’s

Control Room Applications Phase Angle Difference on EMS one-line displays Island Detection Frequency Event Detection Event analysis/locator (Future) Oscillation detection (Future)

Expectations from WISP, JSIS, NASPI Data availability and quality information, support with PMU issues Exchange of tools and applications Exchange of lessons learned – Installations, applications, data management, etc.