Rev. 09/06/01SJSU Bus. 140 - David Bentley1 Chapter 6 – Process Selection and Facility Layout Process types and selection, automation, layout types, line.

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

C3 – THE IMPACT OF CAD/CAM ON MANUFACTURING Option C: CAD/CAM.
Chapter 6 Process Selection and Facility Layout.
Process Selection and Facility Layout
WEEK 04C – PROCESSES AND TECHNOLOGY (CH 6) Process types and selection, automation, line balancing SJSU Bus David Bentley1.
Flexible Manufacturing Systems (FMS)
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Operations Management Process Strategy Chapter 7
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Beni Asllani University of Tennessee at Chattanooga
Chapter 10 – Facility Layout
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2007 Pearson Education Computer-Integrated Manufacturing Supplement F.
Manufacturing Engineering Department Lecture 1 - Introduction
Process Selection and Facility Layout
Process Selection and Facility Layout
Process Selection and Facility Layout
Unit 2 - How Organisations Use ICT
Hasan Oben Pullu Dokuz Eylul University Industrial Engineering Department COMPUTER INTEGRATED MANUFACTURING (CIM)
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Selection and Facility Layout
Dr. Osama Al-Habahbah Automation Chapter 1 Introduction.
How does ISAT331 fit in the curriculum?
7-1 Copyright 2009, John Wiley & Sons, Inc. Chapter 7: Capacity and Facilities   Capacity Planning   Basic Layouts   Designing Process Layouts 
Chapter 10 – Facility Layout
Chapter 15: Computer-Integrated Manufacturing Systems
Computer Integrated Manufacturing (CIM). What is CIM? It is the manufacturing process done with the use of a computer for controlling the complete production.
Methods, Standards, and Work Design
Process (Job Shop) Layouts
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 5 Facilities To Accompany.
© 2006 Prentice Hall, Inc.7 – 1 Operations Management Chapter 5 – Process Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Chapter 10 – Facility Layout
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
6-1Process Selection and Facility Layout William J. Stevenson Operations Management 8 th edition.
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 6 Process Selection and Facility Layout.
Manufacturing Systems Manufacturing System Design & Control.
Process Layout Chapter 7 July 20, 2005.
Reid & Sanders, Operations Management © Wiley 2002 Facility Layout 10 C H A P T E R.
Operations Management Optimising operations. The aim of an OM system is to extract maximum productivity and quality from the production process. This.
Process Selection and Facility Layout. Process selection – Deciding on the way production of goods or services will be organized Major implications –
Process Selection and Facility Layout Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written.
6 Process Selection and Facility Layout. 6-2 Learning Objectives  Explain the strategic importance of process selection.  Describe the basic processing.
Facility Layout Objectives of Facility Layout Basic Types
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Computer Integrated Manufacturing Department of Industrial & Systems Engineering.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Industrial Automation and Robotics Mr. Muhajir Ab. Rahim School of Mechatronic Engineering UniMAP.
Facility Layout Chapter 10 pages , ,
ISLANDS OF AUTOMATION.
Principles of Operations Management
Cellular Layouts Cellular Production Group Technology
The University of Jordan Mechatronics Engineering Department
Flexible Manufacturing Systems
Chapter 6 Process Selection and Facility Layout
Week 13 COMPUTER INTEGRATED MANUFACTURING SYSTEM (CIMS)
Process Selection and Facility Layout
MENG 447 Manufacturing Systems Automation Chapter 1*
FACILITY LAYOUT Facility layout means:
Process Selection and Facility Layout
Introduction To CAD/CAM
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Operations Management
Process Selection and Facility Layout
Computer-Integrated Manufacturing
Presentation transcript:

Rev. 09/06/01SJSU Bus David Bentley1 Chapter 6 – Process Selection and Facility Layout Process types and selection, automation, layout types, line balancing

Rev. 11/20/01SJSU Bus David Bentley2 Process Selection Make or buy analysis (See pp ) Q BEP = FC / (p – v) Process types (“type of operations”) Project Job [Batch] Repetitive Continuous flow Volume, mix, flexibility considerations

Rev. 11/21/02SJSU Bus David Bentley3 Why Automate?

