Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS (ENPRODUS) Managerial Issues.

Slides:



Advertisements
Similar presentations
Project reporting in FP6 Guidance notes for Integrated Projects, Networks of Excellence, Specific Targeted Research Projects, Coordination Actions.
Advertisements

European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
PREPARE Final reporting period Months February 2013 to 31 July 2014.
Key issues in project reporting Jakub Rutkowski Project Annual meeting , Hannover.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
UPP - Understanding Privatization Policy Management and organizational issues Luca Farinola 24/02/2006.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS NATIONAL TECHNICAL UNIVERSITY OF ATHENS SCHOOL.
ACCEPT project Grant Agreement FP7-SSH-2009-A.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS Contract Number: INCO-CT Starting.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 7 Scientific coordination First phase (M1-M6) QIUPING CHEN POLITECNICO DI TORINO STABLE.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Research Infrastructures Seminar for I3 and CA Project Co-ordinators 12 November 2004, 1 Management and Implementation of I3 and CA Contracts Seminar for.
Reporting requirements (2)
ESPON 2013 Programme Info Day on Calls and Partner Café Brussels, 10 May 2012 How to apply: Application Form and Eligibility A Decade of Territorial.
Info Day on New Calls and Partner Café Brussels, 8 September 2010 How to apply: Legal Framework - Application Form ( How to ensure that your proposal is.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
MELIA KICK-OFF MEETING 4th-7th September MELIA KICK-OFF MEETING September 4th-7th 2006 Ana Villacampa-CSIC.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
1 Framework Programme 7 Guide for Applicants
EU-IndiaGrid (RI ) is funded by the European Commission under the Research Infrastructure Programme 1 Project Reporting in FP6:
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
Ismar Financial and administrative procedures Nearest Kick-off meeting Bologna, 11 October 2006.
Annual reports Final report Dr. Cecilia Blasetti Elettra - Sincrotrone Trieste v.
Information on the ANNUAL REPORT OCTOBER 18 th, 2006.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) Kick-off Meeting June 8-10.
Volvox Finance 2 How we will manage the Finance Angela Pettit – Contracts Officer.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Financial reporting Linda Wormö, MA Per Dahlström, MA 1st October,2015 Kuopio, Finland.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
Slide 1 PAO MO75 M. Hugon D:/DATA/POWERPNT/HNML. 0107kickoffconcertedaction ADvanced Options for P&T ADOPT Thematic Network kick-off Meeting.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
TRANSITIONING TOWARD URBAN RESILIENCE AND SUSTAINABILITY Steering Committee Meeting WP 9 Financial Reporting Dublin, April 2013.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
EPOCA – 11. June EPOCA Project Management (WP1): Deliverables and reporting 11. June 2008.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
EGEE is a project funded by the European Union Overview of contract and FP6 procedures Fotis Karayannis EGEE SEE Fed. Representative in PMB, GRNET Zoi.
DIRAC Phase 1 Reporting, Dec. 1 st, 2005 Reporting to the Commission Periodic Reports Interim Activity Reports Project Deliverables Final Reports.
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
Reporting requirements - contractual and financial issues NGO Kick-off meeting Lorenzina Bruno, Senior Financial Officer Manuel Montero Ramírez, Project.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
2016 Annual Event ‘’H2020 NCPs Training’’ Minsk, March 2016 Project Management and Implementation IncoNet EaP is a project funded under the 7th European.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
Ismar Financial report procedures. Ismar Financial reporting For each reporting period of activity Each partner shall produce a “Periodic Management Report”
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
Avena genetic resources for quality in human consumption (AVEQ) Startup Meeting, Clermont Ferrand 2007 Federal Centre of Breeding Research on Cultivated.
UNISEC Universal Influenza Vaccines Secured
REPORTING THROUGH THE EMS
REPORTING THROUGH THE EMS
Annual Report Instructions
Reporting 25 April 2018.
FP7 SCIENTIFIC NEGOTIATIONS Astrid Kaemena European Commission
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
NEF Negotiation forms IT tool to support Negotiation (Participant Portal) Call FP7-ENV-2013-WATER-INNO-DEMO.
Technical and Financial Reporting
Presentation transcript:

Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS (ENPRODUS) Managerial Issues

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Management Structure of the Project EUROPEAN COMMISSION Project Coordinator Partner Representatives Partners Group Primary Contractor NTUA GR Project Committee  Reviewing Project Progress  Planning Future Objectives Project Coordinator: Contacting E.C. Scientific Responsible Presiding the Project’s Committee Monitoring the Project’s progress Compose the Consortium Reports Scientific publishing Partner representative: Contacting Project Coordinator Participate in the Project’s Committee Monitoring the Partner’s work progress Compose the Partner’s Reports

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Reporting of the Project Reporting Periods P1: from month 1 to month 12 (01/09/2006 – 31/08/2007) P2: from month 13 to month 24 (01/09/2007 – 31/08/2008) Partners Periodic Reports must be submitted to the Coordinator within 20 days after the end of each reporting period Consortium Periodic Reports must be submitted to the E. C. Scientific Responsible within 45 days after the end of each Reporting Period Partner’s Periodic Reports 1: Activity Report 2: Management Report 3: Financial Report 4: Deliverables Consortium Periodic Reports 1: Consortium Activity Report 2: Consortium Management Report 3: Consortium Financial Report 4: Consortium Deliverables to the Coordinator E.C. Scientific Responsible

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Activity Report Work Package Title: (e.g. WP1: Data collection and environmental problem assessment) Activity 1 - Title: (e.g. Mapping of the major metallurgical plants in Ukraine) A. Methodology:Description of the methodology followed for the implementation of the work. B. Results:Presentation of the results using tables, figures, graphs, etc. C. Discussion – Remarks:A short discussion on the results from a technical point of view, giving the conclusions concerning the work carried out and identifying the problems encountered during the implementation of the work together with the corrective actions taken D. Deviation from the Work Program:Information about the nature and the reasons for the problems related with deviation (if any) from the project workprogram and corrective actions taken/suggested. E. Future Work:Description of the work that has to be done in the next reporting period by the Partner, for the described activity (if any). Activity 2 - Title : Follow the same structure as in Activity 1. The Partner’s Periodic Activity Report should be written on a Work Package basis and per activity performed, as following:

ENPRODUS - Kick-off Meeting 30-31/10/ Athens The Partner’s Periodic Management Report A. Description of the work performed during the reporting period B. Major cost items and resources justification C. Deviations from cost budget and from person-months budget The Partner’s Periodic Management Report should include the following Sections:

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Management Report A. Description of the work performed during the reporting period A brief description of the work performed by the Partner, addressed at the workpackage level. The work specification should be detailed enough to justify the resources employed.

ENPRODUS - Kick-off Meeting 30-31/10/ Athens B. Major cost items and resources justification 1.Table (excel file) for the Resources Justification. 2.Explanatory note on any major cost items such as personnel costs, travel costs, consumable items, etc. justifying their necessity to the Project. 3.A tabular overview of budgeted costs and actual costs by major cost item and of budgeted person months and actual person months by workpackage. Structure of the Partner’s Periodic Management Report

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Management Report B. Major cost items and resources justification 1.Table (excel file) for the Resources Justification. 2. Explanatory note on any major cost items such as personnel costs, travel costs, consumable items, etc. justifying their necessity to the Project. 3. A tabular overview of budgeted costs and actual costs by major cost item and of budgeted person months and actual person months by workpackage.

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Management Report

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Management Report

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Management Report B. Major cost items and resources justification 1. Table (excel file) for the Resources Justification. 2.Explanatory note on any major cost items such as personnel costs, travel costs, consumable items, etc. justifying their necessity to the Project. 3. A tabular overview of budgeted costs and actual costs by major cost item and of budgeted person months and actual person months by workpackage.

