10.9.03Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Dielectron Physics with ALICE Transition Radiation Detector (TRD) Prashant Shukla (for the ALICE TRD Collaboration) Institute of Physics University of.
ALICE seen by a student. FROM CERN webpage FROM
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
sTGC for ATLAS Small Wheel upgrade
2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
Supermodule Space-Frame Integration Backpanel L6C1, L0 Bernd Windelband, Uni Heidelberg ALICE-TRD status meeting, at KIP.
TRD ROC Status Clemens Adler TRD Status Meeting TRD ROC Status.
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
Electron Identification with the ALICE TRD Clemens Adler Physikalisches Institut Heidelberg For the TRD collaboration HCP2005, Les Diablerets, July, 6.
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
TRD Collaboration meeting GSIClemens Adler TRD Production in Heidelberg Manpower/Resources/ Timescales.
TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.
TRD Status meeting GSI Clemens Adler TRD ROC Status.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Scenario for the gas system 1.High cost gas (5 €/l of Xe) 2.High hydrostatic pressure over 7 m height 3.Light and large detectors, no big under- or.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.
Electron Identification with the ALICE TRD Clemens Adler Physikalisches Institut Heidelberg For the TRD collaboration HCP2005, Les Diablerets, July, 6.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Engineering Design Review for TRD-Readout Chamber
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
TRD R&D at GSI  Results from test beam 2004  Plans for test beam Feb. 06  Measurements with X-ray stand C. Garabatos, GSI.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
David Emschermann CBM Collaboration Meeting - GSI – 12/04/2010 TRD geometry in CBMroot and conclusions for detector module design David Emschermann Institut.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
Fast TRD - R&D Status Mihai Petrovici, CBM-Meeting, Feb , 2008, GSI Introduction Short review - First HCRTRD prototypes: - MWPC – w & w/o drift zone.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
1 TRD-prototype test at KEK-FTBL 11/29/07~12/6 Univ. of Tsukuba Hiroki Yokoyama The TRD prototype is borrowed from GSI group (thanks Anton).
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
JINR-BMBF Workshop, Dubna Clemens Adler PI Heidelberg ALICE TRD Transition Radiation Detector Overview and Status Clemens Adler Physikalisches.
Mariana Petris, NIPNE Bucharest CBM Meeting, March 9 -12, 2005 HIGH COUNTING RATE TRANSITION RADIATION DETECTOR Bucharest Prototype In Beam Tests.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Mariana Petris, The 11th Vienna Conference on Instrumentation, Feb. 19 – 24, 2007 High Counting Rate Transition Radiation Detector Mariana Petris, Mihai.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Christian Lippmann (ALICE TRD), DPG-Tagung Köln Position Resolution, Electron Identification and Transition Radiation Spectra with Prototypes.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
T1 status (a selection from EDR presentations)
Presentation transcript:

Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR Dubna, IKF Frankfurt, GSI, PI Heidelberg, KIP Heidelberg, Uni Kaiserslautern, FH Köln, IKP Münster

Technical Forum Alice week Clemens Adler Overview Chamber design: Body, Radiator,Padplane-/panel, Reviews: EDR, PRR Performance: EDR/PRR measurements, test beam results Infrastructure: Detector Control/Gas system Production: Sites, QA, Timescale

Technical Forum Alice week Clemens Adler TRD Chamber Design 540 (324) individual drift chambers (<1450x1220 mm²) Main components: –Radiator –Driftchamber –Padplane + Backpanel Challenge for mechanical design: Large Area, little Material:  high low weight (total: 15% X0) XeCO2(85/15)

Technical Forum Alice week Clemens Adler Radiator Produced at IKP Münster Transition radiation produced by PP-fibres (different foams and fibres tested) Rohacell core between Carbon fibre sheets (2 x 100 µm) Carbon laminate: 2 manufactures in the game (FACC Fischer, AIK Stesalit) Production started mid Feb. 10% milestone reached end of July

Technical Forum Alice week Clemens Adler Driftchamber/Wiring 3 cm Driftregion 2 wire planes : –Cathode: 75µm Cu-Be –Anode: 25µm Au-W wire Moderate gas gain ~5000 Winding frame??  Glueing  Winding

Technical Forum Alice week Clemens Adler Padplane 1.2 million pads Very large Area PCB good precision: challenge Signalwires to be soldered to padplane –Soldering will be done at IKF Frankfurt with dedicated soldering machine

