AMS-02 Delta CDR Thermal. Overview Changing from Cryomagnet to PM greatly simplifies AMS-02 Thermal requirements – Keeping vacuum Case “cold as possible”

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 DELTA CDR Permanent Magnet Avionics Changes Summary May 4, 2010 Timothy J. Urban / ESCG /
Thermal StrategySam Heys, RAL EUV Spectrometer Proto-Consortium Meeting November 28th 2001 Coseners House 1 Thermal Strategy Sam Heys Rutherford Appleton.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
HokieSat Thermal System Michael Belcher Thermal Lead December 11, 2002.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
9645 TTCSI “I AM” SECONDARY SCHOOLS COMPETITION CHALLENGE 9645.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Magnet and Magnetic Fields Phase III Flight Safety Review January 12, 2010.
AAE450 Spring 2009 Kelly Leffel 3/26/09 Structures and Thermal Lunar Descent Phase Lander Integration Lander Thermal Control (Day) Kelly Leffel Structures.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
CHE/ME 109 Heat Transfer in Electronics
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Craig S. ClarkAMS-02 Phase II Safety Review1 AMS-02 Thermal Control System (TCS)
MICE Spectrometer Solenoid Review Some inputs for the in person meeting to be discussed at the November 13, 2009 phone meeting P.Fabbricatore on behalf.
Tutorial 2a: Energy flow-paths Q1. Give 3 reasons why two different walls of the same U-value might give rise to substantially different energy requirements.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
AMS Cabling CERN Prevessin 893-1D020 December 6, 2006 Agenda 1) Brief overview -Show Plumbing and VC ring-mounted-hardware -AMS overall -Common.
1 AMS-02 Integration & Test Plans & Status Trent Martin 24 January, 2007.
Enhancement of Heat Transfer P M V Subbarao Associate Professor Mechanical Engineering Department IIT Delhi Invention of Compact Heat Transfer Devices……
Federal Aviation Administration 0 Composite Wing Tank Flammability April 2-3, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Tracker Thermal Control System 1 AMS Tracker Thermal Control System (TTCS) Phase II Safety Presentation SRII meeting, 21 May 2007, Houston Johannes van.
THEMIS Instrument CDR 1 UCB, April , 2004 EFI Axial Booms Thermal Christopher Smith Thermal Engineer
AMS TIM July, 2008 – CERN 1 AMS 02 –Thermal Control System Design AMS-02 Thermal Control System (TCS)
Overview of AMS-02 Changes due the addition of the Permanent Magnet
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Electronics Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Presenter1 Thermal Control R.Eby Impact Boom Stowed and Deployed SWEA STE Magnetometer Bob.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
EMAS Stirling Cooler Operations June 29, 2011 Mike Watson.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Channelization Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Thermal Subsystem Peer Review Objective: To maintain all components of the space craft within their specific temperature range.
Thermionic Valves.
Thermal Radiation Done By: Nujood Al-hashar Abrar Al-haddabi
Payload Safety Review Plan and Issues Leland D. Hill.
Extended Detector Cutoff Considerations WFIRST Project Office May
ESCG\L. D. Hill AMS-02 Permanent Magnet Safety Impact 1 AMS-02-PM Design Review - May 4-5, 2010.
AMS-02 Delta CDR Structural Analysis and Certification Process Carl Lauritzen Structural Analysis Lead Jacobs Engineering
ROCSAT-2 Critical Design Review ISUAL Thermal Interface Design / Analysis Report Jeng-Der (J.D.) Huang ( 黃正德 ) Tsung-Yao (Andy) Chen ( 陳宗耀 ) Jih-Run (J.R.)
Permanent Magnet Impacts to STS/ISS/MOD Chris Tutt 5 May 2010.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
PHASE II FLIGHT-SAFETY REVIEW AMS-02 EXPERIMENT sub-detector SILICON TRACKER Roberto Battiston - AMS-02 Phase II Safety Review - Houston JSC May 21-25,
The integration of 420 m detectors into the LHC
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Thermal Analysis Huade Tan 6/27/05.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
AMS TIM January, Houston 1 AMS 02 –Thermal Control System Design AMS Thermal Control System (TCS): A Status Report Group Leaders: Drj Sun – AIDC,
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Rose Navarro HMI Lead Thermal Engineer
GLAST Large Area Telescope:
5K or not? & TTF module thermal modeling update
Spectrometer Solenoid Update
TTF module thermal modeling
GLAST Large Area Telescope:
Precision Oven Thermal Design
CRATER MODEL ASSUMPTIONS
SNS PPU Cryomodule Thermal Shield
Heat.
SNS PPU Cryomodule Thermal Shield & MLI
Presentation transcript:

AMS-02 Delta CDR Thermal

Overview Changing from Cryomagnet to PM greatly simplifies AMS-02 Thermal requirements – Keeping vacuum Case “cold as possible” is no longer necessary. Analysis cases are also reduced: – Magnet charging – Magnet discharging – Varying Cryocooler power 2

Overview (cont.) Silver-Teflon surface area is greatly reduced (Zenith radiators, CAB, VC). New Tracker Plane 1 (above TRD) will require additional MLI and heaters. Tracker Plane 6 mod (between RICH and ECAL) requires rerouting of TTCS tubing, but TTCS system remains functionally similar (same heat load, etc). 3

AMS-02 Thermal Model Updates 4

Permanent Magnet (PM) The AMS-01 PM model has been integrated into the Vacuum Case (VC). The Cryomagnet magnet was assume to have no affect on VC temperatures. With the additional mass of the PM in the model, VC temperatures are expected to be moderated. 5

Vacuum Case (Cryomagnet not modeled) 6

New PM w/Support Structure Double X structure Permanent Magnet 7

Vacuum Case Optics The STA VC used to house the PM will not have silver-Teflon on the +/- X surfaces. This will now be clear anodized aluminum. This will cause VC temperature to be slightly higher in average, but will reduce specular reflections to ISS and adjacent payload site. 8

VC Optics Silver-Teflon 9

VC Optics Clear Anodized Aluminum 10

Zenith Radiators and Cryocooler LHPs The silver-Teflon radiators will be replaced with a Betacloth MLI blanket. Reduced specular surface area and a reduction of heat generation ( W). Since these surfaces are pointing zenith, there should be little influence on ISS or adjacent payloads. 11

Zenith Radiators Silver-Teflon 12

Zenith Radiators Betacloth 13

Cryocoolers and CCEB Removing cryocoolers from VC Support Rings is a minor geometry change that should have little affect on anything. Boards will be removed from CCEB. This will reduce heat load on Main Radiators 14

Cryocoolers Crycoolers (x4) 15

Cryocoolers 16

CAB and CAB LHP Removing the CAB will change external geometry and remove a source of power (60W, TBC) Removing CAB LHP will slightly reduce heat load on Wake Main Radiator. 17

Dump Diodes The Dump Diodes will be removed from the -X+Y Sill Trunnion Joint This a minor geometry change 18

UPS’s The UPS’s will be removed A minor geometry change 19

Cryo Support Hardware CAB UPS Dump Diodes 20

UPS Dump Diodes Cryo Support Hardware 21

UPS Cryo Support Hardware 22

Cryo Support Hardware 23

New Tracker Plane 1N Modeling and analysis is being performed by Carlo Gavazzi Space. TTCS will not be used to cool Tracker hybrids. Plane 1N will be enclosed in MLI (new). Heaters will be used to maintain Tracker within limits. 24

MLI 25

MLI CFRP Al HC CFRP TRACKER PLANE HYBRIDS COPPER BRAID TRD upper h/c plane IF bracket (X8) MLI HEATER PATCH THERMAL MODELLING 26

Tracker Plane 1N Thermal Preliminary results indicate 160W of heaters can maintain Tracker P1N with limits in the coldest ISS environment. Some heat may be required even in hot cases Detailed implementation and control methods are still in work. Thermal impacts to TRD are also in work. 27

Tracker Plane 6 Thermal Tracker Plane 6 will be relocated between the RICH and the ECAL Cooling will be performed by TTCS system as before. Tubing will have to be rerouted, but TTCS performance should not be significantly impacted. Modifications to MLI are being evaluated. 28

29

30

31