Reviewing & Analyzing Schedule

Slides:



Advertisements
Similar presentations
Chapter 6 Practical Methods to Reveal CPM Covert Activities
Advertisements

Copyright © 2009 T.L. Martin & Associates Inc. Chapter 4 Standard CPM Smoke and Mirror Tricks (Manipulations)
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
CP Chapter 4 Schedule Planning.
Management Information Systems [MOIS470]
TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
TK3333 Software Management Topic 7: Schedule Control.
Chapter 7 Schedule Control
Software Process Models
Advanced Project Management - CPH
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Systems Analysis and Design 9th Edition
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Resource Planning. 51 Resource Planning Estimating Schedule Activity Resource Requirements Determining what resources will be required (labor, equipment,
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
5 december 2011 Living Probabilistic Asset Management Dr.ir. J.A. van den Bogaard.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Scheduling & Resource Planning CTC-415. Schedule Compression Used to decrease schedule time –At what price? Does cost of compression outweigh liquidated.
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Amin Salari, CCM, PMP, LEED AP – Lundgren Management
Control Aspects Common to All MC Process Groups & Control Schedule
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 5 Advanced Techniques of CPM Deception and Mystery.
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Time/Cost Trade-off Analysis
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
King Fahd University of Petroleum & Minerals
 The assigned project is student’s schools which located in YABED; it was designed by Tubealh offices of the engineering design.  The contractor by.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Copyright © 2003 Primavera Systems, Inc Primavera User Conference Schedule Bingo presented by Mike Stone w/Professional Project Management Services.
Advanced Topics CTC-470. HR Management Development of project management organization –Job description Major tasks and duties Determines compensation.
Improved Project Control Through CPM Scheduling What Owners, PM’s and CM’s Need to Know t H E T I B U R O N T I B U R O N G R O U P, L L C G R O U P, L.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Lessons Learned – Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International Charlie Jackson, PSP,
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
Scheduling CTC-370. Value Engineering Provides alternatives to the proposed design –Save Owner $$ –Must be as good or better than original design –Must.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
SOFTWARE PROJECT MANAGEMENT
Managing Schedule Slack/Float PMI Scheduling Forum January 6, 2015 January 6, 2015 Presented by: Ric Albani, PMP, PMI-SP, PMI-RMP, MCTS.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
VA Primavera P6: Baselining the Project Department of Veterans Affairs Office of Information and Technology IT Workforce Development (ITWD) in collaboration.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Establishing and Managing a Schedule Baseline
TOPIC-8A- PROJECT TIME CONTROL
(Additional materials)
MS Project 2016 Level II
Guide to Project.
Project Time Management
Project Time Management
Project Time Management
Importance of Project Schedules
Project Time Management
Managing Project Work, Scope, Schedules, and Cost
Conventional Facilities
Second Avenue Subway Project Execution Strategy
Presentation transcript:

Reviewing & Analyzing Schedule CTC-415

Reviewing the Schedule Is Schedule complete Are Activity Duration Reasonable Are Activity Relationships Complete Are Activity Relationships Valid Is Project Calendar Correct Is Schedule Duration within Contract Time Are Contractual Milestones Met

Analyzing the Schedule Is Critical Path Reasonable Are there Multiple Critical paths What Activities are Near Critical How does Work Flow Are there Conflicts Among Concurrent Activities Is there an Excessive amount of Work at any Time

Updating Schedule Frequency Depends on Complexity Unexpected events More complex -> more updates Unexpected events Update after event to determine new completion date Helps team evaluate strategies to mitigate impacts When specified By contract documents

Updating Schedule How Gather Activity Status Info Update Date – when the info is gathered Activity status Actual start date – meaningful work begins % complete Work in place -> work in place/planned work quantity Time expended -> time expended/ planned duration (only good for time dependent activities like concrete curing) Cost Incurred - >cost incurred/planned cost (depends on actual resource productivity being constant and resource costs not varying) Resource used -> Resource Used/Planned resource amount

Updating Schedule How Activity status Gathering Data Remaining duration – Remaining Work quantity/Anticipated Productivity Actual finish date – all completed activities Provides data for future jobs Gathering Data Direct observation, Update meetings, field reports, turnaround reports, photos and videotape

Modify and Revise Schedule Revise network logic Change duration to meet contracted completion Reflect changes in planned means and methods for completing activity Shift activity to better time (summer for concrete)

Modify and Revise Schedule Revise Activity Durations Planned quantity of work has changed Amount of resources has changed Productivity is either higher or lower than planned Add & Delete Activities Scope of work changed Activities divided into smaller activities

Review and Analyze Schedule Make sure new schedule does not contain errors Implement updated schedule

Analyzing Schedule Status What is the basis for evaluating schedule status? Usually the original schedule is the baseline What is planned completion date Is updated schedule completion date same as baseline If not – why not (is there an error)

Analyzing Schedule Status Has the critical path shifted? If so – why Are CP activities really “critical” Has the float changed on any activities? Has weather become a factor for any activity Are there trends worth watching Any changes since last update?

Out of Sequence Work Why? Preserve Schedule Logic Keep crews busy Preparatory work starts early Gives crew a chance to test means and methods Preserve Schedule Logic Shorten successor activity caused by out of sequence work Keep all other logic intact

Value Engineering Provides alternatives to the proposed design Save Owner $$ Must be as good or better than original design Must save enough $$ so that contractor can recover his cost of doing VE Usually comes from contractor’s or engineer’s previous experience

Value Engineering Can save $$ either due to savings in time or materials Ex: Composite Wall and roofs Material cost per sf is higher than regular roof Labor cost is lower Requires a crane

Value Engineering Ex: Replace infiltrators with Eljen In drains System size is reduced to 50% Also reduces amount of sand, clay, topsoil Reduces dozer time and installation time In-drain costs about 2x infiltrator