1 Prototype Fabrication, Economic, & Test Plan QDR
AAE451: Team 2 Matt Negilski Mike Palumbo Chris Selby Tara Trafton Ashley Brawner Neelam Datta Xing Huang Jesse Jones Presents: The TFM-2

2 Outline Cost Analysis Build Schedule Flight Test Plans Material cost
Team hours Build Schedule Flight Test Plans

3 Fabrication Cost Analysis
Estimated Team Cost: $301.09 Over Budget: $51.09 Exempt Item Cost: $205.95 TOTAL COST: $507.04

4 Team Hours (Week 8) Total team hours: 1260
Total projected team hours: 2205

5 Overall Schedule Legend Green = Team Work Blue = Aero Work
Red = Propulsion Work Black = Structures Work Purple = D&C Work ♦ = Milestones

6 Overall Schedule Continued…
Legend Green = Team Work Blue = Aero Work Red = Propulsion Work Black = Structures Work Purple = D&C Work ♦ = Milestones

7 Flight Test Plan Flight regimes Take-off Landing
Moderate-slow cruise and loiter Stall/Flapped operation High speed dash

8 Flight Checks Control surface sizing Control surface operation
Electrical connections Structural fasteners Control surface actuators Engine/throttle control Lateral/longitudinal CG check

9 Tests Test 1 Test 4 Test 2 Test 5 Test 3 Test 6 Static thrust test
Low level flight cruise Landing tall grass, no flaps Test 3 Clean stall Flapped stall Landing short grass, with flaps Test 4 High speed Maneuvering Landing short grass, with flaps Test 5 High speed short mission Test 6 Endurance mission

10 Questions?