1 October 2009 Cross Support Transfer Services (CSTS) Future Services as of Spring 2014.

Slides:



Advertisements
Similar presentations
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS24 DLR, October 2007 CCSDS Liaison Consultative Committee on Space Data Systems.
Advertisements

CCSDS Cross Support Services Issue 0.1 October, 2008 Takahiro Yamada, JAXA/ISAS Peter Shames, NASA/JPL.
1 June 2010 Cross Support Transfer Services (CSTS) Overview.
SLE Toolkit 18 April 2005 Athens, Greece CSTS - 1 CSTS Charter & SLE Toolkit Status 11 April 2005 Y.Doat.
Folie 1 Service Oriented Architecture - Prototyping study - DLR/GSOC Author: S.Gully.
Cross Support Transfer Services – Forward Frames Service 10 – 15 November 2014 London, United Kingdom John Pietras Global Science and Technology, Inc,
G O D D A R D S P A C E F L I G H T C E N T E R 1 The Trade Between CCSDS and HDLC Framing on Global Precipitation Measurement David Everett and Jonathan.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
1 CROSS SUPPORT SERVICE ARCHITECTURE Takahiro Yamada (JAXA/ISAS) CCSDS Meeting, Heppenheim, Germany 2 October 2007.
ESTEC, Noordwijk, Netherlands 27 Oct 2009 SERVICE ARCHITECTURE FOR SPACE -- BOF 1.
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram,
SIS_DTN 1 SIS-DTN Forward Planning October 2013 San Antonio Fall 2013.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 In-Space Cross Support Using Delay / Disruption Tolerant Networking Keith Scott 15 October, 2008 Berlin, Germany October 15, 2008.
CCSDS SCCS ARD For brevity and file-size sake, this file consolidates ONLY those figures that are in the current ARD. Ver 0.9, 29 July 2014 Peter Shames,
SISG - SSI ADD Service, Physical, and Protocol View Document Figures Ver 0.4, 2 Sept 09 Peter Shames, et al.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
June 2004 SIW-4 - IP in Space Implementation Guide 1 Handbook for Using IP Protocols for Space Missions James Rash - NASA/GSFC Keith Hogie, Ed Criscuolo,
IOAG-12 (SLE) Cross Support Service Catalog Wolfgang Hell, ESA 10 SEPTEMBER 2008 OBERPFAFFENHOFEN, GERMANY 1 INTERAGENCY OPERATIONS ADVISORY GROUP.
ESA Report to CMC ESA / ESTEC, 5th November 2009 Mario Merri (deputising JFK / NPESA CCSDS Delegate)
How would optics fit in CCSDS Stack? G.P. Calzolari (SLS Area Director) CCSDS Spring 2012 Meetings 16 April Which Cross Support Services should be picked.
The Consultative Committee for Space Data Systems Report to CCSDS AGENC Y Note to CMC members: This template follows the CMC-agreed outline for agency.
CMC, 26 Oct. 05 Page 1 JAXA CCSDS Status October 26, 2005 CMC Reston, VA, USA Yoshitaka Taromaru Nobuhiro Yagi JAXA CCSDS Secretary Office.
1 ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG) Draft, Issue March 2003 Takahiro Yamada, Chair, AWG.
Cesg-1 04 November 2009 CESG FALL 2009: items brought to attention of the CMC.
Overview of Functional Resources for IOAG Service Catalog Services 15 April 2013 Bordeaux, France John Pietras Global Science and Technology, Inc., Greenbelt,
Summary of IOAG-11 IOAG-11 June18, 2007 Cebreros, Spain Adrian Hooke (NASA) and Nestor Peccia (ESA) CCSDS Technical Liaisons.
Colorado SpringsJanuary 23~26, Winter-Spring 07 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
FSH/security SLS-SLP fall2009 (version 4) Page 1 Security Headers + Homogeneous approach to FSH and Insert Zone in TM/AOS/TC frames: some problems and.
