Prototype Fabrication, Economic, & Test Plan QDR Tung Tran Matt Drodofsky Haris Md Ishak Matt Lossmann Purdue University AAE 451 Fall 2006 Team 4 Mark.

Slides:



Advertisements
Similar presentations
Stability.
Advertisements

Aircraft Controls.
The Fuselage and Empennage
Airplane Components and Systems
6th grade Springton Lake
Boy Scouts Aviation Merit Badge Control Surfaces.
Approved Training Manual’s Lesson Plans And Courseware STAR MARIANAS AIR, INC. Initial New Hire – Flight Crew Part III – Aircraft Ground Training Section.
DR2 Aerodynamic PDR II Aerodynamic Preliminary Design Review II “The 20 Hour Marathon” October 19, 2000 Presented By: Loren Garrison Team DR2 Chris Curtis.
Dynamics & Control PDR 1 Purdue University AAE 451 Fall 2006 Team 4 Tung Tran Matt Drodofsky Haris Md Ishak Matt Lossmann Mark Kock Ravi Patel Ki-bom Kim.
Vehicle Sizing PDR Presented by: Mark Blanton Chris Curtis Loren Garrison September 21, 2000 Chris Peters Jeff Rodrian DR2.
Propulsion QDR 2 AAE 451 Fall 2006 Team 4 Tung TranMark Koch Matt Drodofsky Matt Lossmann Ravi PatelKi-bom Kim Haris Md IshakAndrew Martin.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1 Vehicle Sizing PDR AAE 451 Fall 2006.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1 Project Plan Review AAE 451 Fall.
Soft Field Takeoff and Landing. Soft Field Takeoff w Before landing, will you be able to take off? w Complex and high performance aircraft often have.
March 22, Prototype Fabrication Economic & Test Plan QDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew.
Team 5 Structures PDR Presented By: Ross May James Roesch Charles Stangle.
Flight Performance, Stability and Control PDR Brian Barnett Rob Benner Ryan Srogi John Keune Alex Fleck.
AAE 451 – Fall 2003 Ares Team Mir Rashiduzzaman Alethea Tan Kai-Hui Leong Darwin Lisan Jung Hyun Ahn John Ko.
Utilizing your notes and past knowledge answer the following questions: 1) What part of the aircraft is located on the outer portion of the trailing edge.
Flight Simulator X By Dane Wrye, Aaron Pena, and Ben Ghusn.
1)Aileron 2)Elevator 3)Rudder Aileron Ailerons can be used to generate a rolling motion for an aircraft. LOCATION: Ailerons are small hinged sections.
Team 5 Critical Design Review Trent Lobdell Ross May Maria Mullins Christian Naylor Eamonn Needler Charles Reyzer James Roesch Charles Stangle Nick White.
Dane Batema John Tapee Audrey Serra Patricia Roman Kyle RyanCarlos Vergara Benoit BlierDrew Capps Team 1: Lessons Learned and Vehicle Summary Team “Canard”
AVIATION By Daniel Velare. Airplanes  An Airplane Consist of five major parts  WING  POWERPLANT  LANDING GEAR  FUSELAGE  EMPENAGE  An Airplane.
Airplanes By : Hebron Yam,Justin Minucci. How do airplane work? Problem???
Western Hills HS Aeronautical Engineering A Primer to Aircraft Structure and Design: Project Lead the Way - A Discussion on Career Potential and Opportunities.
Group 13 Heavy Lift Cargo Plane Richard-Marc Hernandez Yoosuk Kee Stephen McNulty Jessica Pisano Chi Yan Project Advisor: Siva Thangam.
Aircraft Familiarization
SR-71 Blackhawk Flight & Space $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400.
AAE 451 Aircraft Design First Flight Boiler Xpress November 21, 2000
Ancient Greece Myth of Daedalus & Icarus
February 24, Dynamics & Controls 1 PDR Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason.
Critical Design Review
Dynamics & Control PDR 2 Purdue University AAE 451 Fall 2006 Team 4 Eparr Tung (in my) Tran Matt Dwarfinthepantssky Nazim Haris Mohammad Ishak (no, it’s.
Aircraft Motion and Control
DR1 PF, E, & FTP PDR Prototype Fabrication, Economic and Flight Test Plan Preliminary Design Review October 26, 2000 Presented By: Mark Blanton & Chris.
Warm-Up – 9/9 – 10 minutes Utilizing your notes and past knowledge answer the following questions: What are the two most popular types of fuselage structures?
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Prototype Fabrication, Economic, & Test Plan.
Aircraft Auto Pilot Roll Control System
Dynamics & Controls PDR 2
Basic Aircraft Structure
Vehicle Sizing AAE 451: Team 2 Michael Caldwell Jeff Haddin
Team 3 Structures and Weights PDR 2
Aerospace System Prototyping and Validation- Lecture 2
Aircraft Controls.
DYNAMICS & CONTROL PDR 1 TEAM 4
Design Refining a design.
PARTS OF AN AIRCRAFT.
Dynamics & Controls PDR 1
Aircraft Controls.
Team One Dynamics and Control PDR 2 10 March, 2005
Stability
STRUCTURES & WEIGHTS PDR 2
Solo-1 ARF Airplane Team 4: Joshua Shawala (Team Leader) Darth Fitch
c/Maj Christopher Greves
The Fuselage and Empennage
Warm-Up – 8/23 – 10 minutes Utilizing your notes and past knowledge answer the following questions: What part of the aircraft is located on the outer.
Propulsion PDR AAE 451 Fall 2006 Team Whishy Washy Tung Tran Mark Koch
Basic Aircraft Structure
Dynamics and Control PDR 2
Warm-Up – 1/18 – 10 minutes Utilizing your notes and past knowledge answer the following questions: What are the two most popular types of fuselage structures?
Fabrication, Economics and Test Plan QDR
DYNAMICS & CONTROL QDR 1 TEAM 4
Prototype Fabrication, Economic, & Test Plan QDR
Prototype Fabrication, Economic, & Test Plan QDR
Aerodynamics PDR # 2 AAE451 – Team 3 November 18, 2003
Vocabulary in your own words
Dynamics & Controls PDR 2
Dynamics and Control PDR 1
Propulsion QDR AAE 451 Fall 2006 Team 4 Tung Tran Mark Koch
Presentation transcript:

Prototype Fabrication, Economic, & Test Plan QDR Tung Tran Matt Drodofsky Haris Md Ishak Matt Lossmann Purdue University AAE 451 Fall 2006 Team 4 Mark Koch Ravi Patel Ki-Bom Kim Andrew Martin

Overall Schedule

Build Groups Fuselage: (Ki-Bom Kim Tung Tran) Fuselage: (Ki-Bom Kim Tung Tran) Construct main support and bulkheads Main wing attachment Main landing gear and attach points Wing: (Andrew Martin Matt Lossmann) Wing: (Andrew Martin Matt Lossmann) Main wing construction Flaperon construction Pitot tube routing Dihedral angle consideration Tail Section: (Haris Md Ishak Ravi Patel) Tail Section: (Haris Md Ishak Ravi Patel) Horizontal and Vertical Fin construction Elevator and Rudder construction Tail wheel attachment Propulsion and Component: (Matt Drodofsky Mark Koch) Propulsion and Component: (Matt Drodofsky Mark Koch) Assemble powerplant Develop wiring diagrams Determine control linkage layout Flightline

Economic Plan Company Overhead Company Overhead Purdue University is providing Build team with facilities, machine shop, and electrical power for testing. Person-Hours for R&D Person-Hours for R&D Total Hours for Project: 1750 Hours Current Hours: 1009 Hours Groups having PDR presentations were opened for OT hours Budget Cost (Allotment $250.00) Budget Cost (Allotment $250.00) Propulsion: $ Landing Gear: $24.27 Control Linkage: $23.79 Fuselage: $33.00

Flight Test Plan Static Test (Purdue Airport Facility) Static Test (Purdue Airport Facility) power up the aircraft receiver and transmitter. Actuate all control surfaces to full deflection look for correct deflection movement, binding, and surface strikes High Speed Taxi (McAllister Park) High Speed Taxi (McAllister Park) power up engine and run down runway to insure tail wheel controllability Flight Test (McAllister Park) Flight Test (McAllister Park) First flight: (Yaw feedback control off) Brief liftoff and land to feel initial handing qualities of aircraft. Second flight: Second flight: Sustaining flight with turns to evaluate aircraft stability and control. Third flight: Go through procedures to set rate gyro gain. FULL THROTTLE FLIGHT!