© 2007 Pearson Education Process Analysis Chapter 5.

Slides:



Advertisements
Similar presentations
7 QC Tools.
Advertisements

Quality control tools
Overview of Lean Principles and Continuous Improvement Lean in Healthcare.
© 2007 Pearson Education Process Analysis Chapter 5.
4 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Analysis 4 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
Basic Seven Tools of Quality
4 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Analysis 4.
Seven Quality Tools The Seven Tools
Chapter 8: Project Quality Management
IES 303 Chapter 4: Process Analysis Week 4 Dec 1, 2005 Objectives:
Total Quality Management A Great Concept But What is IT ?
Chapter 6 - Total Quality Management
© 2007 Pearson Education Process Analysis Chapter 5.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
© 2005 Wiley1 Chapter 5 - Total Quality Management Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint Presentation.
To accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Fourth Edition  1996 Addison-Wesley Publishing Company, Inc. All rights.
Method Study Flowcharting.
Chapter 6 - Total Quality Management
© 2007 Prentice Hall, Inc. All rights reserved.7–1 Chapter 7 Operations Management and Quality.
Improvement-1. Continuous Improvement Check Do Act Plan Time Quality level Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
9-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Continuous Improvement. 2 1.Overview of the PDCA Problem Solving Cycle. 2.Foundations of the PDCA Cycle 3.Plan Step 4.Do Step 5.Check Step 6.Act Step.
Chapter 6, Process-Flow Analysis
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
Overview of DMAIC A Systematic Framework for Problem Solving
SEMESTER PROJECT ISE 250: Organizational Improvement Capabilities and Skills Instructor: Dr. Baruch I. Saeed Team Members: Ramachandran Janakiraman Emma.
Process Strategy & Analysis
Continuous Improvement Check Do Act Plan Time Quality level.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice-Hall, Inc. All rights reserved. Chapter 2 Process Management.
© 2005 Wiley1 Total Quality Management Chapter 5.
Overview of Total Quality Tools
Chapter 4 PF/CE/CNX/SOP.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 7: Process Strategy.
Quality Management Processes Plan Quality Management Perform Quality Assurance Control Quality.
4 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Analysis Chapter 4.
Operations Management Module 4 : Process Analysis S.Balachandran 2007 December 2007.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice-Hall, Inc. All rights reserved. Chapter 2 Process Management.
Process Analysis Process Flowcharting Types of Processes Process Performance Metrics OBJECTIVES.
4 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Analysis & Quality 4 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
1/34 Process Analysis. 2/34 How Process Analysis fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project.
A philosophy that involves everyone in an organization in a continual effort to improve quality and achieve customer satisfaction. Customer satisfaction.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 4: Process Analysis Objectives: Introduce some practical.
Process Analysis Chapter 4
Problem Solving.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Chapter 11 TQM & Quality Tools. Management 3620Chapter 11 TQM and Quality Tools11-2 Total Quality Management A philosophy that involves everyone in an.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
Workshop October 2015.
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
4 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Analysis 4 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
7 chapter Business Essentials, 7 th Edition Ebert/Griffin © 2009 Pearson Education, Inc. Operations Management and Quality Instructor Lecture PowerPoints.
© Wiley Total Quality Management by Adnan khan.
Seven Old Tools of Quality Management
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
© 2005 Wiley1 Total Quality Management Chapter 5.
Basic 7 Tools of Quality Presented by: Rajender Kumar, Asst. Prof.
OPERATIONS MANAGEMENT Dr. Hulya Julie Yazici, Lutgert College of Business Dr. Lisa Zidek, U.A. Whitaker College of Engineering Dr. Halcyon St Hill, College.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 2.
9,10 Quality Quality Control Ch. 9 Homework; 1, Add1
Chapter 07 Process Improvement
6 - 1© 2014 Pearson Education, Inc. Managing Quality PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition Principles.
OPERATIONS MANAGEMENT Process Management FGCU 1. PROCESS INITIALIZATION PROCESS DEFINITION PROCESS CONTROL PROCESS IMPROVEMENT PROCESS MANAGEMENT APPROACH.
Principles of Information Systems Eighth Edition
Continuous Improvement
Chapter 11 Total Quality Management and Continuous Improvement.
OPS/571 Operations Management
Quality Improvement: Problem Solving
Process Strategy and Analysis
Presentation transcript:

© 2007 Pearson Education Process Analysis Chapter 5

© 2007 Pearson Education How Process Analysis fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process Strategy Process Analysis Process Performance and Quality Constraint Management Process Layout Lean Systems Supply Chain Strategy Location Inventory Management Forecasting Sales and Operations Planning Resource Planning Scheduling

© 2007 Pearson Education Process Analysis  Process analysis is the documentation and detailed understanding of how work is performed and how it can be redesigned. 1 Identify Opportunity 1 Identify Opportunity 2 Define Scope 3 Document Process 3 Document Process 5 Redesign Process 5 Redesign Process 6 Implement Changes 6 Implement Changes 4 Evaluate Performance 4 Evaluate Performance

© 2007 Pearson Education A Systematic Approach to Process Analysis  Suggestion system: a voluntary system by which employees submit their ideas on process improvements.  Design team: A group of knowledgeable, team- oriented individuals who work at one or more steps in the process, do the process analysis and make the necessary changes.  Metrics: Performance measures that are established for a process and the steps within it.  Flowcharts: A diagram that traces the flow of information, customers, equipment, or materials through the various steps of a process.  Service Blueprint: A special flowchart of a service process that shows which steps have high customer contact (line of visibility).

© 2007 Pearson Education Flowchart for the Sales Process of a Consulting Company Service Blueprint

© 2007 Pearson Education Flowchart of a Nested Subprocess Client Agreement & Service Delivery Step

© 2007 Pearson Education Showing the Handoffs Between Departments

© 2007 Pearson Education Process Charts  Process chart: An organized way of documenting the activities performed by a person or group of people at a work station, with a customer, or on materials.  Five categories of process charts: 1.Operations that change, create or add something. 2.Transportation (materials handling): Moving something. 3.Inspection: Checking or verifying something. 4.Delays: Time spent awaiting further action. 5.Storage: When something is put away until a later time.

© 2007 Pearson Education Process Chart for an Emergency Room Admission 1XEnter emergency room, approach patient window 2XSit down and fill out patient history 3XNurse escorts patient to ER triage room 4XNurse inspects injury 5XReturn to waiting room 6XWait for available bed 7XGo to ER bed 8XWait for doctor 9XDoctor inspects injury and questions patient 10XNurse takes patient to radiology 11XTechnician x-rays patient 12XReturn to bed in ER 13XWait for doctor to return 14XDoctor provides diagnosis and advice 15XReturn to emergency entrance area 16XCheck out 17XWalk to pharmacy 18XPick up prescription 19XLeave the building Process: Emergency room admission Subject: Ankle injury patient Beginning: Enter emergency room Ending: Leave hospital Step no. Time (min) Distance (ft) Summary Number of steps Activity Time (min) Distance (ft) Step description Insert Step Append Step Remove Step Transport Operation523— Inspect28— Store——— Delay38—

© 2007 Pearson Education Evaluating Performance  Checklist: A form used to record the frequency of occurrence of certain service or product characteristics related to performance.  Histogram: A summarization of data measured on a continuous scale, showing the frequency distribution of some quality characteristic (the central tendency and dispersion of the data).  Bar chart: A series of bars representing the frequency of occurrence of data characteristics measured on a yes-or-no basis.  Pareto Chart: A bar chart on which factors are plotted in decreasing order of frequency along the horizontal axis.

© 2007 Pearson Education Bar Chart Example 5.1 The manager of a neighborhood restaurant is concerned about rising customer complaints. He would like to present his findings in a way that his employees will understand.

© 2007 Pearson Education Pareto Chart Example 5.1

© 2007 Pearson Education More Tools for Evaluating Performance  Scatter-diagram: A plot of two variables showing whether they are related.  Cause-and-effect diagram: A diagram that relates a key performance problem to it’s potential causes.  Sometimes called the fishbone diagram.  Graphs: Representation of data in a variety of pictorial forms, such as line charts and pie charts.

