1 Linking Resource Needs and Strategic Planning Dominic S. Haazen Lead Health Policy Specialist The World Bank ASAP – A Service of UNAIDS.

Slides:



Advertisements
Similar presentations
TVET working group contributions. What are the possible options for obtaining decent living and working conditions without joining the informal economy?
Advertisements

Linkages Between NPoA and MTEF
The concepts/mechanisms/tools for developing a Joint Programme: Critical issues and UNDG Joint Programme Guidance and formats.
Knowing if the RBF mechanism is working Incorporating Rigorous Impact Evaluation into your HRBF program Sebastian Martinez World Bank.
PEPFAR’s Approach to Maximize Efficiency, Effectiveness and Impact
Sustainability Planning Pat Simmons Missouri Department of Health and Senior Services.
An Introduction to Expenditure Analysis ~ an overview of the NASA methodology Teresa Guthrie Centre for Economic Governance and AIDS in Africa OSI Workshop,
Ray C. Rist The World Bank Washington, D.C.
Screen 1 of 24 Reporting Food Security Information Understanding the User’s Information Needs At the end of this lesson you will be able to: define the.
Progress in PRS Implementation: The Republic of Serbia Presented by Ivana Aleksić, Team Manager Poverty Reduction Strategy Implementation Focal Point Deputy.
Comprehensive M&E Systems
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
The participants should have understood the following basic principles: Integrating gender considerations into project design and implementation Assessing.
Presentation on Managing for Development Results in Zambia By A. Musunga Director M&E MOFNP - Zambia.
Performance Monitoring and Financial Reports Performance Monitoring and Financial Reports UNAIDS and Unified Budget and Workplan (UBW)
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
Tracking Expenditure for HIV and AIDS in Africa ~ Cross-Country Comparisons Guthrie, T., Kioko, U. Inaugural Conference of the African Health Economics.
Whistler 2020 Monitoring Program CSIN February16, 2006.
Expert Consultation on Costing HIV Responses in Asia - Pacific October 2010 Recap of Day 1.
WWF – World Bank Management Effectiveness Tracking Tool What is Management Effectiveness Evaluation? Sue Stolton.
Developing a result-oriented Operational Plan Training
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
Workshop on Programming in support of Anti-Corruption Agencies Bratislava, 30 June - 1 July 2009 A methodology for capacity assessment of AC agencies:
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
Statistics and cooperation: Rome, 24 November 2005 Statistics to Inform Development Policy: the Role of PARIS21 Presentation by Antoine Simonpietri, PARIS21.
IAOD Evaluation Section, the Development Agenda (DA) and Development Oriented Activities Julia Flores Marfetan, Senior Evaluator.
MKUKUTA/PER Consultations 2007 DPG session MKUKUTA/PEFAR 22 May.
1 Reduction to our parliamentary appropriations Our challenge doesn’t end there.
Rapid Assessment of District and Community HIV and AIDS Response Challenges, Constraints and Prospects Technical Review 2008 Rapid Assessment of District.
Building Capacity for effective government wide Monitoring and Evaluation Mr Oliver Seale M&E Learning Network Tuesday, 15 May 2007.
Intensifying HIV Prevention for young people Towards Universal Access By O. Mundida National BC Coordinator (NAC)
Community-Driven Development: An Overview of Practice Community Development Strategies – how to prioritize, sequence and implement programs CommDev Workshop.
Proposed Priority Actions By NSF Goals (before group work) By Rose Nalwadda 1 st February 2006.
Independent Evaluation Group World Bank November 11, 2010 Evaluation of Bank Support for Gender and Development.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
NSDS DESIGN PROCESS: ROAD MAPS & OTHER PRELIMINARIES Prof. Ben Kiregyera NSDS Workshop, Addis Ababa, Ethiopia 9 August 2005.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Africa Impact Evaluation Program on AIDS (AIM-AIDS) Cape Town, South Africa March 8 – 13, Steps in Implementing an Impact Evaluation Nandini Krishnan.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 Sequenced Information Strategy –incorporating short-term programme proposal Paris21 Consortium meeting : June 2000 Tony Williams UK Department.
ELEMENTS OF STRATEGY FOR ACHIEVING SOCIAL PROTECTION FLOOR Global Network, Cape Town 7 December 2012 BY AFRICAN LABOUR RESEARCH NETWORK (ALRN)
DEVELOPING THE WORK PLAN
HIV/AIDS A MAJOR DEVELOPMENT CONCERN FOR THE AFRICAN DEVELOPMENT BANK March 2008.
Tracking HIV/AIDS resources in-country: Institutionalization through capacity building and regional networks T. Dmytraczenko and S. De, Abt Associates.
Comprehensive M&E Systems: Identifying Resources to Support M&E Plans for National TB Programs Lisa V. Adams, MD E&E Regional Workshop Kiev, Ukraine May.
The Bank’s Regional HIV/AIDS Strategies An Overview.
Session 2: Developing a Comprehensive M&E Work Plan.
In the Framework of: Financed by: Developed by: Business Planning for Water Associations Prepared by Water Supply and Sewerage Association of Albania SHUKALB.
DHPI Approach at a Glance Facilitators’ Workshop on District Health Performance Improvement Lilongwe, 25 th – 27 th March 2015.
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 10. Evaluation.
African Agriculture Planning Scorecard. The challenge Wide variations in how African countries practice agricultural planning and budgeting Some practices.
Mainstreaming of a Child Centred Approach to Governance and Service Delivery Processes OFFICE ON THE RIGHTS OF THE CHILD PRESIDENCY REPUBLIC OF SOUTH AFRICA.
Introduction and Overview
A service of UNAIDS Jonathan Brown Georgia, September 2007
Project Cycle Management
Systems Analysis and Design in a Changing World, 4th Edition
& gender mainstreaming
The Logical Framework Approach
Introduction and Overview
GLOBAL PREVENTION COALITION
Progress in reforming budget elaboration process
Project Management Process Groups
THE SANAC RESEARCH SECTOR
Comprehensive M&E Systems
Multisectoral Response
Presentation transcript:

1 Linking Resource Needs and Strategic Planning Dominic S. Haazen Lead Health Policy Specialist The World Bank ASAP – A Service of UNAIDS

2 Why is such a linkage important? To ensure that the interventions included in the strategic plan are realistic and affordable To provide vital information to those managing and monitoring implementation of the strategy Expected vs. actual program coverage Physical resources needed vs. obtained Monetary resources needed vs. available

3 When are resource needs estimated? Estimating resource needs happens at different points in the process In theory, prioritization should precede the estimation of resource needs and the finalization of the strategy In reality, planning, prioritizing and resource estimation are interrelated and often done as iterative processes (initial estimates may show that too many actions have been prioritized relative to the available funds, that coverage levels are not feasible, or physical resources are no available )

4 Process – resource needs estimation

Approach 1: National Strategic Plan Activity-based costing Small team External consultants Standardised costs Accounting exercise Approach 2: Annual Action Plan Participatory Large team Wide stakeholder involvement Costs estimated by implementers Reviewing two approaches to estimating resource needs in Swaziland

6 Approach 1: Activity-Based Costing Approach based on: The Second National Multisectoral HIV and AIDS Strategic Plan 2006 – 2008 National Program of Action Urgent and Priority Agenda Dimensions: 4 components 104 sub-thematic areas 910 individual “actions” 215 actions in urgent and priority agenda document

7 This Approach Included: Priority setting exercise To reduce number of items to be costed Based on “gut feel” that entire plan was not affordable/feasible Identification and quantification of the target groups Detailed costing activity beginning with the highest priority activities (per ratings) also included Urgent and Priority Agenda activities