Cross Support Service Management Overview Nicolas Champsavoir DCT/PS/SSC CCSDS – CSS Area Cross Support Services ex-SLE Service Management.
DTS & CSTS REPORT 15 April 2005 Athens, Greece CSTS - 1 DTS & CSTS WG STATUS REPORT, End of Spring 2005 Meeting Yves Doat Chairman 15 April 2005.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Real-Time Systems Presented by: Stuart D Fowell CCSDS Time Critical Onboard Application Services Stuart D. Fowell, Keith L. Scott, Chris.
BITTT and CCSDS in China October About BITTT BITTT is the abbreviation for Beijing Institute of Tracking and Telecommunications Technology.
IRIG-106 CHAPTER 7 TELEMETRY DOWNLINK ETTC JUNE 2015 Balázs Bagó Zodiac Data Systems.
CSTS File Transfer Service CS File Transfer Specification – Initial Discussions IOAG Service Catalogue #1 Scope Candidate Applications File Content.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
The CCSDS Cislunar Communications Architecture Keith Scott The MITRE Corporation CCSDS Meeting January 2007.
CCSDS SOIS Working Group Meeting – Berlin, Germany 14th of October 2008 Prototyping of CCSDS SOIS services on 1553 Bus Sev Gunes-Lasnet, Olivier Notebaert.
Dokumentname > Folie 1 > Vortrag > Autor DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington.
Adrian Hooke, CESG Chair ESTEC, Noordwijk, Netherlands 27 Oct 2009 SERVICE ARCHITECTURE FOR SPACE: why this BOF? 1.
BITTT—Beijing Institute of Tracking and Telecommunications Technology
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
ESA UNCLASSIFIED – For Official Use MOIMS Plenary Darmstadt, Germany 09-12Nov15 Mario Merri, ESA/ESOC Brigitte Behal, CNES MOIMS Status, Issues and Vision.
CSTS Generic Procedures Assessment of the Current Status and Proposal for Next Steps M.Goetzelmann
CSS Splinter Session Notes -- File Transfer Oct
The Consultative Committee for Space Data Systems 1 JAXA CCSDS Status April 12 – 13, 2005 Kaneaki Narita Consolidated Space Tracking and Data Acquisition.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
Report to CCSDS AGENCY Note to CMC members: This template follows the CMC-agreed outline for agency reports Replace RED text with your agency’s name and.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
CMC meeting, 23 October, 2008 Page 1 JAXA CCSDS Status October, 2008 CMC Meeting DIN, Berlin, Germany Kaneaki Narita JAXA CCSDS Secretary Office.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Interplanetary Networking Issues Dai Stanton DTN working Group Input October 2009.
SISG ConOps Operational Functional Deployments Space Internetworking Strategy Group Peter Shames 22 Oct 2009 Version 1.6 DRAFT.
Standard Service Configurations 31 March – 3 April 2014 Noordwijkerhout, Netherlands John Pietras Global Science and Technology, Inc., Greenbelt, MD, USA.
National Aeronautics & Space Administration European Space Agency & 1 Modulation and Coding: Draft IOAG Resolutions to CCSDS September 9, 2008 Les Deutsch.
How would optics fit in CCSDS Stack?
Service, Physical, and Protocol View Document Figures
Systems Architecture WG: Charter and Work Plan
Recommended CCSDS actions in response to IOAG-11
BITTT and CCSDS in China
SLS AREA REPORT Goal: Next Generation Uplink WG
ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG)
SIS-DTN Forward Planning
JAXA CCSDS Secretary Office
Presentation transcript:

