Communications / Design Process n Communications and Design Process Teams Combined – Many original team members absent – Many new team members – BAS, Teac,

Slides:



Advertisements
Similar presentations
Introduction to Project Management Principles Pimol Moth.
Advertisements

Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
Advanced Energy Vehicle
PROCESS FRAMEWORK Lecture - 3. Topics covered PROCESS FRAMEWORK PROCESS MODELS DIFFERENCE.
Program Management Office Department of Innovation & Technology City of Boston Kickoff Meeting.
Seat/IFE Integration Workshop
SEP1 - 1 Introduction to Software Engineering Processes SWENET SEP1 Module Developed with support from the National Science Foundation.
DEVELOPING A TECHNOLOGY PROJECT IN STUDENT AFFAIRS A Guide to the Process Paul Schantz November, 2010.
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
1 Implementing School-wide PBS. 2 Objectives Identify tools to help implementation in your school Identify the focus of your initial team meetings Identify.
Program Management Overview (An Introduction)
Defining the Project Chapter 4.
COMMUNICATIONS GROUP SOUTH AFRICAN AIRWAYS, UNITED AIRLINES, EMIRATES, WEBER AIRCRAFT, LUFTHANSA, INFLIGHT PERIPHERALS, SICMA AERO SEAT, LABINAL AERO SYSTEMS,
ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case.
Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
HKU Faculty of Education1 Project planning Seminar 4 BSIM0011 Project Management.
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
In the Framework of: Financed by: Developed by: DANUBE WATER PROGRAM GRANT NO. 46 DEVELOP A TRAINING COURSE FOR THE PREPARATION OF A STRATEGIC BUSINESS.
BSBPMG506A Manage Project Human Resources 9.1 Develop Human Resource Plan The process of identifying and documenting project roles, responsibilities, required.
CIS 499 Senior Seminar IT project management. Exercise. Write a testable problem statement in subject verb format. Who? Are the people going to use this.
Business Systems Development SDLC and introduction to the Microsoft Solutions Framework Team and Process Models.
Travel Website Enhancement Project Project Update First Name Last Name.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Scope Management Chapter 5.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
Ch. 5: Project Planning Good Quote: Plans are only good intentions unless they immediately degenerate into hard work Lame excuses for not planning: Takes.
Quad Chart Presentations Guidelines and Template.
People Capability Strategy Stream
Confidential and Proprietary © 2002 All rights reserved. October 19, 2015 Texas Market Notification Update.
Project Plan. Project Plan Components Project Overview – Description and Strategy Business Case Summary Key Deliverables and Scope Critical Success Factors.
Project Charters Module 3
Scope Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 5 Learning Objectives After completing this chapter,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
{ Phases of Project & life cycle Prepared by: Syed ShahRukh Haider.
PSCIOC-PSSDC Workplan Coordination Strategy– Draft Coordination Committee Telecon
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG.
PQRI Proposed Work Plan Title of Work Project Date of Submission to Steering Committee.
Project Charter
February 21, 2000 Kimberly Pastega February th WAEA Workshop Seat/IFE Integration Team Members: Steve Normington.
eMerger Integration Planning
Project Kickoff Meeting May 29, Transforming the Way Government Builds Solutions.
WAEA Technology Committee [June 13-14, Seattle Washington] File: rich/tc-sea/introduction_salter.ppt TECHNOLOGY COMMITTEE & WORKING GROUP MEETINGS June.
Project Management Process
Stages of design  High level design  High level data structure  Architecture  Low level design-code design  Algorithms  Low level data structures.
Managing programs that promote personal effectiveness.
P r o j e c t : from INITIATING to CLOSING ( 1 ).
SLIDE 1 Title of the project Member 1 ( Reg. No) Member 2 ( Reg. No) Member 3 ( Reg. No) Place : Duration : Half sem/ Full sem Guide Internal/External.
Concepts/ definitions/ meanings of program plan, program scheme, program development, concept paper Program plan is a systematic arrangement of elements.
Middle Fork Project Relicensing Process Plan April 25, 2006.
Program Management Team Framework Strawman Vancouver June 2001 Sprint PCS ®
Page 1 TESLA Upcoming Events / Advanced Category / 23,000’
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Project Charter 1.Overview / Background Section 2.Governance / Authority Section 3.Approach Section.
Moderator: Randy Gillis, Black Knight Financial Services Panelists: Mark Kleingers, Black Knight Financial Services Mick Smothers, Capco September 12,
MGT 449 Week 3 Learning Team Strategic Quality Management and Customer Satisfaction Paper To purchase this material click below link
CPMGT 300 Week 3 Learning Team Planning Process Groups and Developing the Scope Check this A+ tutorial guideline at
Come and be a member of our website.
قانون المنافسة ومنع الاحتكار
By Jeff Burklo, Director
Lockheed Martin Canada’s SMB Mentoring Program
Application for UMP Accelerator Programme
H. Implementation Plan.
Project Overview.
Project Name TEAM MEMBER 1 NAME TEAM MEMBER 2 NAME TEAM MEMBER 3 NAME
Planning for Design Project
Presentation transcript:

Communications / Design Process n Communications and Design Process Teams Combined – Many original team members absent – Many new team members – BAS, Teac, NWA, MAS, RCPS, KID, Weber, Airbus, Telefonix, – Discussed pros and cons of combining – Developed new mission statement and focus

Communications/Design Development Mission Statement: To define a Process and Vehicle that will identify roles, responsibilities, activities and information required from all participants to support the total program from pre-kickoff to aircraft delivery

Deliverables Group Deliverables: n Program Definition Guide (pre-ICTM) n White Paper for providing Guidelines : – Overall Program Management Activities – Data and Information – Communication – Roles and Responsibilities n Responsibility Chart - Contractual n Checklists

Program Definition Guide ICTMPDRCDRFAI A/C LAUNCH ICTMPDRCDRFAI A/C LAUNCH Typical Existing Program Enhanced Program Add this program definition activity

Program Definition Guide Vehicle: Program Definition (before ITCM) n Meeting or Telecon or Website or ??? – Establishing Roles and Responsibilities – Identifying Suppliers – Identifying Definition Requirements – Defining Contractual Requirements – Listing Participants: Names, Functions, Organizations – Proposed Timeline/ Schedule (Program Flow) – Schedule for receipt for ITCM information

White Paper n Detailed process description n “How To” guide for tools (checklists, responsibilities chart)

Responsibility Chart MAS Weber PL Porter Schott Primex Tenzing TEAC Airshow Boeing/Airbus

Checklists n Identify existing industry milestone checklists (PDR, CDR, FAI) – Airbus / Boeing – MAS – RCPS n Compile checklists for use as tools

Schedule for Deliverables n Program Definition Guide (Dan Vargas, TEAC) – Strawman completed 6/14/00 – Group review by 6/26/00 – Post on WAEA working group website by 7/1/00 n White Paper (open) – Release strawman by x/xx/00 – Group review by xx/xx/00 – Post on WAEA working group website xx/xx/00

Schedule for Deliverables n Responsibility Chart (open) – Complete strawman by xx/xx/00 – Group review by xx/xx/00 – Post on WAEA website by xx/xx/00 n Checklists (Robert Steed, BAS) – Complete strawman by xx/xx/00 – Group review by xx/xx/00 – Post on WAEA website by xx/xx/00