Battle Damage Assessment: Space Mission Design Process Example.

Slides:



Advertisements
Similar presentations
Surface Water and Ocean Topography (SWOT) Satellite Mission
Advertisements

BNSC Agency Report Wyn Cudlip BNSC/QinetiQ to WGISS22 Annapolis, September 2006.
John Taylor Nairobi, Kenya Sept 3-4, 2013 Concept of ADS-B via Satellite 1.
Use, duplication or disclosure of this document or any of the information or images contained herein is subject to the restrictions on the title page of.
CEOS EO Handbook Database The MIM Shelley Stover CEOS Systems Engineering Office (SEO) Working Group on Climate Meeting Darmstadt March 4 - 7, 2014.
Landsat Point of Contact USGS Bruce Quirk NGAC Kass Green NGAC Meeting, October 5, 2011.
Mars Telecommunications Relay CubeSat Constellation David Spencer Space System Design Laboratory Georgia Institute of Technology November 20, 2014.
Force XXI Battle Command Brigade and Below (FBCB2) Communications System
Gilbert Islas Feb. 25, 2012 SYSM  A micro air vehicle (MAV) is a class of unmanned aerial vehicles (UAV). unmanned aerial vehicles  Size restrictions.
Resolution.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
GOES Direct Services. Topics  Direct Broadcast Services  GOES Data Collection Services  Search and Rescue.
COSPAS-SARSAT SPACE SEGMENT SATELLITE AIDED SEARCH AND RESCUE JANUARY 2009.
EEE440 Modern Communication Systems Satellite Systems.
METEOR BACKGROUND This is a foundation project in an ambitious endeavor to provide the RIT research community with a means to conduct near space.
Autonomous Landing Hazard Avoidance Technology (ALHAT) Page 1 March 2008 Go for Lunar Landing Real-Time Imaging Technology for the Return to the Moon Dr.
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
1 08 January 2015 Stephen Horan Cube Quest Kick-off: Communications Rules PI for Avionics Space Technology Mission Directorate.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2004 Chapter 17 Cellular Telephone And Satellite Networks.
Spaceborne Weather Radar
Refinement of maritime users needs, Brussels December 18, 2002 The Galileo support to the Search and Rescue Programme (SAR/Galileo)
NAME: NASIRAHMADPROGRAM: B.S TELECOMSEMESTER: 7THREG#: SU/ PRESENTED TO: ENGR. GUL ZAMEEN KHANDATE: UNIVERSITY: SARHAD UNIVERSITY.
SCIENTIST WORK STATIONS Advanced display tools will build on current software to allow for integrated displays of data from onboard instrumentation (e.g.,
Earth Observation, Navigation & Science Page 1 Capacity Final Presentation, , Estec, Noordwijk Report for WP 3300 WP 3300.
Propagation of Electromagnetic Waves
Geography 1010 Remote Sensing. Outline Last Lecture –Electromagnetic energy. –Spectral Signatures. Today’s Lecture –Spectral Signatures. –Satellite Remote.
Space Engineering 2 © Dr. X Wu, 2012
GPS Status and Modernization 3 rd International Satellite Navigation Forum Moscow, Russia 12 May 2009 Lt Col Tim Lewallen, US Air Force Acting Chief, PNT.
Overview of the NOAA UAS Requirements and Capabilities Database Matt Lucas NOAA UAS Program TriVector Services, Inc.
Maj Richard “Krash” Krasner Directorate of Requirements Headquarters Air Force Space Command Air Force Space Command's Environmental Monitoring Requirements.
Resolution Resolution. Landsat ETM+ image Learning Objectives Be able to name and define the four types of data resolution. Be able to calculate the.
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
1 Civil Air Patrol United States Air Force Auxiliary …performing Missions for America.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
Supernova/Acceleration Probe (SNAP) Mission/Science Operations Irene Bibyk Tim Rykowski Bob Schweiss June 28, 2001.
1 Requirements Gathering, Validation, and Concept Studies GOES Users’ Conference Boulder, CO October 1-3, 2002.
CCSDS P1A/B Meeting - Frascati - Nov 8, Gilles Moury, Guy Lesthievent - 1 Proposal to P1A & P1B Increasing allowed frame lengths and interleaving.
Satellites.
1 The Global Positioning System (GPS). 2 nd USAF Space Operations Squadron.
DSL Distributed Systems Laboratory ATC 23 August Model Mission: Magnetospheric Multiscale (MMS) Mission Goal “To study the microphysics of three.
1 IICWG, October 2007 RCM Capabilities for Ice & Sea-Ice Applications IICWG … G. Séguin, R. Girard, Y.Crevier.
TREADS Semester Review Dec. 14, Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.
AEHF Overview presentation to AFCEA Los Angeles Chapter Colonel Michael Sarchet 20 Aug 2009.
SDCG-4, Pasadena, CA/USA September 4-6, 2013 SDS-4 Session 2 Mission updates CBERS-3 INPE – CRESDA.
GMAT9205 – Fundamentals of Geopositioning Gael Desliens
Future Integrated Satellite Architecture Brief to Third GOES-R Users Workshop Broomfield, Colorado Michael Crison NOAA Satellites and Information Service.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
ANGELFIRE… PROVEN PERFORMANCE! Possible Architectures And External Interface Specifications Presented to Program Office 16 SEP 04 (Team 3)
Azerspace-1 Satellite Azercosmos OJSC guide
1 Earth Science Technology Office The Earth Science (ES) Vision: An intelligent Web of Sensors IGARSS 2002 Paper 02_06_08:20 Eduardo Torres-Martinez –
From you host … Dr. H. Introduction Communications design requires us to think about the following issues: Communications design requires us to think.
Satellite Communications ● Inmarsat ● Iridium ● Globalstar & Spot ● Thuraya ● Orbcomm Images from
7 조 강창호 강애량 김창규 오혜영 최재영 이홍일 MQ-9B. 1. Goal of Project 2. Project members 3. Schedule 4. Analysis of UAS 4.1 Requirement analysis 4.2 Air vehicle.
SATELLITE ORBITS The monitoring capabilities of the sensor are, to a large extent, governed by the parameters of the satellite orbit. Different types of.
This Briefing is Unclassified Space Situation Awareness (SSA) for the Warfighter 25 August 2005 HQ AFSPC/DRC Lt Col Troy Pannebecker.
1 Kyung Hee University Chapter 17 Cellular Telephone and Satellite Networks.
FIXED SATELLITE SERVICE and UAS (22 September 2010)
BNSC Agency Report to WGISS21 Budapest, May 2006 Wyn Cudlip
Concept of ADS-B via Satellite
Overview of NovaSAR.
Colorado Space Grant Consortium
IKONOS ~Derived from the Greek term eikōn, meaning image~
Cellular Telephone And Satellite Networks
Radio Links.
Observation and Checkout Modes (1) - Introduction -
Global Positioning System
A KU-BAND GEOSYNCHRONOUS SYNTHETIC APERTURE RADAR MISSION ANALYSIS WITH MEDIUM TRANSMITTED POWER AND MEDIUM-SIZED ANTENNA Josep Ruiz Rodon, Antoni Broquetas,
Presentation transcript:

Battle Damage Assessment: Space Mission Design Process Example

Mission Statement Warfighters need near real-time battlefield recon to conduct bomb damage assessment following tactical sorties to redirect air resources as needed to complete operational missions Air recon missions face too many hazards to perform the assessment safely

The Mission Pre-strike Post Strike

The Mission

Step 1: Define Mission Objective(s) Primary: To detect and assess battle damage anywhere in the world in near real-time Secondary: To provide surveillance capabilities to the DoD that will verify treaty compliance Secondary: To provide damage assessment of natural disasters to relief agencies throughout the world

Step 2: Preliminary Mission Requirements and Constraints Wavelength Range: 0.6 – 1  m Resolution: 5 m Swath Width: 200 km Pointing Stability: 1 km Latitude Coverage: ± 90° Satellite Lifetime: 5 years Reliability: 95% Operational Availability Coverage: 70% with 2 hr maximum gap

Resolution

Swath Width

Pointing Stability

Step 2: Preliminary Mission Requirements and Constraints Months to IOC: 42 months Total Budget: $241,000,000 All DoD acquisitions will follow DoD 5000 standards (regulation) System must communicate with existing air, ground and sea assets via the JWICS architecture (external interface) These constraints can produce derived requirements…

Step 2: Preliminary Mission Requirements and Constraints Operations: Shriever AFB, CO Mission Ops: $10,000,000 / year Existing G/S to be used G/S Reciever Bandwidth: 10 MHz S Band Downlink: 2.3 GHz

Step 3: Alternative Mission Concepts Large constellation (10-15 satellites) of small satellites in low-Earth orbit Medium constellation (5-7 satellites) of large satellites in low- to medium-Earth orbit Small constellation (3 satellites) of very large geosynchronous satellites Near space assets (lighter than air) in the Stratosphere

Step 3: Alternative Mission Concepts On-board data compression scheme for images Full raw data transmission Send data directly to commanders in the field Send data to Pentagon (or some other central location) for analysis