Buy Cirus Control Equiptment Time: 1 week Task Leader: Norm Test Control equipment in lab Time: 2 weeks Task Leader: Alex Determine optimal location in.

Slides:



Advertisements
Similar presentations
Mobile GIS.
Advertisements

Components of GIS.
Truck Fleet Data Display for Burlington Department of Public Works
Introducing ArcGIS Desktop
IT PLANNING Enterprise Architecture (EA) & Updates to the Plan.
Forestry GIS Geographic Information Systems.
University of Vermont Senior Experience in Engineering Design.
Lab 2: Introduction to ArcGIS Global Change II Sara Tourscher Room 3325 Lab 1b.
Desktop, Mobile & Web Based GIS/ Collaborative GIS Lecture 4.
FSAE Telemetry Team WiTel: Alex Pfarr, Emily Peterman, Lonny Cooper & Clint Young seniordesign.engr.uidaho.edu/2005_2006/witel/index.html.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Using Ethnography in the Library: How to Study the Students in their Native Data-Gathering Habits.
Burlington Department of Public Works University of Vermont Senior Experience in Engineering Design Alex Estey Matt Clark Kenn Austin Yago Alanso Garcia.
DOES YOUR DATA TALK TO YOU?. A NEW SOFTWARE PLATFORM FOR THE COLLECTION AND ANALYSIS OF ENVIRONMENTAL DATA.
SEED: Burlington Department of Public Works Spring Interim Presentation.
One World Real Estate Company Technology Plan. New Computers For the Office Eight 13 inch MacBook Pros and three 27 inch iMac desktop computers Macs are.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
1 Test Slide Text works. Text works. Graphics work. Graphics work.
Fall AboutMichael Fung, CS&E, The Chinese University of HK1 CSC1030 Hands-on Introduction to JAVA Dept of Computer Science and Engineering The.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
0 Test Slide Text works. Text works. Graphics work. Graphics work.
CS 0004 –Lecture 8 Jan 24, 2011 Roxana Gheorghiu.
ITALY, april 12, to develop students competencies in vocational training by using of a new technology like Geographic Information System (GIS) to.
Anees Elhammali Michael Malluck John Parsons Namrata Sopory
Jennifer ZingeryAbel AvilezKatie KunzAya Udagawa CONSULTANTS:
Software Engineering 2003 Jyrki Nummenmaa 1 CASE Tools CASE = Computer-Aided Software Engineering A set of tools to (optimally) assist in each.
Differential eLoran Reference Station for Maritime and Precise Time Applications Gerard Offermans, Arthur Helwig, Reelektronika NL International Loran.
EDLD 5362 Information Systems Patricia Wilde-ET8015.
Summer Summit June 18 th, Fall 2013NAverage ACTmathAverage PT1Average PT2 Math 107 GREEN at Week Math 108 RED at Week
Faculty Information Needs: Online Survey at UCSF Gail Persily Janice Contini CNI, April 2007.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Crystal Ball Panel ORNL Heterogeneous Distributed Computing Research Al Geist ORNL March 6, 2003 SOS 7.
An AI Trading Strategy Platform.  Fast strategy simulations over large data sets  Dynamic back-testing without pre-programming setup ideas  Artificial.
Equipment/Software Project Leah Wernsing. Technology in Physical Education  Technology is everywhere this century  Students can relate to using it 
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
GAYA Analyzer SDD Presentation. GAYA Analyzer Introduction OMS40G256 is a hardware device used for detection of radioactive radiation for medical imaging.
Sample Cost/Benefit Analysis of adding Human Factors Tasks to a Software Development Project Adapted from: Mantei, Marilyn M. and Teorey, Toby J., “ Cost/Benefit.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
VISION Students and staff at The Hamptons School will be users of a wide variety of technological tools which will integrate with and enhance learning.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Task 2.1: Software Specifications Markus Kissler-Patig.
National Aeronautics and Space Administration Aquarius Validation Data System Overview and Status Algorithm Workshop March 21-22, 2007 John Gunn Earth.
1 Authors (if more than one), Presenter Period covered by this report Title North Carolina State University Wireless Ad Hoc and Local Area Networks.
Team Reach Jessica McCartney Jie Zheng Monica Marinescu Xiaoning Xu Mid-Year Presentation Engineering Design Clinic December 10, 2004.
ECE4006 Senior Design Project Linda Milor and Jay Schlag
CS 157B: Database Management Systems II April 22 Class Meeting Department of Computer Science San Jose State University Spring 2013 Instructor: Ron Mak.
Why Measure?. What Would You Do First? What Would You Do First?
1 Planning Change. Painting a Room Select paint 10 days Sand and clean walls 3 days Buy painting supplies 1 day Buy paint 1 day 1 st coat 1 day 2 nd coat.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Evaluating GIS for Disaster Management Bruce Kinner GEOG 596A.
DATA MINING It is a process of extracting interesting(non trivial, implicit, previously, unknown and useful ) information from any data repository. The.
Redesign/ Change Management Team 3. Point of Actions  Joint Application Design (JAD) session (2 weeks)  Representatives from each department  Overview.
Truck Fleet Data Display for Burlington Department of Public Works University of Vermont Senior Experience in Engineering Design.
MGT 350 Week 1 Individual Critical Thinking Application Paper Prepare a 700-to 1,050-word paper in which you describe critical thinking. · Provide an example.
MGT 350 Week 2 Learning Team Thinking and Decision Making Paper Prepare a 1,050- to 1,400-word paper in which you analyze at least three different types.
OPS 571 Week 4 DQ 2 To purchase this material click below link 571-Week-4-DQ-2 What was the most complex project.
PSY 265 Week 9 Final Project Personal Response on Sexual Identity Final Project: Personal Response on Sexual Identity Resource: Appendix A Due Date: Day.
Piero Belforte, HDT, MERITA project 2000: objectives, activities and results by Carla GIACHINO .
Traditional Project Management
Eleanor Roosevelt High School
The G8 Academies 2010 Fall 2009 Issue invitations to G8 + x.
Deck 12 Accounting Information Systems Romney and Steinbart
Collaboration with Google Drive
Get IEEE 802® Update IEEE 802 Plenary; 802 March, 2015.
Notes on Lab 1 – Intro to the Mechatronics Lab
Guidelines for Resident Quality Improvement Project
Project Status: [Project Name]
Math and Reading Benchmarks: Feb 27th & 28th
PAIN OUT network in Mexico
50% Written Exam Explained
Presentation transcript:

Buy Cirus Control Equiptment Time: 1 week Task Leader: Norm Test Control equipment in lab Time: 2 weeks Task Leader: Alex Determine optimal location in truck Time: 2 weeks Task leader: Matt Collect and Format Data Time: 2 weeks Task leader: Kenn Determine Best Fit Laptop Time: 2 weeks Task Leader: Yago Set up Equipment in truck For test run Time: 1 week Task Leader: Alex Set up Wireless Download Time: 1 week Task Leader: Matt Fall 2007 Jan. 14Jan. 28Feb 4 Purchase laptop Time: 1 week Task leader: Yago Design User Interface Time: 1 week Task leader: Kenn Research ArcGIS Software Functionality Time: 2 weeks Task leader: Kenn Red: Critical Path

Collect Data Time: 2 weeks Task Leader: Yago Study equipment locations Time: 2 weeks Task leader: Alex Set up GIS program Time: 2 weeks Task Leader: Matt Develop user interface Time: 4 weeks Task Leader: Kenn Integrate data in GIS Time: 2 weeks Task leader: Matt Rework equipment locations Task leader: Alex Time: 2 weeks Analyze and compare data Time: 2 weeks Task leader: Yago Feb 4March 17March 3Feb 18 Purchase docking station for laptop Time: 2 week Task leader: Alex Time for unforeseen setbacks Time: 2 weeks Task leader: All Refine user interface Time: 2 weeks Task leader: Kenn Purchase and set up wireless download system Time: 2 weeks Task leader: yago Red: Critical Path

Prepare for final presentation Time: 2 weeks Task leader: Alex Final Presentation Create power point for final presentation Time:2 weeks Task leader: Alex Create event simulation Time: 2 weeks Task leader: Kenn April 30 April 21April 7 March 24 Time for unforeseen setbacks Time: 2 weeks Task Leader: Yago Red: Critical Path