Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, 2002 - CERN.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

27/02/2002M.D.P. - ATLAS Muon Week1 First results of Atlas RPC cosmic rays test Massimo Della Pietra Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M.
Construction and First Results of a Cosmic Ray Telescope M. P. Belhorn University of Cincinnati 12 June 2008.
ADC Performance and Calibration of MDT Chambers
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
Far Detector Data Quality Andy Blake Cambridge University.
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
ATLAS MDT-ASD PRR – 30-August-2002George Brandenburg – Page 1 ATLAS MDT-ASD Operational Tests at Harvard George Brandenburg Michelle Dolinski Peter Hurst.
The Oscilloscope: Basic Features & Functions  Source –Determines which signal is compared to the trigger settings.  Level –Determines where on the edge.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Magnetic Lab Hall Probe Measurement System 8/26/2003 Key System Requirements Motion Control: SmartMotor via RS axis: x(0-400mm), y(0-400mm), z(0-6000mm),
UM PPS Lab Activities - HV Readout Long Run - Single Source Saturation Test PPS meeting April 30, 2012.
Commissioning data are taken with individual chambers TP data autotriggered Cosmic rays data  ( different configuration) Different cosmic track angle.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
PicoTDC Features of the picoTDC (operating at 1280 MHz with 64 delay cells) Focus of the unit on very small time bins, 12ps basic, 3ps interpolation Interpolation.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
N. Morgan, Virginia Tech Qweak meeting,Oct ‘05 Region 2 Drift Chambers Status Report Qweak Collaboration Meeting October 2005.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 BFEM Trigger Diagnostics Mar 12, 2002 Tsunefumi Mizuno Note: For reference, this document includes some works already reported (pages 2-5 and 7). The.
Transfering Trigger Data to USA15 V. Polychonakos, BNL.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
RPC Timing Results with Final Splitters Gianpaolo Carlino INFN Napoli The Napoli RPC Group: M.Alviggi, V. Canale, M. Caprio, G.C., R. de Asmundis, M. Della.
Anatoli Romaniouk TRT Test manual Some important information p. 2-3Some important information p. 2-3 Noise studies p.4-7Noise studies p.4-7 Operation with.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
1 Analysis of Small RPC DHCAL Prototype Data (noise and cosmic ray) LCWA09, Albuquerque, New Mexico Friday, October 02, 2009 Qingmin Zhang HEP Division,
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Vladimir Frolov (Centro Fermi) On behalf EEE-TO group.
Digitization at Feed Through R&D (2) Digitizer Performance Evaluation Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
C.Beigbeder, D.Breton, M.El Berni, J.Maalmi, V.Tocut – LAL/In2p3/CNRS L.Leterrier, S. Drouet - LPC/In2p3/CNRS P. Vallerand - GANIL/CNRS/CEA SuperB -Collaboration.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Development of new DAQ system at Super-Kamiokande for nearby supernova A.Orii T. Tomura, K. Okumura, M. Shiozawa, M. Nakahata, S. Nakayama, Y. Hayato for.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Analysis of LumiCal data from the 2010 testbeam
vXS fPGA-based Time to Digital Converter (vfTDC)
Counting Mode DAQ for Compton
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
The Silicon Drift Detector of the ALICE Experiment
Setup for Cosmic Ray Test of VPA panel, using MiniDAQ
M. Alexeev on behalf of Torino TIGER Test Group
Run experience Cover FW SRB FW DAQ and monitoring
Status of n-XYTER read-out chain at GSI
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Han Jifeng BESIII MUON GROUP IHEP, CAS
BESIII EMC electronics
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
11th Pisa meeting on advanced detectors
BUCKEYE has internal shift register which controls calibration
ASD-TDC joint test with MDT-CSM
Presentation transcript:

Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN

Goals of Michigan Test Confirm actual deadtime vrs setting. Hits/event vrs trigger rate (I/O traffic test). (Have observed a feature above 20KHz). Operate in pair & edge modes. Measure drift spectrum & pulse width. Test general stability with time. Examine high-rate behavior.