© 2007 Pearson Education Checker Board Airlines Example 5.2 Passenger processing at gate Late cabin cleaners Unavailable cockpit crew Late cabin crew Personnel Aircraft late to gate Mechanical failures Equipment Procedures Waiting for late passengers Weight/balance sheet late Poor announcement of departures Delayed check-in procedure Delayed flight departures Materials Late food service Late fuel Late baggage to aircraft Contractor not provided updated schedule updated schedule Weather Air traffic delays Other Analyzing Flight Delays Using a Cause-And-Effect Diagram

© 2007 Pearson Education They decide to use the following tools: The Wellington Fiber Board Company produces headliners, the fiberglass components that form the inner roof of passenger cars. Management wants to identify which defects were most prevalent and to find the cause. Wellington Fiber Board Co. Example 5.3 Step 1. Checklist Step 2. Pareto chart Step 3. Cause-and-effect diagram Step 4. Bar chart

© 2007 Pearson Education Example 5.3 Checklist Headliner Defects Defect typeTallyTotal A. Tears in fabric//// 4 B. Discolored fabric/// 3 C. Broken fiber board//// //// //// //// //// //// //// /36 D. Ragged edges//// // 7 Total50 Wellington Fiber Board Co.

© 2007 Pearson EducationCD A B Example 5.3 Pareto Chart Cumulative Percentage Number of Defects Defect type Wellington Fiber Board Co.

© 2007 Pearson Education Example 5.3 Cause-and-Effect Diagram Out of specification Not available Not available Materials Humidity Humidity Schedule changes Other Machine maintenance Machine maintenance Machine speed Machine speed Wrong setup Process Training Absenteeism Absenteeism Communication Communication People Broken fiber board Wellington Fiber Board Co.

© 2007 Pearson Education Example 5.3 Bar Chart Number of Broken Fiber Boards FirstSecondThird Shift Wellington Fiber Board Co.

© 2007 Pearson Education Redesigning the Process  Ideas for process redesign and improvement can be uncovered by asking six questions about each step in the process and about the process as a whole. 1. What is being done? 2. When is it being done? 3. Who is doing it? 4. Where is it being done? 5. How is it being done? 6. How well does it do on the various metrics of importance?

© 2007 Pearson Education  Answers to the previous six questions are challenged by asking still another set of questions.  Why is the process even being done?  Why is it being done where it is being done?  Why is it being done when it is being done?  Brainstorming is letting a group of people, knowledgeable about the process, propose ideas for change by saying whatever comes to mind. Redesigning the Process

© 2007 Pearson Education Benchmarking  Benchmarking is a systematic procedure that measures a firm’s processes, services, and products against those of industry leaders.  Benchmarking focuses on setting quantitative goals for improvement.  Competitive benchmarking is based on comparisons with a direct industry competitor.  Functional benchmarking compares functional areas in the firm with those of outstanding firms in any industry.  Internal benchmarking involves using an internal unit with superior performance as the benchmark for other units.

© 2007 Pearson Education Benchmarking Steps  Planning: Identify the process, service or product to be benchmarked and the firm(s) to be used for comparison. Determine the performance metrics and collect the data.  Analysis: Determine the gap between the firm’s current performance and that of the benchmark firm(s).  Integration: Establish goals and obtain the support of managers who must provide the resources for accomplishing the goals.  Action: Develop cross-functional teams of those most affected by the changes, develop action plans, implement the plans and monitor progress.

© 2007 Pearson Education Process Management Mistakes 1.Not Connecting with Strategic Issues 2.Not Involving the Right People in the Right Way 3.Not Giving the Design Teams and Process Analysts a Clear Charter and Then Holding Them Accountable 4.Not Being Satisfied Unless Fundamental “Reengineering” Changes Are Made 5.Not Considering the Impact on People 6.Not Giving Attention to Implementation 7.Not Creating an Infrastructure for Continuous Process Improvement.