K.Furukawa, Apr.21.2005, Super B-factory Workshop SuperKEKB Injector Linac 1 Injector Linac Kazuro Furukawa, for e – /e + Linac Group Present Status Upgrade.

Slides:



Advertisements
Similar presentations
KEK : Novel Accelerator TYL Workshop M. Yoshida, M. Nozaki, K. Koyama, High energy research organization (KEK) -Collaboration -IZEST (CEA) :
Advertisements

USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
RF-Gun cavity for high charge electron generation Takuya Natsui.
1 Luminosity of cm -2 s -1 at KEKB Preliminary plan Machine parameters RF system Vacuum system Injector Y. Ohnishi KEK Snowmass2001.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK) M. Yoshida, K. Nakajima, M. Sato, S. Matsumoto, M. Nozaki,
Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
Accelerator Summary Apr. 22, 2005 K. Hawai`i.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
The Linear Collider – accelerator design A particle beam accelerator is a microscope – the resolution is inversely proportional to the energy of the beams.
R.Chehab/Posipol2008/Hiroshima, june POSITRON SOURCES USING CHANNELING FOR ILC & CLIC R.Chehab, X.Artru, M.Chevallier, IPNL/IN2P3/CNRS, Universite.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Low Emittance RF Gun Developments for PAL-XFEL
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
1 Positron Target R&D at KEK Plan and Status AD&I Meeting 2009/8/27 KEK Hybrid Target Test at KEKB Linac Liquid Lead Target Test at ATF Linac Window Test.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Injector Commissioning Masanori Satoh (Accelerator Laboratory, KEK) for the Injector Linac Commissioning Group The 20th KEKB Accelerator Review Committee,
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
K.Furukawa, KEK, Nov Injector Linac Progress towards SuperKEKB Progress of Injector Linac Kazuro Furukawa for Injector Linac 1.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
Progress of Injector Linac
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University March 2011 ALPG11 Eugene Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
Status of the Compton Experiment at the ATF TILC09 18-April-2009 T.Takahashi Hiroshima University for collaborators.
Capture and Transport Simulations of Positrons in a Compton Scheme Positron Source A. VIVOLI*, A. VARIOLA (LAL / IN2P3-CNRS), R. CHEHAB (IPNL & LAL / IN2P3-CNRS)
Positron capture simulation for 300Hz electrondriven scheme M. Kuriki, Y. Seimiya, T. Takahashi (Hiroshima U.) T. Okugi, M. Sato, J. Urakawa, T. Omori.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
ICFA Workshop on Future Light Source, FLS2012 M. Shimada A), T. Miyajima A), N. Nakamura A), Y. Kobayashi A), K. Harada A), S. Sakanaka A), R. Hajima B)
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
X-band Based FEL proposal
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
S.M. Polozov & Ko., NRNU MEPhI
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Positron Sources of Next generation B-factories (SuperKEKB, SuperB)
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Abstract EuSPARC and EuPRAXIA projects
Test of Hybrid Target at KEKB LINAC
Alternative/complementary Possibilities
Status of the CLIC main beam injectors
NC Accelerator Structures
Brief Review of Microwave Dielectric Accelerators
CEPC injector high field S-band accelerating structure design and R&D
Injection facility for Novosibirsk Super Charm Tau Factory
SuperB project. Injection scheme design status
Overview of SRF system of Ring and Linac (1)
Capture and Transmission of polarized positrons from a Compton Scheme
Electron Source Configuration
ERL accelerator review. Parameters for a Compton source
Status of the CLIC Injector studies
LAL meeting on e+ studies, Oct. 2010
CEPC Injector Damping Ring
Injector: What is needed to improve the beam quality?
CEPC Injector positron source
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
J. Seeman Perugia Super-B Meeting June 2009
Kicker and RF systems for Damping Rings
SuperKEKB required (e+ / e-)
Presentation transcript:

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 1 Injector Linac Kazuro Furukawa, for e – /e + Linac Group Present Status Upgrade in the Near Future (Crystalline Target and Simultaneous Injection) C-band R&D towards SuperKEKB

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 2 Electron/Positron Injector Linac  Machine Features  600m Linac with 59 S-band rf Stations, most of them Equipped with SLED to provide 20MeV/m  Dual Sub-Harmonic Bunchers to achieve 10ps for 10nC, and Energy Compression System for Positron  Beam Characteristics  8GeV 1.2nC Electron and 3.5GeV 0.6nC x2 Positron for KEKB  2.5GeV 0.2nC for PF, 3.0GeV 0.2nC for PF-AR Present Status