Hardware on Chamber 17 AMT2 Octal Mezz cards were installed. One for a trigger injector.

To the right is the setup screen for the ASD. Below is the AMT setup Important settings: Search Window =  s Match Window = 1.2  s ASD Deadtime = 790 ns Cosmic data is taken with leading/trailing mode. Other tests are done in pair mode AMT & ASD settings

Data Integrity Check –EVID Match –BCID Match –Data Structure Data size of each TDC Head/Trailer correct –Parity Error –TDC Errors Error details are recorded for further analysis TDC error reports are checked at end of run Online Data Monitor

Triggers 1.Cosmic trigger (24Hz) ORed with 1.Continuous pulser trigger from 100Hz to 100KHz. 400 Ticks

High Rate Test Difficulties AMT-2 level 1 buffer address “bug” has two effects that complicate precise testing. –At high trigger rates & modest hit rate, hits lost. –At high trigger rates, readout of hits not in the match window occur. Noise is exaggerated. With DAQ used, full readout is limited to a few KHz. For trigger rates up to 100KHz+ prescale sampling was employed.

Conditions for Hit Miss

False hits above 20KHz Plot shows hit rate at 60mV threshold in a 1.2  s match window. Rate is a few hits per 10,000 events in each channel below 20KHz & rises 8 fold at high rates. ~8 fold Rise at 20KHz

Noise Performance Unshielded hedgehogs Shielded hedgehogs have much smaller noise rate.

Deadtime Measurement

Deadtime vrs DAQ Rate

ASD noise feature ASD main threshold is set to –10mV. One expects that most hits are introduced by ASD For this case the pulse width seen is narrow, around 20ns ASD Noise Pulse Width

Measurements are done with nominal 60mV threshold & chamber HV on, so width distribution includes real ionization hits from chamber & ASD noise hits. ASD Noise “Real Hit Noise” Hit Width Distribution

At 60mV & above the hits per channel reach a plateau & are mostly “ real” chamber signals At low threshold hits are from ASD noise falling with threshold. Hit Rate vs Threshold

For this test the trigger signal is injected into a mezz card for digitization & to the trigger. The measured time should be uniformly distributed in a 25ns window since the digitization clock is not synchronized to the trigger pulser. A uniform, narrow & large width is expected for these pulses. Time & Width Measurement Width encodes amplitude

Hits from Cosmic Ray Fine Time Measurement

Cosmic Ray Observation

ASD Noise Cosmic Ray Spectrum

Low reconstruction efficiency of 6 layer cosmic tracks is due to dead channels. Most of the loss is traced to shorts & open circuits on the shielded hedgehog cards. Reconstruction Efficiency Was 0.45 for unshielded

17 Mezzanine Cards are tested at 100KHz DAQ rate including cosmic ray trigger. System runs without any problems. Average event size is (= 0.29 hits per event) & is constant over a long periods. (ASD is stable & quite) Stability Test at 100KHz

Operate Mezzanine Card for long drift times without problems (ASD is stable & quiet over long periods) Pair mode cannot be used with long drift times due to limited number of bits. Can a) slow down clock or b) use leading & trailing edge mode. Hits with leading edge > 1.6  s are lost DAQ for Long Drift Time

Conclusions From an operational standpoint the ASD works without problem & is capable of triggering at 100KHz. The measured average ASD deadtime is as expected. One ASD channel was outside the typical pattern. The measured hit rate for a HV-on-chamber is about 1KHz per mezzanine card when the ASD threshold is 60mV or above. We observe cosmic rays at low trigger rate. We are unable to perform high rate tests due to the known AMT problem. We observe no ASD problems. It is possible to operate ASD/AMT mezzanine card with long drift times but with deadtime less than 800ns.