GLAST LAT Project July 12, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.

Slides:



Advertisements
Similar presentations
GLAST LAT Instrument 1 Summary of Progress  Completed TVAC with no additional reboots  Ran refresh rate test showing that the refresh rate was not an.
Advertisements

GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 7 of 12 EMI/EMC 1 GLAST Large Area Telescope LAT Pre-Shipment Review EMI/EMC Michael.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review TVAC at NRL? Status July 12, 2007 Neil Johnson.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
Troubleshooting methods. Module contents  Avaya Wireless tools  Avaya Wireless Client Manager  Avaya Wireless AP Manager  Hardware indicators  Non.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope:
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
SQL Database Management
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project July 12, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering Joe Cullinan Quality Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

GLAST LAT Project July 12, 2007 NCRs and Waivers 2 LAT Test Status EMI –Updated flag status in next chart, EMI break of config charts follow End to end test (Systems perspective) –Identified several minor issues which can be easily resolved –Method of operation was a distinct improvement over the first instrument sim The LAT engineering team was able to focus on the instrument with Elizabeth calling the procs Telemetry display pages continuing to improve and provide data relevant to a proc on a single or small number of pages –Working on several proposals to speed power up Cal and tracker bias as one command each rather than 16 commands each Option to not use dwell if we have the high rate downlink If there is enough power margin, powering the LAT fully when the grid heaters are still drawing power would simplify and potentially shorten the LAT power up sequence FSW upload/regression test –File upload hampered by command failures Hardline and RF, Spacecraft A and B sides Scripts were robust (kudos to On-Line) and minimized the impact of the dropped commands –Uploads were completed, continuing on to the regression tests on Side 1

GLAST LAT Project July 12, 2007 NCRs and Waivers 3 EMI Flag Status 35 flags were LAT related (LAT team assessment) –23 flags closed 6 closed to QARs –EMI susceptibility in calorimeter (Waiver generation in process) –EMI susceptibility in temp sensors (Waiver generation in process) –XLHP temp sensor –3 QARs against GD EGSE –12 remain open 3 document tlm issues (dropped and glitchy) –Kurt working through our lists with Tim to look for unexpected dropouts 6 were science data related (none during EMI susceptibility sweeps) –Rich and Bryson continuing review and feeding information back to GD »We can locate potentials for SSR-UDL dropped frame issues, but do not have all the information to confirm the 4000 frame symptom »We have seen additional cases where the RE test operations resulted in SSR files that confused the pipeline ingest process 2 document commanding issues (not during sweep) –GD working, these 2 attributed to the TURFTS rack 1 documents LAT response to GBM (GBM power up triggered LAT response, not EMI related) –Reviewing earlier cases

GLAST LAT Project July 12, 2007 NCRs and Waivers 4 EMI Overview LAT EMI testing showed no significant susceptibilities –Two susceptibilities detected which will not impact on-orbit operations A significant volume of data was collected and has all been reviewed –There were 331 runs during the EMI testing –Those runs collected over 100 million events Non EMI related items are in work with the Spacecraft team

GLAST LAT Project July 12, 2007 NCRs and Waivers 5 Review Process The LAT data review is a three tiered process, with feedback to monitor completion of the discipline expert data review Samples of data reviewed at end of presentation Tier 1 – Test Engineers –Monitor pass/fail, limits and any error/warning messages –For EMI, added low rate science counters to check for increased event activity due to EMI Tier 2 – Systems Engineers –Review every run Test report if applicable Message logs Science data reports (Digi report) –Review housekeeping telemetry daily –Developed tools to monitor GPS lock and telemetry dropouts Tier 3 – Discipline Experts –Monitor data flow through the offline processing –Monitor subsystem performance

GLAST LAT Project July 12, 2007 NCRs and Waivers 6 EMI Issues Known susceptibilities (based on the LAT level EMI test) –Tracker susceptibility at 100 MHz –Minor temp sensor susceptibility at 30MHz to 100MHz Observed susceptibilities –Calorimeter susceptibility at 280MHz –Minor temperature susceptibility at 30MHz to 100MHz –Tracker susceptibility at 100MHz was not seen

GLAST LAT Project July 12, 2007 NCRs and Waivers 7 Calorimeter Susceptibility Symptoms of susceptibility observed near 280 MHz, both polarizations –Excess CAL triggers and occupancy in phase with 1 kHz pulse modulation of RF test equipment Predominantly in 4 towers near (+X,+Y) corner Excesses seen only within ~10 us of leading edge of RF pulse –Transmitter uses 1 kHz pulse modulation with 50% duty cycle –Absolute phase isn’t yet known. Maybe we’re seeing trailing edge of pulse No trigger or occupancy excess observed during the body of the RF pulse –No sustained effects are visible in CAL –Datagrams dropped (not sent from CPU to SSR), CPU load rises to 100% Error messages from LAT dataflow system indicate backpressure asserted –High data volume from additional 1 kHz of large events (relative to flight) –CPUs are running in “write-through” cache mode (reboot holdover), decreasing computing capacity by a factor of 3 – 5, exacerbating the problem »CPU load (write-through) is 45% with ~600 Hz of cosmics »CPU load (nominal) is 15% with ~600 Hz of cosmics Event communications fabric is shared by instrument data and CPU-to-CPU communications. –Large event volumes can disrupt CPU message transmission and delivery Speculation: –Affected towers are near one of two rise-to-altitude vents on +X face of EMI skirt Perhaps this particular vent is source of RF leakage No on-orbit issue, no emitters at this frequency, waiver in process

