Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Common Customer Issue: I2C Cable Glitches
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Team 12 Greg Eakins Eric Geier Pete Dudash Jeremy Gries The Two Wheel Deal SS 4000.
Author George Peck EVLA Hardware Monitor and Control PDR March 13, APPLICATIONS AND DEVICE INTERFACE ISSUES.
LIGO-G070xxx-00-M December 19, 2007 Single Stage ISI Electronics Overview Ben Abbott Mohana Mageswaran December 19, 2007.
Dennis Coyne Excomm Jan 26, 2004
LIGO-G M LIGO1 Hydraulic External Pre-Isolator (HEPI) Overall Installation Plan/Schedule Dennis Coyne HEPI Installation Readiness Review Feb 11,
40m Suspension Electronics Benjamin Abbott California Institute of Technology 10/18/01 G R.
LIGO-G M LIGO Laboratory1 Adv. LIGO Seismic Isolation (SEI) Plans, Schedule, Costs, Team Schedule »through R&D, including near-term plans »project.
Nov ’01, page 1 Current Work on Hydraulics for LIGO 1 and Advanced LIGO Rich Abbott, Graham Allen, Daniel DeBra, Joe Giaime, Giles Hammond, Marcel Hammond,
PALM-3000 P3K Team Meeting #15 Stephen Guiwits Dean Palmer Ernest Croner Team Meeting # Cahill October 29, 2009.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
LSC Meeting August ‘04 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, Hanford Dave Ottaway for the LASTI team August.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Laguna Beach, CA March 30-April 1, 2003 PMT HV Base Board Development Nobuyoshi Kitamura SSEC / UW-Madison.
Presentation of the DriveLab Board Opal-RT Real-time institute 2009.
LIGO-G v3 March 30, aLIGO BSC ISI Electronics aLIGO BSC ISI Electronics FDR 3/30/2010 LIGO-G Ben Abbott, Brian Lantz.
University of Tehran 1 Microprocessor System Design IO Applications Omid Fatemi
E v3 aLIGO SEI Testing and Commissioning Overall Plan
Presenter: Wan Qi Choo.  A music synthesizer that uses the 8x8 grid of 64 buttons as its user interface to produce sound and emit light.  3 music playing.
University of Minnesota Unmanned Aerial Vehicle Research Lab Common Harness Wiring Instructions.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
FE-I4 Test Setup Hardware Needs: Boards & Interfaces March 1 st 2010, Marlon Barbero.
.. Smart sensors are sensors with integrated electronics that perform the following functions:  Logic functions  Two-way communication  Make decisions.
LSC Meeting March ‘05 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, LLO Dave Ottaway for the LASTI team March 2006 LIGO-G Z.
Pads Assembly- Zamiatin Si Detector – ELMA/Dubna/MSU Interface Board – dubna/baskagiv Carrier Board -dubna/baskagiv Pre-Amp –sleniov(analog) Basilev-dubna.
Seismic Isolation System Prototypes Seismometer Pod IDR Ref: A.
ZTF Interconnecting Scheme Stephen Kaye
LSC Meeting at LHO LIGO-G E 1August. 21, 2002 SimLIGO : A New LIGO Simulation Package 1. e2e : overview 2. SimLIGO 3. software, documentations.
Comparators, DAC, and ADC
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger.
Electronic System Design GroupInstrumentation DepartmentRob HalsallRutherford Appleton Laboratory19 July 2002 Electronic System Design Group CMS Tracker.
Lasti ISI Update March 2007 On behalf of the SEI Team LIGO-G Z.
Department of Electronic & Electrical Engineering Introduction to microcontrollers A microcontroller is a small computer on a single integrated circuit.
Fundamental Digital Electronics
Differential Signal Path for 64 ch ZTF Mosaic Roger Smith and Stephen Kaye California Institute of Technology.
Grounding ADCs & DACs Data Converters (ADCs and DACs) are accurate and sensitive analog devices whose analog ports are vulnerable to unwanted noise (most.
David DuemlerMartin Pendergast Nick KwolekStephen Edwards.
Cabling Policy for KAGRA ISC Yuta Michimura Ando Group Department of Physics, University of Tokyo March 14, 2016.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
LIGO-G D Design Requirements Larry Jones Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
Solar Energy Generator: Design Rendering Description
ECAL Front-end development
Preliminary PCB Design
ADC,DAC and sensor interface
Preliminary Design Review
HPS Motherboard Electronic Design
DATA COMMUNICATION Lecture-21.
Chapter F – Mux / demux.
Notes on Lab 1 – Intro to the Mechatronics Lab
RF and DC Cabling Policy for KAGRA ISC
Preliminary PCB Layout and Design: Team 16
Hierarchical Control Notes – Blending Style
Testing of the EMCO Prototype Boards
FEE Electronics progress
Management of the Advanced LIGO Seismic Isolation System Development
SNS PPU Cryomodule Instrumentation
Actuators and acting electrical signal digital signal.
RF and DC Cabling Policy for KAGRA ISC
Differential Signal Path for 64 ch ZTF Mosaic
Picture 1 10 protons 10 neutrons = an electron.
SNS PPU Cryomodule Instrumentation
ICARUS Internal Cryogenic Sensors
Presentation transcript:

Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech

2 Picture from Joe Giaime’s Talk Jan, ’05 G050007

3 Sensor Electronics (one per pod)

4 Actuator Electronics for All 3 Pods

5 Digital Electronics Interface

6 ADC and DAC Signal Chains

7 Rack Layout at LASTI

8 Flange Feedthroughs Needed per BSC (9) 25-pin D-sub feedthroughs (3) for the six GS-13s (two per pod) (3) for the six L4Cs (two per pod) (3) for the three STS-2 Sensors (one per pod) (12) Coax Feedthroughs for the Capacitive position sensors (four per pod) (12) 3-pin power connectors (four per pod)