Rev. 05/13/02SJSU Bus David Bentley4 Why Automate? 1. Reduce or eliminate labor cost?? 2. Apply only to high volume operations?? 3. Keep up with the other CEOs at the Rotary Club?? 4. See the ads and say: “Wow, I’ve got to have one of those!”??

Rev. 09/06/01SJSU Bus David Bentley5 Why Automate? 5. Quality Assures consistency, low variability 6. Rapid change Shortens setups and changeovers Reduces time to turnaround prototypes 7. Lower tooling cost Eliminates specialized tools and dies 8. Reduced labor cost

Rev. 09/06/01SJSU Bus David Bentley6 Automation Concepts - 1 Product design CADD – computer aided drawing and drafting CAD – computer aided design Process design CAPP – computer aided process planning Machine control NC – numerical control CNC – computerized numerical control DNC – direct numerical control FMS – flexible manufacturing system CAM – computer aided manufacturing

Rev. 09/06/01SJSU Bus David Bentley7 Automation Concepts - 2 Production scheduling CAS – computer aided scheduling Service CAI – computer aided instruction Warehousing AS/RS – automated storage and retrieval systems

Rev.11/21/02SJSU Bus David Bentley8 Automation Concepts - 3 Robotics Heavy use in auto industry Described in terms of number of axes of motion (up to 6) Arm sweep Shoulder swivel Elbow extension Pitch (wrist) Yaw (wrist) Roll (wrist)

Rev.05/13/02SJSU Bus David Bentley9 Automation Concepts – 4 CIM – computer integrated manufacturing Integrates all the preceding concepts MAP – manufacturing automation protocol Major development in U.S. auto industry

Rev. 09/06/01SJSU Bus David Bentley10 Line Balancing Definitions Line balancing Balance work among production lines, or Balance tasks among workstations on 1 line Cycle time Materials Management: time from beginning of first operation until completion of last operation, or Industrial Engineering: time between completion of 2 units of product, or Line Balancing: Maximum time allowed at each workstation

Rev. 12/03/03SJSU Bus David Bentley11 Line Balancing Tools Cycle time calculation Output capacity ( OC = OT / CT ) Where OT = Operating Time per day, CT = Cycle Time Cycle time ( CT = OT/D ) Where D = Desired output rate Precedence diagrams Similar to network diagram Measures of effectiveness Balance delay (% of idle time) Efficiency

Rev. 09/06/01SJSU Bus David Bentley12 Layout Types Fixed-Position Process or Functional Product Cellular Mixed

Rev. 11/21/02SJSU Bus David Bentley13 Fixed-Position Product is in a fixed position (e.g., airframe, ship, building, highway, etc.) Resources (people, machines, material) come to the product Requires complex scheduling of resources High space requirements to accommodate resource movement Usually associated with the Project environment

Rev. 11/21/02SJSU Bus David Bentley14 Process or Functional Groups similar resources together by the function or process performed Machine examples are: milling machines, lathes, routers, grinders People examples are: Invoicing, Accounts Payable, Payroll Processing Many crossed paths, high space requirements Easy to supervise, train, etc. Usually associated with the Job and sometimes the Batch environments

Rev. 12/05/02SJSU Bus David Bentley15 Product Resources are arranged to follow the flow of the product Examples are: auto assembly, steel production, bottling, etc. Often called production lines or assembly lines May be straight line, U-shaped, snake Provides for very little WIP storage Usually associated with Repetitive and Continuous Flow environments

Rev.11/21/02SJSU Bus David Bentley16 Cellular Resources (labor and equipment) arranged in small groups (cells) Have responsibility for output, quality, maintenance, etc. for a grouping of tasks or parts Referred to as “teams” in services sector Teamwork essential May be straight line or U-shaped; no WIP storage Most recently developed layout Usually associated with Repetitive environment

Rev. 11/21/02SJSU Bus David Bentley17 Mixed Two or more layout types in 1 facility Examples Manufacturing: burn-in or baking Restaurants (kitchen is functional, buffet line is product, menu ordering is fixed-position) More difficult to plan More costly to equip More troublesome to maintain

Rev. 11/21/02SJSU Bus David Bentley18 U-Shaped Advantages Staff flexibility and balance Teamwork Immediate rework Accessibility Work and tool distribution Linking with other U-shaped layouts