Technical Forum Alice week Clemens Adler Padplane test system Checking for shorts/bad (solder-) connections after soldering (at IKF) Principle: Capacitance measurement between pads and ground plate Labview based system + electronics developed at PI Heidelberg

Technical Forum Alice week Clemens Adler Back Panel Sandwich design build by FACC (Fischer): – Honeycomb between Carbon fibre (100µm) –Additional 2 mm Honeycomb on padplane side to reduce parasitic capacitance Gluing of padplane to 2mm honeycomb very sucessful

Technical Forum Alice week Clemens Adler 6 Layers, 5 colums per ‚Supermodule‘ Small-scale prototype supermodule at Hd Open issues: Connection of services Final Engineering Plan: concentrated effort by JINR Dubna+PI Hd to settle design by end 2003 TRD in Space Frame

Technical Forum Alice week Clemens Adler Milestones: EDR/PRR EDR (Engineering Design Review) Sep Questions adressed: Mechanical stability Gain uniformity, etc. Open questions: Gain uniformity Leak rate (3 mbar*l/h) PRR (Production Readiness Review): April 2003 Question addressed: Final mechanical design Prototype performance Production steps QA procedures Leak rate

Technical Forum Alice week Clemens Adler Prototype measurements Gain non-uniformity < ±15%  tight requirement on backpanel flatness <200µm  Gain dependence of backpanel deformation by overpressure: Gas tightness (driven by cost of Xenon) –Goal: <3 mbar*l/h –Prototype: <0,1 mbar*l/h (optimistic conditions) –Gas interconnections need test in realistic conditions (several chamb.) Agrees well with Garfield calculations + mechanical measurements

Technical Forum Alice week Clemens Adler Test beam results Testbeams at CERN and GSI  TR-Spectrum Pion reject. factor: >100  Signal vs. Drift time

Technical Forum Alice week Clemens Adler Test beam cont. High precision dE/dx measurement  NIM paper in prep. Space charge effects in drift chambers operated with Xe/CO2  NIM paper in prep. Position resolution vs. Gain: ~ µm (  )

Technical Forum Alice week Clemens Adler Detector Controls (DCS) HV+LV : Power supplies decided Minor Problems concerning communication (between electronics)

Technical Forum Alice week Clemens Adler Cooling Tests at CERN last year: –cooling pipe design fixed –cooling seems to be no problem Final tests to be done at Heidelberg (all hardware is available)

Technical Forum Alice week Clemens Adler Services Little space within Supermodule, but all services fit Services towards TOF stay within envelope

Technical Forum Alice week Clemens Adler Gas system Problems: 1)High cost gas (5 €/l of Xe) 2)High hydrostatic pressure over 7 m height 3)Light and large detectors, no big under- or over- pressures affordable 4)Highly segmented detector (540 chambers) Solutions: Gas recirculation, minimal fresh gas injection (1) Pressure regulation subdivided into (groups of) sectors (2,3) Capillary gas inlet and two- stage outlet regulation for ensuring uniform flow and overpressure (2,3) Gas regeneration for Xe recuperation (1,4)

Technical Forum Alice week Clemens Adler Gas system schedule Design practically ready –Need to decide on final regulation segmentation PRR in October (following other gas system PRRs)

Technical Forum Alice week Clemens Adler Chamber Production Sites Production sites: –Heidelberg –Dubna –GSI –Bukarest –(Münster) –(Frankfurt) Philosophy: „Each site does everything“ to be seen...

Technical Forum Alice week Clemens Adler Production QA During production: Tolerances Panel flatness Wiring Field cage Padplane After Production: Electrostatic tests Leak rate Gain (-uniformity) Gas system ready in Hd (Ar/CO2) X-Ray test stand (Dubna/ Hd ): –Okt./Nov Results stored in DCDB (work ongoing) –Labview interface to DB –Interface to HV, O2 meter etc.

Technical Forum Alice week Clemens Adler Schedule 3 Supermodules = 90 chambers have to be ready by 1/2005 production rate per site: 2 chambers/week Production start: Heidelberg: now Dubna: Dec. Bukarest: 1/2004 GSI:4/2004 Material delivery times

Technical Forum Alice week Clemens Adler Summary Chamber design is finalized Prototype performance to spec. TRD Chamber production is starting NOW (material is slowly arriving) at Hd Other institutions getting ready for production