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Management Report B. Major cost items and resources justification 1. Table (excel file) for the Resources Justification. 2. Explanatory note on any major cost items such as personnel costs, travel costs, consumable items, etc. justifying their necessity to the Project. 3.A tabular overview of budgeted costs and actual costs by major cost item and of budgeted person-months and actual person-months by workpackage. Budgeted costs of each Partner are given in Appendix I of Annex I of the Contract. √ √

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Management Report Budgeted person-months of each Partner by workpackage is given in page 27 of Annex I to the Contract. B. Major cost items and resources justification 1. Table (excel file) for the Resources Justification. 2. Explanatory note on any major cost items such as personnel costs, travel costs, consumable items, etc. justifying their necessity to the Project. 3.A tabular overview of budgeted costs and actual costs by major cost item and of budgeted person-months and actual person-months by workpackage.

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Management Report C. Deviations from cost budget and from person-months budget A summary explanation of the impact of major deviations from cost budget and from person- months budget, with reference to the Partner Periodic Activity Report, where the reasons for deviation from the Workplan have been explained.

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Financial Report FORM C – Financial Statement The main parts of Form C – Financial Statement are the following: General Information Box 1: Resources (Third Party(ies)) Box 2: Declaration of eligible costs Box 3: Declaration of receipts Box 4: Declaration of interest generated by the pre-financing Box 5: Request for FP6 Financial contribution Box 7: Conversion rates Box 8: Contractor’s certificate The eligible costs declared by the contractors in Form C must be in EURO.

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Structure of the Partner’s Periodic Financial Report FORM C – Financial Statement General Information

ENPRODUS - Kick-off Meeting 30-31/10/ Athens FORM C – Financial Statement Box 1 Structure of the Partner’s Periodic Financial Report

ENPRODUS - Kick-off Meeting 30-31/10/ Athens FORM C – Financial Statement Box 2 Structure of the Partner’s Periodic Financial Report

ENPRODUS - Kick-off Meeting 30-31/10/ Athens FORM C – Financial Statement Box 3 Structure of the Partner’s Periodic Financial Report

ENPRODUS - Kick-off Meeting 30-31/10/ Athens FORM C – Financial Statement Box 4, 5 and 7 Structure of the Partner’s Periodic Financial Report

ENPRODUS - Kick-off Meeting 30-31/10/ Athens FORM C – Financial Statement Box 8 Structure of the Partner’s Periodic Financial Report

ENPRODUS - Kick-off Meeting 30-31/10/ Athens Project’s Deliverables and structure Deliverables are written reports representing a verifiable output of the Project, which are subject to review by the European Commission. Deliverables and the timing of their submission are specified in Annex I to the Contract (the project Workprogram). The Workpackage Leader is responsible for the WP Deliverables and should submit them to the Coordinator on paper and electronically at the foreseen date, according to the Workprogram of the Project. The ENPRODUS Deliverables, responsible Partner and delivery date (project month): 1NTUAWP 5Consortium AgreementD5 24NTUAWP 4 The final version of the project Internet Website, including the results from the three local Workshops. D4 24NTUAWP 3 An Operational Plan focusing at the prevention of the regional ecosystem’s contamination from the generated metallurgical dusts in Russia and other NIS involved in the project. D3 18RWTH-AachenWP 2 A report providing all necessary information required for the designation of a frame for potential and feasible technological improvements in the target countries (Ukraine, Russia and Kazakhstan) facing the environmental problems related to the metallurgical dusts generation. D2 18URDIISPGWP 1 Inventory including detailed information on the environmental contamination related with the metallurgical dusts generation in Russia and other NIS involved in the project, as well as the Risk Assessment analysis. D1 Delivery date WP LeaderWPDeliverable nameDel. No The structure of each Deliverable should be as following: A.Introduction: a summary description of the Deliverable’s objectives, contractors involved, work performed, results achieved, intention for use and impact. B.Deliverable’s Description: detailed description of the Deliverable, including supporting materials such as photos, tables, graphs, etc. C.Conclusions D.References

ENPRODUS - Kick-off Meeting 30-31/10/ Athens For any further question or information feel free to contact: 1. Prof. Dimitrios Panias, Project Coordinator: Tel.: Fax: and 2. Ioanna Giannopoulou: Tel.: