Status of WWTF Nutrient Reduction Efforts For Narragansett Bay Angelo S. Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700.

Slides:



Advertisements
Similar presentations
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
Advertisements

Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
Water Quality Monitoring in the Urban Rivers and Upper Bay Presented by: Jennifer Cragan Environmental Scientist.
James River Chlorophyll Study Status Update: January 2015 House Agriculture, Chesapeake and Natural Resources Committee David K. Paylor, DEQ Director.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
Status of WWTF Nitrogen Reduction Efforts May 3, 2012 Angelo Liberti, Chief Surface Water Protection Office of Water Resources ext 7225
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Field Work in Support of Ecological Models Warren Prell - Historical Hypoxia based on benthic forams Candace Oviatt - Water Column Metabolism Warren Prell.
Imperial River: Water Quality Status and Basin Management Action Plan.
Chesapeake Bay Restoration An EPA Perspective Jeff Corbin Senior Advisor to the Administrator U.S. EPA.
Water Policy in the US and the EU K H Reckhow and C Pahl-Wostl Part I: US Total Maximum Daily Load Program.
Blackstone River Users Conference September 18, 2012.
Assessment of Narragansett Bay Waters using data from the Fixed-Site Water Quality Monitoring Network By Heather Stoffel University of Rhode Island- Graduate.
CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources ext 7225
Fixed-Site Water Quality Monitoring Network: Time Series Data throughout Narragansett Bay By Heather Stoffel URI/GSO October 2, 2006.
Status of WWTF Nitrogen Reduction October 2007 Angelo Liberti Chief of Surface Water Protection RIDEM Ext 7225
Assessment of Narragansett Bay Waters using data from the Fixed-Site Water Quality Monitoring Network By Heather Stoffel University of Rhode Island- Graduate.
Update on the Ecological Model: Box Model Version Mark Brush (VIMS) CHRP October 8, 2009.
CHRP SPATIAL SURVEYS OF DISSOLVED OXYGEN BROWN UNIVERSITY & NARRAGANSETT BAY ESTUARY PROGRAM.
The Risk of Hypoxia in Narragansett Bay A Synthesis of Available Data.
Allen Berthold Texas Water Resources Institute. Review: Clean Water Act Goal of CWA is to restore and maintain water quality suitable for the “protection.
Nutrient and Sediment Concentrations, Yields and Loads in Impaired Streams and Rivers in the Taunton River Basin, Massachusetts, Jeffrey R. Barbaro.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Lake Erie HABs Workshop Bill Fischbein Supervising Attorney Water Programs March 16, 2012 – Toledo March 30, Columbus.
Blackstone River Users Conference September 16, 2011.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Currents of Change Workshop Currents of Change Environmental Status & Trends of the Narragansett Bay Region May 1, 2009.
Water Quality Planning Division Monitoring & Assessment Section Surface Water Quality Monitoring Program (SWQM)
2014 Dissolved Oxygen Assessment CHRP Meeting December 17, 2014 Heather Stoffel.
Working with Stakeholders in Developing Watershed and Water Quality Models: The Dos and Don’ts Well, at least some of them! Presented by: Brian J. Watson,
Implementation Procedures (IPs) Brittany Lee Standards Implementation Team
Planning and Community Development Department Housing Element City Council February 03, 2014.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Anoxia in Narragansett Bay Can we predict it?.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Jason Krumholz, Candace Oviatt, Leslie Smith NEERS 4/13/2012.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
NWQMC July 26, 2005 Developing A National Water Quality Monitoring Network Design.
John Kennedy VA DEQ - Ches. Bay Program Mgr Tributary Strategies: Point Source Nutrient Controls Potomac Watershed.
Chesapeake Bay Program’s Baywide and Basinwide Monitoring Networks: Options for Adapting Monitoring Networks and Realigning Resources to Address Partner.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Narragansett Bay Environmental Monitoring Li-Ling Yang Roger Williams University.
Adem.alabama.gov ADEM’s Monitoring Summary Reports Alabama – Tombigbee CWP Stakeholders Meeting Montgomery, Alabama 3 February 2010 Lisa Huff – ADEM Field.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
Chesapeake Bay TMDL 2017 Midpoint Assessment: A Critical Path Forward Lucinda Power EPA Chesapeake Bay Program Office Citizens Advisory Committee Meeting.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
ANTIDEGRADATION and THE BENEFITS OF PUMP LOGS FOR BATCH DISCHARGES Given by: Dan Murray, Terrell Hendren and Josh Frazier.
Focus Group Meeting: November 12, 2013 Truckee River Water Quality Standards Review.
Nutrient Criteria Development for Rhode Island Estuarine Waters CHRP/Managers Meeting October 8, 2009.
Water Resources Workshop Standards, Use Attainability, Impairments and TMDLS Richard Eskin Maryland Department of the Environment February 20, 2004.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
High Rock Lake Nutrient Modeling Update Pam Behm - NC Division of Water Resources Environmental Management Commission Water Quality Committee Information.
CITIZENS ADVISORY COMMITTEE SPRING MEETING MARCH 1—2, 2012 CHARLOTTESVILLE, VA EPA’s Evaluation of Bay Jurisdictions’ Draft Phase II WIPs & Final
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Connie Brower NC DENR Division of Water Resources.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Texas Surface Water Quality Standards Update Joe Martin Water Quality Standards Work Leader Joe Martin Water Quality Standards Work Leader.
Update on PI Modeling and Nitrogen Removal at Blue Plains
GREAT BAY and NEW HAMPSHIRE WATER QUALITY STANDARDS
Water Quality Planning Division Monitoring & Assessment Section
Unresolved Reg 2 Issues and Triennial Review Preview Raymond E
Lake Erie HABs Workshop
Surface Water Ambient Monitoring Program
Water & Wastewater Equipment Manufacturers Association March 22, 2017
High Rock Lake TMDL Development
Water Quality Planning Division Monitoring & Assessment Section
Marco island water quality monitoring
Water Quality Planning Division Monitoring & Assessment Section
Presentation transcript:

Status of WWTF Nutrient Reduction Efforts For Narragansett Bay Angelo S. Liberti, Chief Surface Water Protection Office of Water Resources ext 7225

Surface Water Protection Major Program Responsibilities Designate Water Quality Classifications Establish Water Quality Standards Evaluate all waters for Compliance (Integrated Report) List Waters in violation of WQS (303d list) Develop Restoration Plans (TMDLs) Issue Permits Requiring Implementation (RIPDES etc.) Review Abatement Plans

State Water Quality Standards Reflected in DEM Water Quality Regulations Subject to EPA approval Consistent with national guidance; no less stringent Site specific criteria are allowed Criteria can account for naturally occurring conditions Current focus: nutrient criteria and biocriteria development

Current Estuarine DO Criteria Above a seasonal pycnocline, not less than 4.8 mg/l at any place or time more than once every three years, except as naturally occurs Below the pycnocline, instantaneous values below 4.8 are acceptable provided: –not less than 2.9 for any 24 hour period May 1-October 31 –Not less than 1.4 mg/l for more than 1 hour more than twice May 1-October 31 –cumulative exposure to DO less than 4.8 mg/l doesn’t exceed prescribed values.

Use Attainability Analysis Mechanism required under the Clean Water Act to reach a decision that a specific waterbody will not be able to achieve its designated uses Not widely used in New England Key factors in UAAs: Demonstration of widespread economic harm

UAA Example: Pawtuxet River Completed in early 1980’s for the Main Stem of the Pawtuxet River Revisited in response to a February 16, 1988 letter from the Mayors of Cranston and Warwick and the West Warwick Council President. –“ The theoretical water quality required for this use [propagation of fish] is impossible to meet …” –“… take whatever other steps are necessary to eliminate the need for advanced wastewater treatment plants along the Pawtuxet River.”

UAA Example: Pawtuxet River

Water Quality Assessment Process  TMDLs are not a prerequisite for issuance of discharge permits

Estuarine Waters Listed as Impaired (DO) Providence and Seekonk Rivers (since 1994) Potter Cove (1998) Greenwich Bay & Coves (1998) Upper Narragansett Bay (2000) East &West Passages (2008) Palmer River (1992) Wickford Harbor (1994) Pawcatuck (1994) Mt. Hope Bay (1998) Greenhill Pond (2002)

2008 Expansion of DO Impairment In its Intergrated Report on statewide water quality conditions, DEM expanded the area in the mid-bay designated as impaired due to low DO.

Current TMDL Schedule Estuarine DO Impairments Waterbody First listed Target for TMDL Palmer River Providence and Seekonk Rivers Wickford Harbor Pawcatuck River Mt. Hope Bay Potter Cove Greenwich Bay & Coves Upper Narragansett Bay Green Hill Pond West & East Passages

Early Focus: Providence and Seekonk Rivers “Available data show a marked lowering of dissolved oxygen levels in surface and bottom waters in the Providence River at least during the warmer months Reduced oxygen levels at times extend down Bay. (Olsen and Lee 1979) “The lowest oxygen values throughout the channel bottom were recorded on the August 8, 1980 sampling, those values were 0 to 3 mg/l all the way to Conimicut Pt.” (Oviatt ) SPRAY& SQUIRT Cruises – 7 surveys (high and low tide samples), 3 summer surveys of DO, June and August 1987, September 1989 Ave bottom oxygen all Providence and Seekonk River Stations: 3 mg/l –4 mg/l

Expanded Data Collection Efforts DEM – Total of 11 High and low tide surveys. –1995 extreme variations in oxygen and chlorophyll, periods where entire area is <4mg/l, bottom waters in significant portions of the Seekonk and Providence frequently 0-1 mg/l mid June-late September bottom DO rarely above 4 down to Conimicut Point, typically near 0 down to Sabin Pt. Insomniacs – multi-agency, monthly, overnight surveys , 2005 and continuing Fixed-Site Monitoring Network Expansion: DEM, in partnership with NERRS, the NBC and URI-GSO added stations: from 7 to 9 stations during the summer of 2003; from 9 to 12 summer of 2005; from 12 to NOAA- Bay Window – shuttle surveys; 1998-present, monthly bay- wide transects

Prior Modeling Efforts – Providence & Seekonk Rivers July -December 1989 – Narragansett Bay Project formed a Water Quality Model Technical Advisory Group and hired Limno-Tech to provide recommendations to the group. January 1990 – NBP held a workshop with stakeholders to discuss TAC recommendations and plan for development of a model to establish an abatement strategy Researchers at EPA Lab in Narragansett produced Providence Seekonk DO and Nitrogen Model (Dettman 1992) –Collection of additional data to support development of a time dependent model that includes phytoplankton

1992 – NBP hired Limno-Tech to enhance the model produced by Dettman (include impacts from phytoplankton and time variable predictions) –Model not designed to capture variability of short term events observed due to high algal productivity –Over 50% reduction in Nitrogen needed to produce an observable response (higher levels for significant response) –To improve model reliability need, additional data, improved understanding of advective flow variations and extend southern boundary of the model. –Reliability in the current screening model is substantial and provides good indication of the impact of reduced nitrogen loads on phytoplankton levels. DEM developed sampling program to support development of a time variable, three dimensional hydrodynamic/water quality model –formed TAC, Tetra Tech was hired to review past modeling efforts and the proposed sampling/modeling strategy. DEM engaged ASA to developed a linked hydrodynamics and water quality model held TAC meetings regarding model development. Problems encountered when modeling the interaction between the deep channel and shallow flanks of these water bodies, the mass transport component of the model system could not be successfully calibrated and validated.

Preliminary WWTF Nitrogen Reduction Plans RI WWTF Loading Reduction Analysis 7 WWTFs required to reduce ammonia agreed to reduce total N

Current Plan for Managing Nutrients Work was already underway Greenwich Bay Fish Kill – August 2003 Draft Plan for nutrient reductions (DEM, Feb. 2004) Governor’s Commission Report & Legislation – 2004 Adoption in law of goal of 50% reduction in N loadings DEM permits issued – June 2005

Revised WWTF Nitrogen Limits 5 mg/l –UBWPAD –Woonsocket –NBC-Fields Pt. –NBC Bucklin Pt. –East Greenwich –No. Attleborough –Attleboro –Grafton –Uxbridge –Northbridge –(max extent) Limits May – October, require operation of treatment to remove N to max extent possible November-April –East Providence –Cranston –West Warwick –Warwick –Smithfield (10 mg/l) –Burrillville (max extent) - Warren – anticipated to address impacts to the Palmer River 8 mg/l

Status of Compliance with Revised Permit limits for N RI WWTFs LimitStatusAve TN (mg/l) 5/07-8/08 Cranston 8 mg/lConstruction comp. –1/ Warwick 8 mg/lConstruction comp. -11/ West Warwick 8 mg/lConstruction comp. -7/ (7.5)* East Greenwich 5 mg/lConstruction comp.–3/ East Providence 8 mg/lFacilities Plan (FP) under DEM Review Construction Deadline 9/ NBC- Bucklin 5 mg/lInitial Construction Comp FP Due 4/ NBC -Field Pt 5 mg/lDesign Due 11/ Woonsocket 5 mg/lConstruction Comp Agreed to complete construction for 3 mg/l by 3/ * Excludes May data (19.5, 13 mg/l)

Status of Compliance with Revised Permit limits for N RI WWTFs (Cont.) LimitStatusAve TN (mg/l) 5/07-8/08 Burrillville Max extent TN Reductions since (7.7)* Smithfield 10 mg/lConstruction comp. -6/ Warren Anticipated that Warren will need to reduce N to address impacts to the Palmer River 17.7 Westerly Construction comp. 10/036.3 * Excludes May data (19.8, 24.0 mg/l)

Status of Compliance with Revised Permit limits for N MA WWTFs Upper Blackstone (UBWPAD) 5 mg/lEPA issued 8/08; appeals filed. Attleboro 8 mg/lEPA issued 6/08; appeals filed North Attleborough 5 mg/lEPA issued 2/08; appeals settled Grafton 5 mg/lNo action to date Uxbridge 8 mg/lNo action to date Northbridge NAEPA issued 9/06; reduce N to max extent

Significance of Massachusetts WWTFs Without reductions at MA WWTFs –Decrease in loading delivered to the Providence Seekonk River system will change from 59% to 39% below current levels. –Seekonk River: 57% reduction with full participation (loading factor is reduced from 23X to 10X) only 7% (to 21.5X) without reductions at MA facilities

Nitrogen Reduction Projections Nitrogen removal at 11 RI WWTFs - reduces their summer season nitrogen loading by 65%, dropping to 48% as WWTF flows reach approved design flows.

Current Status of Load Reduction Efforts 8 - WWTFs have complete upgrades ( 2 require additional modifications) 0 - Under construction 3 – Planning Underway NBC Bucklin Point Woonsocket East Providence 1 - Design Underway NBC Fields Point

Things on “Management’s Plate” What further reductions will be needed and where? “going to 3 mg/l” Establishment of new shellfish closure procedures in response to CSO tunnel. How best to update predictive tools to modify shellfish closure area procedures in response to sewer overflows and to develop monitoring strategies. How will CSO tunnel operations affect water quality beyond the control of pathogens? Manchester Street Power Station permit renewal

Side helpings… Need to better understand what is happening in Greenwich Bay; e.g. groundwater inputs. Does monitoring need to be modified to better answer questions about how the Bay’s ecology is changing?

Comparison of MERL Experiments to Providence/Seekonk System

Allowable Loading Condition

Table 4: Approved WWTF design flows and design flows used for the load evaluations. Evaluation of WWTF Load Reductions

Loading Condition Vs. WWTF Load Reductions

Loading Condition Vs. Cost

Anticipated RI WWTF Load Reductions

Average Chlorophyll vs N Load y = 0.62 x R 2 = Nitrogen Load (mmol/m 2 /d) Chlorophyll a (ug/l) 32 X 16 X 8 X 4 X 2 X 1 X C Allowable Loading Condition