What have we accomplished? STRENGTH OF MATERIALS

Slides:



Advertisements
Similar presentations
Chapter-2 Parts of Steel Bridge.
Advertisements

Form Materials and Accessories
CASTING A CONCRETE WALL
ARC313 Building Code II. Review What is the minimum bearing pressure allowed for soils to support foundations? 75 kPa How can you tell by looking at the.
FORMWORK Prof Awad S. Hanna.
Heavy Concrete Construction Formwork
Chp12- Footings.
Competency: Draw Wall Sections
Parts of typical slab formwork
By : Prof.Dr.\Nabil Mahmoud
Structural System Overview
MNM Fatal Falling Material Accident Falling Material Accident August 17, 2012 (Florida) August 17, 2012 (Florida) Victim Recovered September 4,
We are reviewing Chapt. 1&2 and we assigned Chapt. 3 & 4 for
Walls Ron Gatepain constructionsite.
PowerPoint ® Presentation Chapter 4 Flatwork Flatwork Applications Site Preparation Concrete Reinforcement Flatwork Procedures Joint Control Bleedwater.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
OSHA Subpart Q Concrete and Masonry Construction.
Arch 330 Fall 2008 FORMWORK AND REINFORCING FOR CONCRETE.
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Reinforced Concrete Design II
Michelle Perticarari Rebeca Peña
Slab Form Design.
REINFORCED CONCRETE Reinforced concrete is a composite material which utilizes the concrete in resisting compression forces, and steel bars and/or.
Wall and Ceiling Construction Vocabulary
Chapter 18 Foundations.
Chapter 12 Concrete Construction Part 2 1CE 417, King Saud University.
Concrete Construction
FORM MATERIALS We finished Chapt. 1 & 2 and we are reviewing Chapt. 3 & 4!!! Chapter One- Introduction to Forming Chapter Two- General Objectives in Formwork.
Foundation Engineering CE 483
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Concrete Construction I Chapter 19. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson Education,
Balloon Frame North-American invention, 1833
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
FORMWORK COST AND CONSIDERATIONS We are reviewing Chapt. 1&2 and we assigned Chapt. 3 & 4 for reading assignment!!! Chapter One- Introduction to Forming.
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
Frames and Walls Lateral Stability
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
Strength of Material-1 Introduction. Dr. Attaullah Shah.
Foundation Loads Dead Load Live Load Wind Load
BUILDING CONSTRUCTION
Blocking a b c d.
Building Construction
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Floor System Sizes and Materials
Leads Institute of Technology & Engineering
Foundation – jay Desai.
UPPER FLOORS TIMBER AND CONCRETE.
FORMWORK DR. Nabil Dmaidi.
Competency: Draw wall sections and details.
WELCOME.
Concrete and Masonry Construction 29 CFR 1926, Subpart Q
Form Materials and Accessories
Arch205 Materials and building construction 1 foundation
Wood structures Topic 3 Floor Framing
Wood Structures Topic 8 Quality Workmanship
CONCRETE FORMWORK Formwork.
Arch205 building construction foundation
CIVIL WORKS CONSTRUCTION TECHNOLOGY 2017/18
Arch205 building construction floor & Roof systems
Building Frame (Column & Beam)
STRUCTURAL FAILURES-CAUSES AND REMEDIES:
Chapter 7 Foundation Systems.
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Chapter 13 Concrete Form Design.
BUILDING CONSTRUCTION
Presentation transcript:

What have we accomplished? STRENGTH OF MATERIALS FORM NOMENCLATURE AND SAFETY What have we accomplished? STRENGTH OF MATERIALS TIMBER DESIGN SOIL MECHANICS STEEL DESIGN Where do we go from here? Book Overview Chapter One- Introduction to Forming Chapter Two- General Objectives in Formwork Building Chapter Three-Overall Planning for Formwork Chapter Four-Materials, Accessories, Proprietary Products Chapter Five -Load and Pressures Chapter Six- Form Design

Introduction to Forming What is forming and formwork? Formwork is the total system of support for placed concrete. It is a major cost of a concrete structure (it accounts for as much as 60% of the cost) What is its purpose? to safely support the reinforced concrete in its plastic state until it has reached adequate strength What are the objectives of any form design? the form design must provide the best quality, safety and at also be economical

Introduction to Forming the best quality entails: 1. alignment to adjacent surfaces 2. resistance to excessive deflections 3. a good surface finish 4. structural integrity to withstand service loads 5. its ability to use standard materials 6. dimensional consistency or its repetitive members Note: Safety and Economics will be covered in more detail later on

Introduction to Forming What kind of nomenclature or terminology is associated with forming? Form ties- installed through the forms to resist the bursting pressure exerted by the concrete. ( has a clamping device at each end for attachment to and support of the wales

