1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

Group Meeting 03/02/2004. Format of Weekly Group Meeting  Daily chore  Research report: electronic presentation required  Journal report.
Time Projection Chamber
TPC status Marian Ivanov. Outlook TPC performance ExB correction Alignment Nonlinearities and edge effects Drift velocity calibration.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
HLT & Calibration.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
HLT Collaboration (28-Jun-15) 1 High Level Trigger L0 L1 L2 HLT Dieter Roehrich UiB Trigger Accept/reject events Select Select regions of interest within.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
STAR Collaboration Meeting, Nantes, July2002 SVT Analysis/Status Update Jun Takahashi – University of Sao Paulo.
7/19/2004FTPC Review - J. Seyboth1 FTPC Review - Software Janet Seyboth for the FTPC group DAQ Online Calibration Databases Offline Documentation FTPC.
FTPC calibration status Joern Putschke for the STAR FTPC group STAR Analysis Meeting 2002 October 22-24, 2002.
SLAC 7-10 Jan. 2004M. Ronan - Micromegas TPC1 Micromegas TPC Magnetic field cosmic ray tests Review of previous Micromegas studies Review of previous Micromegas.
1 TPC online  offline calibration November 2002.
Leroy Nicolas, HESS Calibration results, 28 th ICRC Tsukuba Japan, August Calibration results of the first two H·E·S·S· telescopes Nicolas Leroy.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
JT: 1 The Berkeley Lab STAR TPC Distortions in the Transverse Plane: An Update Jim Thomas.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
PHOS calibration in CDB framework M.Bogolyubsky, Y.Kharlov B.Polichtchouk, S.Sadovsky IHEP, Protvino ALICE off-line week 3 October 2005.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
PHOS offline status report Yuri Kharlov ALICE offline week 7 April 2008.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
LASER CALIBRATION SYSTEM for STAR TPC Alexei Lebedev (BNL) for STAR collaboration  Design and description  Performance  Goals and results  Future developments.
TPC in Heavy Ion Experiments Jørgen A. Lien, Høgskolen i Bergen and Universitetet i Bergen, Norway for the ALICE Collaboration. Outlook: Presenting some.
PHOS offline status report Dmitri Peressounko ALICE offline week,
Nigel Watson / BirminghamCALICE ECAL, UCL, 06-Mar-2006 Test Beam Task List - ECAL  Aim:  Identify all tasks essential for run and analysis of beam data.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
TPC ExB distortion at LHC-ALICE experiment Yasuto Hori for the ALICE-TPC collaboration Center for Nuclear Study, University of Tokyo 1.
EMCAL : Online Software Status 1) General info/intro 2) DCS-related: detector configuration, Data Points 3) DAQ: Detector Algorithms 4) QA, AMORE 5) Offline-related:
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Nov 2002T. Ljubicic DAQ100 Calibration Needs 10 to 8 bit (and back!) conversion table Gain correction per pad T0 correction per pad.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
Non-photonic electron production in p+p collisions at √s=200 GeV Xiaozhi Bai for the STAR collaboration Central China Normal University University of Illinois.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
The ALICE Experiment Event by Event fluctuations ALICE TOF Calibration 30th November 2007Chiara Zampolli1.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
FTPC calibration status & plans for Y03 Joern Putschke for the STAR FTPC group STAR Calibration Meeting 2002 November 7, 2002.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Christian Lippmann (ALICE TRD), DPG-Tagung Köln Position Resolution, Electron Identification and Transition Radiation Spectra with Prototypes.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
15 December 2015Alan Norton, NA62, LKR WG 1 LKR Calibration Topics for 2016 Pedestals Pulser Calibration Bad Channels Time Calibration Small Pulses LKR.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.
Data Analysis Practice looking for Φ(1020) Nuclear Physics Ⅲ Kyung-Eon,Choi.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
AliRoot survey: Calibration P.Hristov 11/06/2013.
Particle Identification of the ALICE TPC via dE/dx
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
The NA61 TPCs (1) Overview: Mechanics readout Position resolution
Marian Ivanov TPC status report.
TPC Commissioning: DAQ, ECS aspects
The Silicon Drift Detector of the ALICE Experiment
TOF CALIBRATION DATABASE
ALICE – First paper.
Commissioning of the ALICE HLT, TPC and PHOS systems
HLT & Calibration.
TPC sector alignment Marian Ivanov.
CMS Pixel Data Quality Monitoring
Bi-Weekly Meeting 2004/09/08 Susumu Oda
Presentation transcript:

1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration data (real events and calibration triggers) –Calculation of a (first) set of calibration parameters –Applying calibration to online event reconstruction –Storing parameters in relevant databases Procedures are being developed in collaboration with TPC, PHOS and Dimuon detector HLT is open for calibration tasks for all participating detectors

2 TPC calibration (1) Pedestal runs –Accumulation of empty black events –Configuration of FEE with averaged pedestal values –Monitoring of pedestal quality/stability –Minimal computing needs, no storage of pedestals in database (perhaps initially in FERO DB) –This task could also be executed on LDCs Pulser runs –Accumulation of pulser events –Gain calibration and timing alignment –Map hot/dead pads

3 TPC calibration (2) Drift velocity map –Nuclear collisions –Accumulate charge per timebin –Calculate charge step at central electrode –E.g. NA49 data NA49 charge step

4 TPC calibration (3) Laser runs –Online reconstruction of laser tracks –Drift velocity map Electron attachment / gas contamination –Online reconstruction of particle tracks / laser tracks –Cluster charge loss per drift length

5 TPC calibration (4) Space charge effects –Online reconstruction of tracks –Histogram of track impact parameters –E.g. STAR TPC – fluctuations on second timescale

6 TPC calibration (5) –Histogram of track residuals –E.g. STAR TPC – grid leak distortions »Ion leakage at gating grid gap

7 PHOS online processing Pulse shape analysis –Amplitude -> Energy –Timing -> TOF –reduces data volume by a factor of ~25 Gamma-2 fit Peak Method : Offline time reference at peak ( y’ =0 ) Slope Method:Offline time reference at max. slope ( y”=0 ) (both reference points are amplitude independent)

8 PHOS calibration (1) Pedestal runs –Accumulation of empty black events –Configuration of FEE with averaged pedestal values –Monitoring of pedestal quality/stability LED runs –Accumulation of pulser events –Gain calibration and timing alignment –Map hot/dead channels

9 PHOS calibration (2) Gain/energy calibration –Using particle data –Online pulse shape analysis –Timing alignment (using fastest particles) –Online reconstruction and accumulating of showers –Relative gain calibration by equalizing channels –Absolute energy calibration by monitoring pi0-peak