Hilton Maher Selto 7 Managing Quality and Time to Create Value McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.

Slides:



Advertisements
Similar presentations
Implementing Quality Concepts
Advertisements

Performance Evaluation Using the Balanced Scorecard
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
 Return homework  Reliability  Solve problems: Chapter , 10  Cost of Quality  Solve problems: Chapter  Discuss final exam  Week 15.
Quality Cost Management
Quality BA 339 Mellie Pullman. Managing Quality Quality defined Quality assurance  Continuous improvement tools  Statistical quality control Total cost.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Quality, Time, and the Theory of Constraints Chapter 19.
Quality, Time, and the Theory of Constraints
Chapter 8: Quality Management Project Quality Management
Balanced Scorecard: Quality, Time, and the Theory of Constraints
Managing Quality 12 July Introduction What: quality in operations management Where: Quality affects all goods and services Why: Customers demand.
Performance Measurement and Strategic Information Management
Managing Quality and Time to Create Value
Copyright © 2015 Pearson Education, Inc. All Rights Reserved Balanced Scorecard: Quality, and Time.
Part Three TQM – The Tools and the Improvement Cycle
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Quality, Time, and the Theory of Constraints Chapter 19 May.
9-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 14 The Production Cycle.
The Management & Control of Quality
Copyright © 2003 Pearson Education Canada Inc. Slide Chapter 19 Cost Management: Quality, Time, and the Theory of Constraints.
© 2012 Pearson Prentice Hall. All rights reserved. Balanced Scorecard: Quality, Time, and the Theory of Constraints.
1 L U N D S U N I V E R S I T E T Projektledning och Projektmetodik, VBEF01 Kristian Widén Tekn. Doktor Avd. För Byggproduktion Inst. För Byggvetenskaper.
9 - 1 ©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 9 Management Control Systems.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 7 Managing Quality and Time to Create Value.
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
© 2012 Pearson Prentice Hall. All rights reserved. Balanced Scorecard: Quality and Time —modified by CB.
Managing Quality and Time to Create Value
Quality Prepared By: Ali Siddiqi.
COMPANYWIDE ASSESSMENT OF QUALITY
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 8 Performance Measurement and Strategic Information Management.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Costing and the Value Chain Chapter 18.
CHAPTER 4 Strategic Management of Costs, Quality, and Time
1 CHAPTER 18 MODERN DEVELOPMENTS IN MANAGING OPERATIONS.
Operations Management For Competitive Advantage 1 Quality Management Operations Management For Competitive Advantage Chapter 7.
© 2012 Pearson Prentice Hall. All rights reserved. Balanced Scorecard: Quality and Time —modified by CB.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
Chapter 11 – Part I Total Quality Management COB 300 Busing.
Quality and Quality Assurance IB Business and Management.
Objectives of Performance Measures 1.Establish base line measures and reveals trends 2.Determine which processes need to be improved 3.Indicate process.
Copyright © Houghton Mifflin Company. All rights reserved.1 Managerial Accounting 2002e Belverd E. Needles, Jr. Susan Crosson Multimedia.
9-1Management of Quality William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Management of Quality.
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses Chapter 4 Strategic Management of Costs, Quality, and Time Maher, Stickney and Weil.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University MANAGERIAL ACCOUNTING 10 TH EDITION.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
IB Business and Management 5.4 Quality Assurance.
Recent Issues in Management Dr. Syed Mohammad Tariq Zafar Chapter 3 - Total Quality Management (Continued)
TOTAL QUALITY MANAGEME NT (TQM). Total Quality Management TQM is a philosophy which applies equally to all parts of the organization. TQM can be viewed.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Quality Management.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
The Cost of Quality Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor of Industrial Engineering and Industrial Management Mercer.
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 9 1.
Chapter 12 Performance Evaluation Using the Balanced Scorecard.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 9 Management of Quality.
9 - 1 Chapter 9 Management Control Systems and Responsibility Accounting.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
CECE FICCI Quality Costs & Profit Chapter no.2 CECE FICCI Many people think that quality costs money and adversely effects profits. But these costs are.
8.1 Plan Quality Management
Balanced Scorecard: Quality, Time, and the Theory of Constraints
Hilton • Maher • Selto.
Fundamentals of Cost Management
Fundamentals of Cost Management
Project Quality Management
Part Three TQM – The Tools and the Improvement Cycle
Comments on Cost of Prediction Error (or Value of Perfect Information)
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