8 Priority Setting – Methodology 3 factors (applied at sub-thematic level) : Available Capacity for carrying out specific action (weight = 3) Immediate Benefit to those at risk, OVC, PLWHA, others; (weight = 2) Potential for Long-term Improvement in quality of life of PLWHA or their families, or reduction in infection rates (weight = 1)

9 Dimensioning Process Similar for all resource needs estimations: 1.Identify target populations 2.Determine number of beneficiaries by year for each action area and target population 3.Determine timing of any capital requirements and number of sites

10 Resource estimation process used 1.Develop a chart of accounts 2.Establish standard costs by account category 3.Develop the number of units per recipient/site 4.While costing individual action items, allow alternative standard costs, where appropriate; 5.Complete detailed description of activities/ assumptions to document process

11 Initial Results: All priority items: including scaling up in ARV therapy, PMTCT, nutritional support, education, micro-credit, housing and water

12 Swaziland Results – FTEs:

Approach 2: Participatory 3-month process to develop Annual Action Plan Consultant team facilitated planning and costing meetings with stakeholders 14 different implementing agents (e.g., PLWHA network, NGO network, business coalition, gov ’ t) Planning and budgeting workshops 1-2 days each, depending on capacity of each implementing partner and scale of its operations Individual plans then collated into 4 sector plans: Public, Private, Civil Society, Traditional Scrutiny, modifications and approval by national AIDS co-ordinating body (NERCHA)

Prioritisation Conducted by national AIDS coordinating body (NERCHA) Analyzed the main ‘ drivers ’ of the epidemic (i.e. the main factors influencing the spread or curtailment of the epidemic) Correlated main strategic issues in the National Strategic Plan with these drivers Identified series of primary goals and objectives that address the key drivers Result was list of 24 priority objectives to be tackled via 35 priority strategies

Resource needs estimation Some costs standardized, but most estimates took the form of trend planning based on knowledge of costs of similar previous activities Facilitators assisted participants to generate simple formulae Total Workshop Costs = [# of participants/facilitators x number of workshop days X workshop venue costs per person] + [number of participants x average transport cost] + [number of facilitators X number of preparation and workshop days X facilitation fee] + [budget for stationery and materials]

Experiences & Lessons Learned Unwise to ask people to cost activities when they do not have capacity/relevant experience Capacity building needs must be addressed Participatory approach takes longer but may be better at building capacity of broader audience Activity-based approach has greater potential to pass on high-level skills Both approaches require staff and consultants with strong capacity

Improved tools needed to support Activity- based approach Standardized costs speed up and simplify budgeting and can promote consistency; but some variations are essential Effective prioritization and optimal planning require targets/constraints without budget or other resource limits, planning and resource estimation easily becomes ‘wish-listing’ Resource tracking is an integral part of the planning, prioritization and costing process Experiences & Lessons Learned (2)

18 Overview of New Costing Model Need highlighted by Swaziland (& Guyana) experience Designed specifically to support the ABC approach Designed to complement to existing costing tools Incorporates key elements of existing models concept of target groups/coverage levels - RNM functional classification from NASA Logical menu-driven sequence of steps Level of detail up to the user: e.g., major drugs, laboratory supplies, other key cost items selected activities or comprehensive; all costs/activities

19 Overview of the Model (2) User can do variance simulations to live within resource constraints different coverage levels, unit cost reductions financial and HR implications of task shifting various combinations of activities Allows expenditure mapping to government accounting framework Facilitates use as a budgeting and financial monitoring tool – e.g., variance analysis Supports complete cycle of planning, budgeting, operations and evaluation

20 Model supports all parts of cycle

21

22 Who Should be Involved? StepType of Staff Entering Basic DataM&E, Program Targets and Coverage Levels M&E, Program, Management ** Chart of Accounts/MappingFinancial Map Strategic Plan to FunctionsProgram Costing Standard Interventions Financial, Program, Management ** Costing Special Interventions Review Total CostsManagement ** ReportingFinancial, Program ** Management involvement critical to ensure realism

23 Thank you