1 October 2009 Cross Support Transfer Services (CSTS) Future Services as of Spring 2014

2 October 2009 Future Services Overview Source: Assessment Date: 28/03/ CSTS Transfer File Service Priority 112/31/ CSTS Offline Radio Metric Service Priority 112/31/ CSTS Forward Frames ServicePriority 212/31/ Forward Synchronous Encoded Frame Service Priority 212/31/ CSTS D-DOR Data Service Priority 212/31/ CSTS Forward File Service Priority 3 12/31/ CSTS Return File Service Priority 3 12/31/ CSTS Return Unframed Telemetry Priority 312/31/2020

3 October 2009 Additional Identified Services or Service Extensions For ground station based CFDP architectures the working group members (NASA/ESA) reported the need to include the mission control system in the loop for all data uplinked to the spacecraft. In this case the CFDP PDUs (for NAK etc.) have to be transferred from the ground station to the mission control centre which in turn sends it back to the ground station via CLTU or FSP. However, for the transfer of the CFDP PDUs from the ground station to the mission control centre there is no suitable CCSDS service.

4 October 2009 CSTS Transfer File Service CSTS Transfer File Service Priority 112/31/2015 [CFXS] is a generic transfer file service allowing to transfer files between two units, and - on top of this generic service more specialized file services will allow requesting the dedicated processing for the file being transferred. Estimated Effort: Comments: Subject File Transfer BOF

5 October 2009 CSTS Offline Radio Metric Service CSTS Offline Radio Metric Service Priority 112/31/2015 It is assumed that a generic transfer file service allowing to transfer files between two units, i.e. [CFXS], will be available and - on top of this generic service more specialized file services will allow requesting the dedicated processing for the file being transferred. In this case, it is expected that the CSTS Offline Radio Metric Service will allow the Ground Tracking Asset to inform the Control Center about applied processing and file contents (i.e. Tracking Data Messages (TDM) according to the [TDM] standard specifying a format for use in exchanging spacecraft tracking data). Estimated Effort: Comments: Subject File Transfer BOF

6 October 2009 CSTS Forward Frames Service Priority 212/31/2018 Forward Internetworking for DTN, Forward Internetworking for IP, Return Internetworking for DTN, Return Internetworking for IP. Estimated Effort: Comments: The purpose as stated in Catalogue#2 should be updated Subject to CSTS WG based on CSTS SFW. This service includes Forward Synchronous Frame Service

7 October 2009 Forward Synchronous Encoded Frame Service Priority 212/31/2018 This Service enables a mission to send Frames to a spacecraft by allowing a Control Center to provide - in an asynchronous manner - a Ground Tracking Asset with encoded frames for uplink to a spacecraft in a synchronous manner. The Ground Tracking Asset will undertake to insert predefined idle frames in the absence of user supplied data. Estimated Effort: Comments: Included in Forward Frame Service. Does not have to be done as a separate service.

8 October 2009 CSTS D-DOR Data Service CSTS D-DOR Data Service Priority 212/31/2018 The CSTS D-DOR Data Service is to be written. It is assumed that a generic transfer file service allowing to transfer files between two units, i.e. [CFXS], will be available and - on top of this generic service more specialized file services will allow requesting the dedicated processing for the file being transferred. In this case, it is assumed that the CSTS D-DOR Data Service [DDORS] will implement delivery of newly defined D-DOR raw data transfer according to [DDRXF]. Estimated Effort: Comments: Subject File Transfer BOF. This is a specialised file transfer. The challenge of these files is the large file size (use of inverse multiplexing etc.). This service will be suitable to transfer open loop recordings.

9 October 2009 CSTS Forward File Service CSTS Forward File Service Priority 3 12/31/2020 This Service enables a mission to send the contents of a file to a spacecraft by allowing a Control Center to provide a Ground Tracking Asset with files for uplink. Within Catalog #1, usage of this service is limited to a spacecraft directly reachable from a Ground Tracking Asset (i.e. single hop space link) Estimated Effort: Comments: Re-discuss with IOAG if this can be confirmed. The required closed loop at the ground station does not seem to be the way mission want to operate.

10 October 2009 CSTS Return File Service CSTS Return File Service Priority 3 12/31/2020 This Service enables a mission to send the contents of a file to a Control Center by allowing a Ground Tracking Asset to provide a Control Center with files received from a spacecraft. Within Catalog #1, usage of this service is limited to a spacecraft directly reachable from a Ground Tracking Asset (i.e. single hop space link) Estimated Effort: Comments: Re-discuss with IOAG if this can be confirmed. The required closed loop at the ground station does not seem to be the way mission want to operate.

11 October 2009 CSTS Return Unframed Telemetry CSTS Return Unframed Telemetry Priority 312/31/2020 This Service enables a mission to send Telemetry (not presenting any standardized/known formatting to the service provider) to a Control Center. It relies on the same Space Link Interface Standards applicable to Return All Frames Service plus the following Space Link Interface Standards and Ground Link Interface Standards. - SLE Return Unframed Telemetry [RUFT] This service will accommodate legacy missions not compliant with most recent CCSDS space link standards and it shall not be offered to future missions. Estimated Effort: Comments: There is an ANSI standard that refines the RAF service to provide unframed telemetry.