GLAST LAT Project July 12, 2007 NCRs and Waivers 8 Calorimeter Susceptibility Upper panel: Large LAT data volume –Four episodes of high volume Correspond to 4 freq steps near 280 MHz –Each freq step = 3 sec RF on, ~4 sec RF off Data dropped during last 3 freq steps when: –CPU load rises to 100% –error messages seen in Diagnostic stream Lower panel: Profile of signal induced in CAL –Observation: Excess CALLO triggers are precisely periodic at 1 kHz Use that periodicity to look for CAL signals –Measure duration and strength of signal in CAL CAL pulse height has been phase- aligned with 1 kHz spike of CALLO triggers TKR-triggered muons (one per blue dot) –Trace out excess signal in CAL –Consistent with very fast spike through 3.5 us shaper –Absence of signal beyond 10 us from time of 1 kHz spike means that this is not a sustained effect in CAL Trigger and data excess is associated with leading (or trailing) edge of RF pulse

GLAST LAT Project July 12, 2007 NCRs and Waivers 9 RTD Susceptibility Observatory RS103 testing reconfirmed a known susceptibility between 30 – 100 MHz of certain RTDs. –Radiator –VCHP Reservoir –ACD Shell An example of the susceptibility

GLAST LAT Project July 12, 2007 NCRs and Waivers 10 RTD Susceptibility Status Flag #102 written to document the susceptibility –Originally documented in NCR 939 The susceptibility is consistent with what was found at LAT- level testing. Waiver to be submitted

GLAST LAT Project July 12, 2007 NCRs and Waivers 11 Other Observed Issues VCHP-XLHP Temperature Sensor anomaly (see next slide) Details of the following set of observed issues in the Spacecraft presentation –Housekeeping telemetry dropouts and glitches Instances of dropped telemetry packets or corrupted data Typically correlated to changes in telemetry rate or downlink See next slide for typical frequency –Science data dropouts Instances of dropped packets or potentially corrupted packets –Non-contiguous SSR dumps –SSR/UDL dropped frame –Corrupt sync pattern None occurred during susceptibility testing and thus are not EMI related –GPS lock dropouts GPS lock flags showed many instances of lost GPS lock See Spacecraft presentation

GLAST LAT Project July 12, 2007 NCRs and Waivers 12 Telemetry and GPS Dropouts

GLAST LAT Project July 12, 2007 NCRs and Waivers 13 VCHP-XLHP Temperature Sensor Anomaly Telemetry glitches were found for the +Y VCHP-XLHP heatpipe #4 primary thermistor. Example of Glitches

GLAST LAT Project July 12, 2007 NCRs and Waivers 14 VCHP-XLHP Temperature Sensor Status The glitches were first noticed during self-compatibility Review of the telemetry history reveals glitches during LAT pre-TV CPT –Magnitude of the glitches range from ~3 DegC to ~9 DegC –Duration is on the order of minutes Glitches are occurring more frequently since the start of EMI testing –Magnitude is much larger, duration is longer in many cases –We do not believe the glitches are EMI test related Glitches found during LAT pre-TVAC Some instances occurred during LAT power on in preparation for EMI testing or in between EMI tests LAT recommendation for troubleshooting after the radiators discussed in FRB, potentially to be performed on Monday. –Inspecting the interface connector pins, wires and sensors –With a Ohm-meter connected at the interface connector via BoB, apply hand pressure along wire routing to see if a change in resistance occurs. May need to change LAT TCS to read the VCHP-DSHP interface sensor instead if the cause of the glitches cannot be fixed

GLAST LAT Project July 12, 2007 NCRs and Waivers 15 Digi Report Data Samples The following charts show 4 of the 64 plots for each Digi report –Compares run (100MHz to 180MHz) to run (180MHz to 1GHz) –Plots selected to show calorimeter susceptibility effects Trigger rates for 30 time intervals showed the spike in events Number of CAL LO triggers per tower showed that the triggers all came from tower 15 Time interval between adjacent events in milliseconds showed that the interference had a 1 msec periodicity Average number of crystal hits in a particular CAL layer showed that the effect covered more than tower 15

GLAST LAT Project July 12, 2007 NCRs and Waivers 16 Digi Data Samples (Continued) Run Run Trigger rate vs time Triggers vs tower

GLAST LAT Project July 12, 2007 NCRs and Waivers 17 Digi Data Samples (Continued) Run Run Time between adjacent events Average number of hits per layer

GLAST LAT Project July 12, 2007 NCRs and Waivers 18 Summary LAT data review is complete Two acceptable EMI susceptibilities were detected and documented Several other non EMI related issues were documented OK to break configuration

GLAST LAT Project July 12, 2007 NCRs and Waivers 19 NCR Summary Status Closure Plan DefinitionCount Work continuing QARCND or other issue transferred to a QAR9

GLAST LAT Project July 12, 2007 NCRs and Waivers 20 LAT Level Verification Status Progress this month –All 458 VPs are Final –All VPs planned for execution to this point have been performed 410 VPs have been executed to date –405 VPs approved and 5 VPs conditionally approved by GSFC Two reopened to add details, closure plan in place Status –VCRM version 25 released –All deferred GRB reqts will be sold post FSW B1.0 installation