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 3 Linac in KEKB Commissioning  Challenging Projects each year since 1998  Commissioning (1998~)  Overcoming rf Breakdowns at the Bunching section and Positron Capturing section (1999~2000)  Positron Injection with Dual Bunches in a Pulse (2001~2002)  Reduction of Failure Rate with Careful Management of the Equipment and Beam Parameters, especially at rf Trip Rate (2002)  C-band R&D for the Future SuperKEKB (2003~)  Continuous Injection of both Positron and Electron Beams (2004)  Recent Operation  About 7000 hours/year  Machine-trouble time (when some part of the machine is broken): 2~3%  Beam-loss time (when beam could not be delivered): ~0.5%  Routine management of rf Power, rf Phasing, Optics Matching, Energy Spread Optimization  No Reliability degradation observed after Introduction of Continuous Injection Present Status

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 4 Increase of the Injection Efficiency May.2000 Apr.2003 Dual Bunch e + Feb.2005 Continuous Injections Present Status

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 5 Positron Generation with Crystalline Tungsten (Collaboration between KEK, Tokyo Metro. Univ., Hiroshima Univ., Tomsk Polytech., LAL-Orsay)  High Intensity Positron is Always a Challenge in Electron-Positron Colliders  Positron Production Enhancement by Channeling Radiation in Single Crystal Target was Proposed by R. Chehab et. al (1989)  The Effect was Confirmed Experimentally in Japan (INS/Tokyo, KEK) and at CERN Crystalline Positron Target

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 6 Experiment at KEK  Positron Production Enhancement Measurement  Target Thickness Dependence (2.2, 5.3, 9mm for Tungsten Crystal, 2 ~ 28mm for Amorphous)  Out-going Positron Energy Dependence (5 ~ 20MeV)  Incident Electron Energy Dependence (3 ~ 8GeV)  Single Target (a) or Hybrid Target (b)  Target other than Tungsten, Silicon, Diamond, etc. Crystalline Positron Target Tungsten

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 7 Typical Experimental Measurements Crystalline Positron Target 2.2mmW c 9mmW c 2.2mmW c 9mmW c Amorphous W Crystal W e + base yield on-axis off-axis

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 8 Results and Considerations  With Tungsten Single Crystal, the Absolute Positron Yields were Enhanced by ~26% at E e+ =20MeV, and by ~15% (average) in the range of E e+ = 5~20MeV compared with the Maximum Yield in the Amorphous Tungsten.  Diamond Hybrid Target has been Suggested to Produce 3- Times more Photons (V.N.Baier et al.), but We need >15mm Thick Diamond while We could test only 5mm. And the Radiation Damage is Unknown.  Another Experiment is Planned just before 2005 Summer Shutdown to Refine the Results, and The Optimized Crystalline Tungsten is Planned to Replace the Present Positron Target. The Design of the Target is Under way. Crystalline Positron Target

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 9 Upgrade Towards Simultaneous Injection (Collaboration Working Group between PF, KEKB, Linac and Others)  Status and Requirements  One Linac is shared between 4 Storage Rings (Time Sharing)  Switching between KEKB and other Modes takes ~3 minutes because ECS (Switching) Magnets have to be standardized.  Machine Studies in PF and/or PF-AR Interrupt the KEKB Continuous Injection.  PF Needs Top-up (Continuous) Injection in the Future for Advanced Measurements.  Possible Solution  Simultaneous Injection Scheme is Strongly Suggested.  Beam Switches pulse-by-pulse could be Employed.  Needs Pulse Bending Magnet to Kick PF Beam Simultaneous Injection

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 10 Fast Beam Switches  Fast Change of the Magnetic Field is Difficult  Common Magnetic Field (Quad and Steering Magnets) should be Used.  Energy Adjustment can be Achieved with Fast Low-level rf Controls.  With Additional Circuits and Controls.  The Beam is Accelerated to ~5.3GeV then further Accelerated up to 8GeV for KEKB, or Decelerated down to 2.5GeV for PF. Preliminary Test by Y.Onishi "2.5 GeV" e - optics8 GeV e - optics Energy = 2.7 GeV (SC61H)  x = 3.6x10 -4 m  y = 6x10 -5 m Energy = 8 GeV (SC61H)  x = 2.5x10 -4 m  y = 4x10 -5 m Simultaneous Injection

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 11 Upgrade Overview  It was decided to be Carried out as Soon as Possible.  Upgrade would be Carried in 3 Phases  Phase-I: Construction of New PF-BT Line Summer 2005  Phase-II: Simultaneous Injection between KEKB e – and PF e –  Phase-III: Simultaneous Injection including KEKB e + (,PF-AR)  Control / Timing Systems will be upgraded during Phases Simultaneous Injection

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 12 PF Beam Transport Optics Design  The New PF-BT Optics Design is Fixed  Spare Parts are Collected based on the Design, if Exists  Other Components are being Designed or being Fabricated  Phase-I Components (except Pulse Bend) will be Installed at this Summer Simultaneous Injection Energy Spread Monitor

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 13 C-band R&D towards SuperKEKB with 8GeV e +  Higher Luminosity in SuperKEKB  (1) Squeezing Beta at Interaction Region  (2) Increase of Beam Currents  (3) Crab Cavities  (4) Exchange of Energies of Electron/Positron to Cure e-Cloud Issues  etc.  For Linac (4) is the Major Challenge as well as (2)  Higher Gradient Acceleration with C-band Structure is Considered to Achieve 8GeV Positron  ~24 rf Stations will be Converted  From: Single S-band rf Station + 2m x 4 Acc Structure = ~160MeV  To: Dual C-band rf Station + 1m x 16 Acc Structure = ~320MeV ==> 8GeV Positron will be Provided  Dumping Ring to Meet the IR Design will also be Employed C-band R&D

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 14 Linac for SuperKEKB  Energy Upgrade for 8GeV Positron with C-band  Intensity Upgrade  Faster Beam Switching with Kickers, etc.  Smaller Trans./Long. Emittance for IR Design with Damping Ring  Between Positron Production Target and C-band Accelerating Sections  FODO with Alternating Bends; Large Acceptance and low  C-band R&D

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 15 Advances in C-band R&D  Apr.2002-Aug  Design and Installation of  First rf Station  First Acc. Structure  Basically Scale down of S-band One  First Accelerated Beam (Oct.2003)  ~38MV/m at 43MW  Sep.2003-Aug  Design and Installation of  First LIPS type rf Compressor (SLED)  TE038 mode  Further Improve for Real Operation  Accelerated Beam with rf Pulse-Compressor  ~42MV/m at ~56MW (12MW from Kly.) C-band R&D 2 years ) 7 months )

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 16 C-band Components  Klystron & Pulse Modulator  Non-PPM design Klystron, Stable enough. Asking another Company  Compact Modulator (1/3 size), IGBT breakdown Issues Solved  rf Window  Mix (TE11+TM11) mode Traveling Wave, 300MW Transmission  rf Pulse Compressor  TE038 mode (instead of TE015), Q 0 =132,000, 200MW Achieved at Test Station  Accelerating Structure  Based on half-scale of S-band Structure  2/3  Traveling-wave, Quasi-constant-gradient, Electroplating  Simple Design, a few Trips / hour Observed  Expected to be Solved in the This Summer  rf Low-level and booster Klystron  Temporary Installation, may be Modified in Real Operation C-band R&D

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 17 C-band Components C-band R&D Inverter DC PS C-band section S-band section RF compressor - TE038 type MW achieved at Test Stand. - Multiplication factor: 4.7 times at peak. C-band modulator & klystron - Reliable Operation Now Mix-mode RF window - TE11 +TM MW transmission power is achieved. Prototype of C-band Section - Field gradient 42MV/m with RF compressor.

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 18 Improvements in Coming Summer  Four Accelerating Structures are under Fabrication  Designed in KEK, and Fabricated in KEK or MHI  Several Features are Applied especially at Coupler  Standard or Non-standard (Full-length) Coupler Cell  Thick and Smooth Shape Coupler Iris  Coupler Axis offset for Field Correction  Electro-polishing at Coupler  Constant Impedance C-band R&D

K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 19 Summary  Operational Improvements and Future Projects are Carried with Balancing between them  Continuous Injection Surely Improved KEKB Luminosity  Simultaneous Injection Project will Help both KEKB and PF Advanced Operation, and also Other Rings in Future  Oriented Crystalline Positron Target may Enhance Positron Production  C-band R&D for SuperKEKB Advances Steadily in relatively Short Term, and the Results seem to be Promising Summary