Hilton Maher Selto

7 Managing Quality and Time to Create Value McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.

7-3 Quality At Any Cost? Which is more important?

7-4 Customers will seek out the highest quality product. Improved quality that exceeds customer expectations will generate more revenues that exceed the cost of quality. Therefore, quality is “free”. Total Quality Management (TQM)

7-5 Total Quality Management (TQM) W. Edwards Deming proposed that improving quality reduces cost and improves profitability. Quality can be and should be improved continuously. Revenues Cost Max Profit Max Quality

7-6 Return on Quality (ROQ) Profit is maximized at the optimum quality level. The optimum quality level is always achieved before maximum attainable profit is reached. Revenues Cost Max Profit Optimum Quality

7-7 Lead Indicators of Quality Variation indicates poor quality. To measure variation, there are several tools that can be used: Histograms Run Charts Control Charts Defects A graphical display of the frequency distribution of attributes. Histograms

7-8 Lead Indicators of Quality Variation indicates poor quality. To measure variation, there are several tools that can be used: Histograms Run Charts Control Charts A graph showing trends in variation over time. Defects

7-9 Defects Lead Indicators of Quality Variation indicates poor quality. To measure variation, there are several tools that can be used: Histograms Run Charts A run chart with upper and lower control limits. Control Charts Notice that this process seems to be out of control on Fridays.

7-10 Diagnostic Information While lead indicators tell that there IS a problem, diagnostic tools help determine WHAT the problem is. Cause-and- Effect Diagrams Scatter Diagrams Flow Charts Pareto Charts

7-11 Cause-and-Effect Diagrams Defect = Late Deliveries Trucks Breakdown Flat Tire Drivers Don’t know the route Too slow Poorly Trained Other Road Conditions Rain or snow Ice Road Work Wrong directions from customer Sometimes called “fishbone” or Ishikawa diagrams

7-12 Scatter Diagrams A plot of two variables that might be related. A Patterns often indicates a causal relationship. This pattern indicates a causal relationship.

7-13 Flowcharts A graphical illustration of sequential linkages among process activities. Standardized symbols are used to represent decisions, actions, documents, and storage devices. A graphical illustration of sequential linkages among process activities. Standardized symbols are used to represent decisions, actions, documents, and storage devices.

7-14 Pareto Charts A histogram of causes of errors or errors arranged in order of frequency or size. Helps in prioritizing actions to address problems. Frequency of Complaint

7-15 Customer Satisfaction The degree to which expectations of product attributes, customer service, and price have been met or exceeded. Common tools for measuring customer satisfaction Phone Surveys Questionnaires Focus Groups # of Customer Complaints “Phantom” Shoppers Common tools for measuring customer satisfaction Phone Surveys Questionnaires Focus Groups # of Customer Complaints “Phantom” Shoppers

7-16 Cost of Quality (COQ) Costs associated with controlling quality. Costs associated with activities to correct failure to control quality. Out-of-pocket costs associated with quality generally fall into two categories:

7-17 Cost to Control Quality Prevention Activities that seek to prevent defects in the products or services being produced. Certifying Suppliers Designing for Manufacturability Quality Training Quality Evaluations Process Improvements Prevention Activities that seek to prevent defects in the products or services being produced. Certifying Suppliers Designing for Manufacturability Quality Training Quality Evaluations Process Improvements Appraisal Activities for inspecting inputs and attributes of individual units of product and service. Inspecting Materials Inspecting Machines Inspecting Processes Statistical Process Control Sampling and Testing Appraisal Activities for inspecting inputs and attributes of individual units of product and service. Inspecting Materials Inspecting Machines Inspecting Processes Statistical Process Control Sampling and Testing