Introduction to Forming Beam- horizontal structural load bearing member Braces- fastened to one side of the forms to prevent shifting when concrete is placed Formwork- the total system of support for freshly placed or partially cured concrete. This includes the mold or sheathing that contacts the concrete as well as supporting members

Introduction to Forming What kind of nomenclature or terminology is associated with forming? joists- horizontal members which directly support sheathing reshoring- the construction operation in which the original shoring is adjusted or replaced to support partially cured concrete and other imposed loads Sheathing - the material forming the contact face of forms and providing the resistance to the pressure of the freshly placed concrete Shoring(falsework)-the elements used , excluding the formwork, to support fresh concrete and/or structural members during construction(i.e. vertical posts, lateral bracing, etc.)

Introduction to Forming What kind of nomenclature or terminology is associated with forming? Sill(Mud Sill)-a member, usually wood, designed to distribute the vertical shoring loads to the ground or the slab below. Stringer(Ledgers)- horizontal structural members which directly support joists

Introduction to Forming Studs- members to which the vertical sheathing is attached and provide support for it, it is installed vertically Wales(Walers)-installed perpendicular to the studs in order to support the studs, to hold the studs in position, to ensure good alignment for the forms and to recieve the form ties

Introduction to Forming What kind of nomenclature or terminology is associated with forming? Cleat-small board used to connect formwork members or used as a brace Base Plate- a device used between post, leg or screw and foundation to distribute the vertical load(mudsill)

Introduction to Forming Strongbacks- installed perpendicular to wales to provide additional strength and rigidity to high forms Batten(Batten Strip)-a narrow strip of wood placed over the vertical joint of sheathing or paneling, or used to hold several boards together

Introduction to Forming What kind of nomenclature or terminology is associated with forming? Sources: Glossary refer to Appendix page A-3 Pictures with spec A-16 to A-20 Pictures of Vertical shoring 4-51 Pictures of Ties 12-19

Introduction to Forming What are the safety issues involving form design? Causes for Formwork Failures: 1.Improper or inadequate shoring 2. Inadequate bracing of members 3. Lack of control of rate of conc. placement 4.Improper vibration or consolidation of conc. 5.Improper or inadequate connections 6. Improper or inadequate bearing details 7.Premature stripping of formwork 8.Errors in placement of reshoring 9.Improper, or lack of, design of formwork 10. Inadequate strength of form material 11. Failure to follow codes and standards 12. Modifications of vendor-supplied equip. 13. Negligence of workers or supervisors

Introduction to Forming What are the safety issues involving form design? Examples Formwork Failures: 1.Improper or inadequate shoring i.e wrong size(too small to carry the load or too long and buckles) 2. Inadequate bracing of members lack of cross or horizontal bracing the cross bracing is preferred 3. Lack of control of rate of conc. placement This causes excessive pressures high discharge point causes impact loads in cold conditions the setting rate is retarded 4.Improper vibration or consolidation of conc. internal problems- impact loads on members external problems-liquefaction occurs, and vertical sleaves vibrate out of plumb alignment

Introduction to Forming What are the safety issues involving form design? Examples Formwork Failures: 5.Improper or inadequate connections Fasteners suitability (threaded vs. nails) or inadequate number of nails 6. Improper or inadequate bearing details Shores placed directly on ground w/o plate uncompacted or suitable soil conditions insufficient thickness to bridge gaps 7.Premature stripping of formwork inadequate time duration to set or cure 8.Errors in placement of reshoring improper locations (introduce secondary stresses) insufficient quantity provided

Introduction to Forming What are the safety issues involving form design? Examples Formwork Failures: 9.Improper, or lack of, design of formwork lack of basic design principles use of too high allow stress values insufficient loading consideration(i.e impact) improper loading value(i.e. conc thickness) 10. Inadequate strength of form material i.e Construction grade vs. structural grade damage due to use insufficient & improper ties to multiple members 11. Failure to follow codes and standards Failure to follow the ACI-concrete NDS-wood AISC-steel

Introduction to Forming What are the safety issues involving form design? Examples Formwork Failures: 12. Modifications of vendor-supplied equip. proprietary equipment- misuse 13. Negligence of workers or supervisors untrained workers poor supervision

Introduction to Forming Inspection Stages recommended by ACI: 1. Preliminary Inspection is after the forms are built and prior to the oiling or re-bar placement 2. Semi-Final Inspection is prior to final cleanup 3. Final Inspection is immediately before concreting to make sure surface is clean and oiled Recommendation: During the concrete pouring listen to forms for cracking and popping noise look at all portions and check for displacement of elements and vertical misalignment

Introduction to Forming What are the safety issues involving form design? See Case Studies in 2-4 to 2-8