Timing Issue for Mercury Target 2006. 6. 14 Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN) Adrian Fabich (CERN)

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

MERIT Pump/Probe Data Analysis Outline  The pump/probe program  Particle detector response correction  Pump/probe analysis results NFMCC Collaboration.
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
1 Optical Diagnostic Results of Hg Jet Target and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University Stonybrook.
J. Lettry A. Fabich 10th December INTC statement DRAFT The authors of this letter of intent propose to perform proof-of-principle tests of a high-power.
3D Target Simulations with Front Tracking/Ghost Fluid Method Wurigen Bo (Sept. 9, 2009) Brookhaven National Lab.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
1 Optical Diagnostic Results of MERIT (Mercury Intense Target) Experiment at CERN H. Park, H. Kirk, T.Tsang, K. McDonald, F. Ladeinde NFMCC Meeting Fermilab,
Optical Diagnostics Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no active electronics back.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
Scintillating Fiber Analysis of Secondary Particle Production H.G. Kirk (BNL) August 20, 2008.
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
SPS Syncrotron Telescope Software specifications Aurélie Goldblatt BE-BI-PM
1 Optical Diagnostic Results of MERIT Experiment and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University.
Motion Vocabulary. The act or process of changing position or place. 1.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
A. Fabich, CERN MERIT collaboration meeting, CERN, 7-8 February 2008 MERIT beam intensities, Feb 08A. Fabich, CERN1.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni 05/06/2012 LIU-PS meeting, CERN.
8/12/2000Guy Crockford BI days New application software for SPS wire scanner controls G.Crockford SL/OP.
OPERA Neutrino Experiment Tija Sīle presentation is based on: Doktorantūras skolas “Atomāro un nepārtrauktās vides fizikālo.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Harold G. Kirk Brookhaven National Laboratory Targetry Program Collaboration Meeting Columbia University June 11, 2003.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
RF improvements over the weekend Giulia on behalf of Delphine, Philippe, Andy and many other people in the RF team LHC Beam Commissioning Working Group,
November 15-18, 2002V. Obraztsov - Prague ECFA/DESY Workshop 1 Proposal for TESLA beam test zone at IHEP ( Protvino ) Vladimir Obraztsov Institute for.
1 Sample Presentation Movies (avi, gif) of the mercury jet under impact of a proton beam A.Fabich, CERN August 2004.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
Momentum slip-stacking of the nominal I-LHC beam in the SPS Particle simulations (preliminary) T. Argyropoulos, E. Shaposhnikova LIU-SPS BD WG 30/01/2014.
1 February 07, 2008 Simulation Status of Mercury Jet Target HeeJin Park.
AWAKE synchronization with SPS Andy Butterworth, Thomas Bohl (BE/RF) Thanks to: Urs Wehrle (BE/RF), Ioan Kozsar, Jean-Claude Bau (BE/CO)
1 NFMCC Friday Meeting January 4, 2008 Optical Diagnostic Results of MERIT Experiment at CERN HeeJin Park.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
CERN accelerator chain (operating and approved projects)
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
Challenges of Dual Harmonic RF Systems
Target R&D A.Fabich, CERN 30.July 2004 A.Fabich, CERN.
L4-PSB working group meeting 25/06/2009
Sparking of SPS electrostatic septa in presence of e-cloud
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Bell Ringer 9/8 Speed Displacement How Far How Fast & which Direction
of secondary light ion beams
Michael Benedikt AB/OP
MERIT beam intensities
Optical Diagnostics tight environment high radiation area
Status of muon monitor R&D and construction
2003 test beam with 25 ns bunched muons
Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN)
Present and Future test facilities for High-intensity Targetry CERN
Beam Stability of the LHC Beam Transfer Line TI 8
Presentation transcript:

Timing Issue for Mercury Target Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN) Adrian Fabich (CERN)

Super Cycle Structure ~20 s SC 1 SC 2 SC N ~20 s Δt= n (# of slot)×1.2s Super Cycle User MERIT User Cycle1 MERIT User Cycle2 User Cycle15 MERIT User Cycle n Super Cycle Length (Currently foreseen for 2007) 16.8s (FT) 18s (FT+CNGS commissioning) 22.8s (FT+CNGS LI) 34.8s (FT+CNGS HI) 43.2s (LHC filling) Run for days, 2006 Run for 30 min or test period

Beam Shape & Structure t=0 for MERIT Jitter : 250 ns B(t) Finalized with hardware PS User Cycle Extraction time 1.2 s time Bunch length : 50 ns 800 ms ~800ms ns warning xx (time delay to beam ms) : 2ms 50 ns Triggering Signal : TTL standard logic

Time Delay Proton Synchrotron Super Cycle : 20 s – Time Delay Distance ≈ 400 m Cable Delay = 5 ns/m = 2 μs/400m Beam Travel Delay = 3.3 ns/m = 1.32 µs/400m Signal to Beam Delay ≈ 1.32 – 2 = µs/400m Delay Unit Camera Trigger : n×1.2 s ms Magnet Trigger Hg Trigger MERIT 20 s SC for MERIT 20 s Signal to MERIT Beam Adjust at Next Beam Shot

Operation Flat Top Region of Magnetic Field : 8.5 s ~ 9.5 s (1 sec) ? What precision is required ? Tolerance ? V=20m/s 8.5 s Precision ? Tolerance ? Beam shot 9.5 s Beam shot Velocity Time Mercury Jet Velocity Profile at Target 10 s ? ? Flat Top Region of Steady Jet flow : 8.5 s ~ 9.5 s (1 sec) ?

Signal Sequence for Mercury Target 20 s Beam ΔtΔt Trigger Camera Trigger Hg Loop Trigger Magnet Trigger Detector Delay : Ex. 20 s – 9.0 s ± 1ms Low IntensityRegular Intensity Beam Inhibit (On/Off) Δt_start ≥ 3.6sΔt_stop No Beam to MERIT SC MERIT Beam Delay : 20s - n×1.2 s ms – Jitter -1μs ± 300 ns 20 s Δt≤3.6 variable Delay : 20s - n×1.2 s ms – Jitter -1μs ± 300 ns