Veto Counter test Hyupwoo Lee 2007/06/18. Setup – cable length test 2 scope setup - recall Cable_Length.SET using floppy disk Section # -> C02, C08, C14.

Slides:



Advertisements
Similar presentations
Double Chooz: Outer Veto
Advertisements

COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Micromegas studies using cosmic rays Franck Sabatié May 7th 2009 Saclay cosmic ray bench Data acquisition system and analysis tools MIP detection Position.
Collaboration Meeting CERN, 6-10 Feb 2012 Collaboration Meeting CERN, 6-10 Feb 2012 Agustín Sánchez Losa IFIC (CSIC – Universitat de València)
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
Performance of MPPC using laser system Photon sensor KEK Niigata university, ILC calorimeter group Sayaka IBA, Hiroaki ONO, Paul.
Study of Photon Sensors using the Laser System 05/7/12 Niigata University, Japan Sayaka Iba, Editha P. Jacosalem, Hiroaki Ono, Noriko.
Tagger Microscope:  Performance Features Under Test Detector Alignment  Simulations show that when fiber axis is aligned to < 3 o of the e - trajectory.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
1 Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting June 20, 2007.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 24, 2007.
How We Became Experimentalists Suzanne Levine Saba Zuberi Len Zheleznyak REU 2002.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
The Oscilloscope: Basic Features & Functions  Source –Determines which signal is compared to the trigger settings.  Level –Determines where on the edge.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
Pulse Width Modulation Professor: Dr. Miguel Alonso Jr.
UM PPS Lab Activities PPS meeting October 9 and 16, 2012.
A feasibility study for the detection of SuperNova explosions with an Undersea Neutrino Telescope A. Leisos, A. G. Tsirigotis, S. E. Tzamarias Physics.
Trend ground array 1 1.General considerations 2.Study on the prototype detector 3.Inclined ground array simulation 4.Making work plan in 2014.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.
Use Agilent MSO9404A scope as DAQ system to measure APD time resolution with laser diode - Step by step instruction C. Lu Princeton University (3/30/2015)
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
Afterglow Studies Eric Torrence University of Oregon 183 nd LMTF Meeting 10 October 2013.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
PMT gain check at Indiana University. Test setup inside dark box LED white paper PMT # JT0298 channel #2 (per HPK numbering) OTHER CHANNELS MASKED WITH.
Frequency and Bandwidth A means of quantifying and interpreting media capacity.
Trip-t testing progress report
Status of photon sensor study at Niigata University -- SiPM and MPPC -- Photon sensor mini workshop 05/9/16 University Niigata University.
Status of the ETL 9125FLB Photomultiplier Tubes Steve Bache UNC-Wilmington.
Testing of C-layer bottom hole counters A.Ito, J.Negret, B.Satyanarayana.
1/10/2016Collaboration Meeting Feb 2011 Start Counter 1 Start Counter Update W. U. Boeglin L. Guo E. Pooser Measurements on EJ-212 scintillator bars Attenuation.
FADC Time Study EJ, HD 10/09. Purpose: to test Hai Dong’s firmware implementation of Indiana U. timing algorithm NOT meant to be a definitive study of.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Feb 24, Abnormal Events in HF: TB04, Simulation, and Feb.08 Fermi Testbeam Anthony Moeller (U. Iowa) Shuichi Kunori (U. Maryland) Taylan Yetkin (U.
XIII workshop on RPC and related detectors. GENT university, Belgium, Feb Wang Yi, Tsinghua University 1 Development and test of real-size.
The Lead Glass Detector Overview, Experience and Direction.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
S-2S meeting Toshiyuki Gogami 15 Oct Contents TOF detector Kyoto University.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
Xiong Zuo IHEP, CAS, for the LHAASO Collaboration
Resolution Study T. Bromwich FONT 8 September 2017.
Charge collection studies with irradiated CMOS detectors
Sassan Tabatabaei, Freddy Ben-Zeev and Michael Lee
Monitoring glitches in the frequency divider
Simulation and Reconstruction code using Mathematica
Sassan Tabatabaei, Freddy Ben-Zeev and Michael Lee
News on second coordinate readout
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
Conceptual design of TOF and beam test results
Time calibration Dmitry Chirkin, LBNL UC Berkeley, November 2004.
Efficiency Study of Prototype Scintillator for INGRID
Trigger issues for the CALICE beam test
Xiong Zuo IHEP, CAS, for the LHAASO Collaboration
Presentation transcript:

Veto Counter test Hyupwoo Lee 2007/06/18

Setup – cable length test 2 scope setup - recall Cable_Length.SET using floppy disk Section # -> C02, C08, C14 HV -> 1600V # of events averaged -> 256 Pannel #10 PMT -> PMT77 Thorn signal cable length for big pannel varies 323cm (x1, x2, x3) File names in compressed zip file i.e. p10_1_h16_C02_e256_x1.xls -> p(pannel#)_(PMT)_h(HV in 100V)_s(section#)_e(# of events averaged)_x(# of connected calbles for big pannel's signal).xls

Cable length Test As cable goes longer, signals are distorted a little, but it seems OK. As timing, shifting the signal is roughly matched with cable delay(5.5ns/m) Roughly small signal shows the same feature only but amplitude

Signals vs. time

About position

Peak amplitude vs. sections Total charge vs. sections

Time characteristic

Setup – Timing test 1 scope setup - recall timing.SET using floppy disk Section varies C02, C08, C14 (#8 at center and #1 is the nearest section to tested PMT) HV -> 1600V # of events for one data -> 1 Pannel #10 PMT -> PMT77 Thorn signal cable length for big pannel -> 323cm File names in compressed zip file i.e. p10_1_h16_s02_e32.xls -> p(pannel#)_(PMT)_h(HV in 100V)_(section#)_s(sample #).xls 2 different DAQ method - Taking waveform from scope (25 samples for each section) determine the timing 3 ways(slide #11). - Using math func. in scope (80 samples for each section)

Timing Test Standard deviation of timing(signal’s falling edge to trigger’s falling edge) is ~10ns Signals are delayed by the length between hit position and PMT.

Problem with scope math func.

Timing 1.10% Peak – From 10% of signal’s minimum V to trigger signal 2.10% Charge – From where accumulated charge reaches 10% of signal’s total charge to trigger signal 3.200fC – From where accumulated charge reaches 200fC to trigger signal

Timing vs. Section

Plan for Future Take data with both PMTs (Add two signals from both PMTs) Measure the white noise level in various circumstances(w/ filter or attenuator)? FEB test for veto wall