CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 1 SOURCE CALIBRATION SOURCE CALIBRATION Status of Radioactive.

Slides:



Advertisements
Similar presentations
Pneumatic Cylinders Chapter 3.
Advertisements

Source Driver Status CMS Week November 2007 P. Debbins University of Iowa.
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Case-New Holland Steer-by-Wire Detailed Design. Today’s Agenda  Who is CNH?  Background  Project Goal  System Level Concept  Design Components 
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman.
CMS Experiment CMS Hadron Calorimeter - Arie Bodek
MICE Target Status Chris Booth Sheffield 10 th May 2006.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Andris Skuja: US CMS DOE/NSF Review: HCAL Subsystem Session May 20, 2003: Schedule, etc. 1 WBS 2 - Hadron Calorimeter Andris Skuja HCAL Schedule at CERN.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
HCAL Fall meeting Oct 11 to 13, 2004 HF assembly, commissioning and integration Ianos schmidt The University of Iowa.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
CMS HCAL, FIU Miami, February 24-26, 2005 Virgil Barnes, Purdue University 1 HCAL SOURCE SYSTEMS SOURCE SYSTEMS STATUS Virgil Barnes Purdue University.
CMS Radioactive Source Driver Systems Status and Action Items Paul Debbins University of Iowa October 14, 2005.
Schedule meeting May May 2011 THE DIFFUSER 1.Requirements 2.Description 3.Components 4.Trials 5.Schedule.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
PHOBOS TOF Construction Status
Vacuum system.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
RDMS CMS DataBases: Current Status, Development and Plans. D.A Oleinik, A.Sh. Petrosyan, R.N.Semenov, I.A. Filozova V.V Korenkov, P.V. Moissenz, A. Vishnevskii,
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
HF 2008 : Status and Plans CMS Week, February 2008 Aldo Penzo HCAL Commissioning Status (INFN-Trieste, Italy) (23 February 2008)
CM25 Engineering 1 4 Nov 2009 DIFFUSER Carousel (~50kg) Driven by air motors – 3 separate ‘actions’ 1.Carousel rotation 2.“30 degree rotation’’ Transfers.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Source Controller software Ianos Schmidt The University of Iowa.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
SNO Calibration System The SNO calibration source was designed to deploy sources into both the AV and light water volume between the AV and PSUP.
HF Source Drivers Performance Observations and Recommendations Paul Debbins University of Iowa Nov. 10, 2004.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
1 Source Driver Update Yasar Onel - iowa On behalf of Paul Debbins and Ianos Schmidt HCAL Run Planning Meeting 6 Nov
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
CMS ROC Report Patricia McBride May 26, 2005.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Easy-Cliner Manual Cable Version Assembly Instruction
ROBOX modification plans
Group CERN Taylan Yetkin Post-Doctoral Research Scholar.
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Magnetic measurements at ambient temperature on the MQXFBP1
Presentation transcript:

CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 1 SOURCE CALIBRATION SOURCE CALIBRATION Status of Radioactive Source Calibration Systems for CMS HCAL Alvin Laasanen Virgil Barnes Purdue University CMS HCAL Meeting, FIT, February 2002

CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 2 HB, HE SOURCE CALIBRATION HB Air-Motor Source Driver As tested at the Minnesota 4 Tesla MRI facility

CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 3 HB, HE SOURCE CALIBRATION HB Air-Motor Source Driver About to enter the Minnesota 4 Tesla magnet

CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 4 HB, HE SOURCE CALIBRATION Source Driver fully inserted Minnesota 4 Tesla MRI magnet

CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 5 HB, HE SOURCE CALIBRATION Status of permanent source drivers: An air-powered HB driver was tested at 1.5 Tesla in a Lafayette MRI facility, and made ready for final high-field testing (replace magnetic screws, replace magnetic microswitch springs with phosphor bronze ones, etc.) A highly successful 4 T test was done at Minnesota on December 14, Motors work satisfactorily when aligned within ~5 o of the field direction; degradation in speed is gradual with misalignment. Will try for best alignment to reduce wear, but there seems to be good tolerance on installation orientation. All other components function as intended (piezo-electric air valves, microswitches, rotary encoders, and air-piloted valves, in particular). Indexing, and wire extension/retraction into long multiply- bent tubes, all functioned well.

CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 6 HB, HE SOURCE CALIBRATION Permanent source drivers, contd.: Orientation of essential components is the same for HE. The control box and the two position counters worked when brought into 1 kiloGauss field, but the transformer hummed and vibrated rather heavily -- advisable not to run it long-term in such a high field. MRI magnets are always on. Insertion of the driver proved tricky due to large field gradients and associated forces and torques. At Minnesota we estimated over 100 pounds of force on the driver, while it was in the fringe field region. It was necessary to bolt the driver to the sliding table. These large translational forces will not be encountered in the HB and HE CMS installations, since the drivers will be mounted in ~homogeneous field regions. An irreducible minium of just under 1 pound of ferromagnetic material is in each air driver. OK’d by CERN management.

CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 7 HB, HE SOURCE CALIBRATION Permanent source drivers, contd.: Parts acquisition for 10 air drivers (HB and HE total) is being initiated. The order will include ample spares of special items such as vane motors, which will need periodic replacement or refurbishment; and empty source wires, which will be needed when the first round of Co-60 seeds have become too weak. We are working on final specifications of information needed for integration issues, especially for HE.

CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 8 HB, HE SOURCE CALIBRATION Plastic extension tubes for HB+ are at CERN. Christophe Jonckx is installing them, and optical cables, for the source-testing QC/QA and wedge commissioning in Bldg. 186, under Laza’s supervision Serguei Sergueev plans to meet with Alexei Sedov at Fermilab in February to adapt CDF multi- driver control and QIE-based source DAQ software for CMS summer 2002 test beam work.

CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 9 HF SOURCE CALIBRATION Mechanical system is well defined. Ianos Schmidt is overseeing assembly of HF prototype using standard 18-gauge source tubes. Two CDF-style source drivers are complete; two more are under construction. Drivers are at Iowa, Texas Tech. Bldg 186 drivers are available for HF use as well as HB, HE use CERN-safety-acceptable type for the electrical control cables needs to be chosen, and the cable lengths need to be defined.

CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 10 HF SOURCE CALIBRATION Labeling convention for HF plastic source tubes is needed, so that source driver index channels correspond to well-known locations in the calorimeter. Suggest that HF acquire a Kroy label-making machine and a supply of the printable shrink tubing (from Hanover Technical Sales, tel ) Purdue will supply 250 m of plastic tubing for summer test. Will eventually order 3.1 km of plastic tubing for HF, plus enough for all HE tubes and HB permanent extension tubes. Ianos is working on conduit design for the tube bundles.