7-18 Costs of Failing to Control Quality Internal Failure Costs associated with defects in processes and products that are found prior to delivery to customers. Disposing of Scrap Rework Reinspecting/Retesting Delaying Processes Internal Failure Costs associated with defects in processes and products that are found prior to delivery to customers. Disposing of Scrap Rework Reinspecting/Retesting Delaying Processes External Failure Costs associated with defects in processes and products that are detected after delivery to customers. Warranty Repairs Field Replacements Product Liability Restoring reputation Lost Sales External Failure Costs associated with defects in processes and products that are detected after delivery to customers. Warranty Repairs Field Replacements Product Liability Restoring reputation Lost Sales

7-19 Costs of Quality (COQ) It is easier to MEASURE the COQ in organizations that use ABC and ABM. COQ is not required to be reported in the financial statements. When COQ is reported, it is usually expressed as a % of sales.

7-20 Quality Awards and Certificates Japan European Community

7-21 Managing Time in a Competitive Environment Less time means quicker response to changing customer needs and to changing conditions of the marketplace. We need to reduce...

7-22 Measuring Results: Process Efficiency Process efficiency The ability to transform inputs into outputs at lowest cost. Process efficiency The ability to transform inputs into outputs at lowest cost. Production processes Result directly in the production of products or services provided to external customers. Production processes Result directly in the production of products or services provided to external customers. Business process Support or enable production processes. Business process Support or enable production processes.

7-23 Measuring Results: Process Efficiency High productivity High quality Low cycle time High throughput

7-24 Measuring Productivity Specific productivity measures compare:

7-25 Measuring Cycle Time The average time necessary to complete and deliver all good units and dispose of units that have to be reworked or scrapped because of defects.

7-26 Measuring Throughput Efficiency A measure of the amount of time spent adding value compared to the total cycle time.

7-27 Measures of Capacity It is possible for “capacity demand” to exceed practical capacity. Practica l Capacit y Process Capacity A measure of a process’s ability to transform resources into valued products and services.

7-28 Measures of Capacity Used Capacity is the amount of the practical capacity that is actually used. Used Capacity In some cases, “used capacity” can actually exceed “practical capacity.”

7-29 Managing Quality + Time + Productivity + Capacity = JIT The objective of JIT is to... purchase materials produce products and deliver products... just when they are needed. The objective of JIT is to... purchase materials produce products and deliver products... just when they are needed.

7-30 Managing Quality + Time + Productivity + Capacity = JIT The goal is to manage costs so that the savings associated with JIT exceed the cost of implementing JIT Cost savings: Inventory warehouse rent or cost Inventory managers and personnel Less warranty cost Cost savings: Inventory warehouse rent or cost Inventory managers and personnel Less warranty cost Implementation costs: Employee retraining Technology improvement Exposure to work stoppage risks. Implementation costs: Employee retraining Technology improvement Exposure to work stoppage risks.

7-31 Traditional “Push” Manufacturing - Example Computer Manufacturer Forecast Sales Order components Prepare Production Schedule Begin Production in Anticipation of Sales Make sales from finished goods inventory Store Inventory

7-32 JIT “Pull” Manufacturing - Example Computer Manufacturer Customer places an order Create Production Order Generate component requirements Production begins as parts arrive Goods delivered just in time Components are ordered

7-33 JIT Success Factors 1. Commitment to quality. 2. Flexible Capacity. 3. Reliable Supplier Relations. 4. Smooth Productio n Flow. 5. Well- trained workforce. 6. Reduced cycle and response times.

7-34 End of Chapter 7 Uh, Boss? My luggage was Just-in- Time, but I wasn’t!